3 resultados para Collaborative planning

em BORIS: Bern Open Repository and Information System - Berna - Suiça


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The Swiss Alps will experience pronounced effects of climate change due to the combination of their latitudinal positioning, altitude and unique ecosystems, placing socio-economic stresses on alpine communities, many of which rely on seasonal tourism. Studies into tourism adaptation within the Swiss Alps have so far focused on the technical adaptation options of alpine stakeholders, rather than perceptions of adaptation to climate change at the operational and community level. This article investigates attitudes to adaptation in two alpine regions within Switzerland's well-established decentralized political framework, through semi-structured qualitative interviews. Stakeholders focused almost entirely on maintaining the status quo of winter tourism, through technical or marketing measures, with mixed attitudes towards climatic impacts. A matrix based on the relative internal strengths and weaknesses, external opportunities and threats of adaptation measures (a SWOT framework) was used to assess the measures and suggest how stakeholders could capitalize on the new opportunities thrown up by climate change to create a competitive advantage. A comprehensive and collaborative planning approach is vital to enable policy makers and stakeholders to maximize opportunities, minimize the adverse effects of climate change on the local economy, and develop inclusive adaptation measures that benefit the entire region in order to create more sustainable social, economic and environmental structures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: Prognostic models for children starting antiretroviral therapy (ART) in Africa are lacking. We developed models to estimate the probability of death during the first year receiving ART in Southern Africa. METHODS: We analyzed data from children ≤10 years old who started ART in Malawi, South Africa, Zambia or Zimbabwe from 2004-2010. Children lost to follow-up or transferred were excluded. The primary outcome was all-cause mortality in the first year of ART. We used Weibull survival models to construct two prognostic models: one with CD4%, age, WHO clinical stage, weight-for-age z-score (WAZ) and anemia and one without CD4%, because it is not routinely measured in many programs. We used multiple imputation to account for missing data. RESULTS: Among 12655 children, 877 (6.9%) died in the first year of ART. 1780 children were lost to follow-up/transferred and excluded from main analyses; 10875 children were included. With the CD4% model probability of death at 1 year ranged from 1.8% (95% CI: 1.5-2.3) in children 5-10 years with CD4% ≥10%, WHO stage I/II, WAZ ≥-2 and without severe anemia to 46.3% (95% CI: 38.2-55.2) in children <1 year with CD4% <5%, stage III/IV, WAZ< -3 and severe anemia. The corresponding range for the model without CD4% was 2.2% (95% CI: 1.8-2.7) to 33.4% (95% CI: 28.2-39.3). Agreement between predicted and observed mortality was good (C-statistics=0.753 and 0.745 for models with and without CD4% respectively). CONCLUSION: These models may be useful to counsel children/caregivers, for program planning and to assess program outcomes after allowing for differences in patient disease severity characteristics.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Environmental policy and decision-making are characterized by complex interactions between different actors and sectors. As a rule, a stakeholder analysis is performed to understand those involved, but it has been criticized for lacking quality and consistency. This lack is remedied here by a formal social network analysis that investigates collaborative and multi-level governance settings in a rigorous way. We examine the added value of combining both elements. Our case study examines infrastructure planning in the Swiss water sector. Water supply and wastewater infrastructures are planned far into the future, usually on the basis of projections of past boundary conditions. They affect many actors, including the population, and are expensive. In view of increasing future dynamics and climate change, a more participatory and long-term planning approach is required. Our specific aims are to investigate fragmentation in water infrastructure planning, to understand how actors from different decision levels and sectors are represented, and which interests they follow. We conducted 27 semi-structured interviews with local stakeholders, but also cantonal and national actors. The network analysis confirmed our hypothesis of strong fragmentation: we found little collaboration between the water supply and wastewater sector (confirming horizontal fragmentation), and few ties between local, cantonal, and national actors (confirming vertical fragmentation). Infrastructure planning is clearly dominated by engineers and local authorities. Little importance is placed on longer-term strategic objectives and integrated catchment planning, but this was perceived as more important in a second analysis going beyond typical questions of stakeholder analysis. We conclude that linking a stakeholder analysis, comprising rarely asked questions, with a rigorous social network analysis is very fruitful and generates complementary results. This combination gave us deeper insight into the socio-political-engineering world of water infrastructure planning that is of vital importance to our well-being.