10 resultados para Final Project
em BORIS: Bern Open Repository and Information System - Berna - Suiça
Resumo:
Final project report: Production of radio broadcasting based on the ALS module on decentralization
Resumo:
Final project report: research results and strategy for the promotion of ecotourism in the Blue Triangle Region of Madagascar.
Resumo:
The paper deals with batch scheduling problems in process industries where final products arise from several successive chemical or physical transformations of raw materials using multi–purpose equipment. In batch production mode, the total requirements of intermediate and final products are partitioned into batches. The production start of a batch at a given level requires the availability of all input products. We consider the problem of scheduling the production of given batches such that the makespan is minimized. Constraints like minimum and maximum time lags between successive production levels, sequence–dependent facility setup times, finite intermediate storages, production breaks, and time–varying manpower contribute to the complexity of this problem. We propose a new solution approach using models and methods of resource–constrained project scheduling, which (approximately) solves problems of industrial size within a reasonable amount of time.
Resumo:
The Swiss Swiss Consultant Trust Fund (CTF) support covered the period from July to December 2007 and comprised four main tasks: (1) Analysis of historic land degradation trends in the four watersheds of Zerafshan, Surkhob, Toirsu, and Vanj; (2) Translation of standard CDE GIS training materials into Russian and Tajik to enable local government staff and other specialists to use geospatial data and tools; (3) Demonstration of geospatial tools that show land degradation trends associated with land use and vegetative cover data in the project areas, (4) Preliminary training of government staff in using appropriate data, including existing information, global datasets, inexpensive satellite imagery and other datasets and webbased visualization tools like spatial data viewers, etc. The project allowed building of local awareness of, and skills in, up-to-date, inexpensive, easy-to-use GIS technologies, data sources, and applications relevant to natural resource management and especially to sustainable land management. In addition to supporting the implementation of the World Bank technical assistance activity to build capacity in the use of geospatial tools for natural resource management, the Swiss CTF support also aimed at complementing the Bank supervision work on the ongoing Community Agriculture and Watershed Management Project (CAWMP).
Resumo:
The Centre for Development and Environment (CDE) has been contracted by the World Bank Group to conduct a program on capacity development in use of geospatial tools for natural resource management in Tajikistan. The program aimed to help improving natural resource management by fostering the use of geospatial tools among governmental and non-governmental institutions in Tajikistan. For this purpose a database including a Geographic Information System (GIS) has been prepared, which combines spatial data on various sectors for case study analysis related to the Community Agriculture and Watershed Management Project (CAWMP). The inception report is based on the findings resulting from the Swiss Consultant Trust Fund (CTF) financed project, specifically on the experiences from the awareness creation and training workshop conducted in Dushanbe in November 2007 and the analysis of historical land degradation trends carried out for the four CAWMP watersheds. Furthermore, also recommendations from the inception mission of CDE to Tajikistan (5-20 August 2007) and the inception report for the Swiss CTF support were considered. The inception report for the BNWPP project (The Bank-Netherlands Water Partnership Program) discusses the following project relevant issues: (1) Preliminary list of additional data layers, types of data analysis, and audiences to be covered by BNWPP grant (2) Assessing skills and equipment already available within Tajikistan, and implications for training program and specific equipment procurement plans (3) Updated detailed schedule and plans for all activities to be financed by BNWPP grant, and (4) Proposed list of contents for the final report and web-based presentations.
Resumo:
This presentation is about the inside story of the PhD project El malagueño real, mental y virtual. Configuración de los significados sociales de una variedad urbana in Hispanic Linguistics. That is, the production and perception of the Spanish spoken in the city of Malaga and used on the social network sites Facebook and Tuenti by users from Malaga is analysed. Actually, the southern Spanish variety in question is quite distinct from the national standard in terms of its phonetic features, its prestige, and the attitudes to it. Thus, the project started with the initial interest in «Why do people often communicate in very “strange” ways on social media» which then slightly changed to the final research interest in «What do the different non-standard variants mean in virtual (and real) malagueño?». This long – sometimes hazardous, yet mostly fun – process is exposed in more detail by looking at the research questions, the methods and results. Lastly, the presentation concludes with some lessons learnt and an outlook on possibilities and necessities for further investigation.