2 resultados para Porto Primavera Dam

em BORIS: Bern Open Repository and Information System - Berna - Suiça


Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND Rubber dam is recommended for isolating the working field during adhesive dentistry procedures; however, dentists often omit rubber dam, particularly in paediatric dentistry, supposing that it would stress the patient. AIM The aim of this study was to evaluate stress parameters during a standardized dental treatment procedure performed with or without rubber dam. The treatment time was measured as a secondary outcome variable. DESIGN This study was designed as a randomized, controlled, clinical study with 72 patients (6-16 years; mean age, 11.1). During standardized fissure sealing procedures, objective parameters of stress (e.g., skin resistance, breath rate) were recorded. The operator's stress level was measured by pulse rate. Subjective pain (patients) and stress perception (operator) were evaluated by an interview. RESULTS The breath rate was significantly (P<0.05) lower and the skin resistance level was significantly higher during treatment with rubber dam compared to the control group. Subjective pain perception was significantly lower for the test group. The treatment time needed for the fissure sealing procedure was 12.4% less in the test group. CONCLUSION Isolation with rubber dam caused less stress in children and adolescents compared to relative isolation with cotton rolls if applied by an experienced dentist.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In terms of changing flow and sediment regimes of rivers, dams are often regarded as the most dominant form of human impact on fluvial systems. Dams can decrease the flux of water and sediments leading to channel changes such as upstream aggradation and downstream degradation. The opposite effects occur when dams are removed. Channel degradation often requires further intervention in terms of river bed and bank protection works. The situation evolves more complex in river systems that are impacted by a series of dams due to feedback processes between the different system compartments. A number of studies have recently investigated geomorphic systems using connectivity approaches to improve the understanding of geomorphic system response to change. This paper presents a case study investigating the impact of dam construction, dam removal and dam-related river bed and bank protection measures on the sediment connectivity and channel morphology of the Fugnitz and the Kaja Rivers using a combination of DEM analyses, field surveys and landscape evolution modelling. For both river systems the results revealed low sediment connectivity accompanied by a fine river bed sediment facies in river sections upstream of active dams and of removed dams with protection measures. Contrarily, high sediment connectivity which was accompanied by a coarse river bed sediment facies was observed in river sections either located downstream of active dams or of removed dams with upstream protection. In terms of channel changes, significant channel degradation was examined at locations downstream of active dams and of removed dams. Channel bed and bank protection measures prevent erosion and channel slope recovery after dam removal. Landscape evolution modeling revealed a complex geomorphic response to dam construction and dam removal as sediment output rates and therefore geomorphic processes have been shown to act in a non-linear manner. These insights are deemed to have major implications for river management and conservation, as quality and state of riverine habitats are determined by channel morphology and river bed sediment composition.