4 resultados para Coastal zone management
em BORIS: Bern Open Repository and Information System - Berna - Suiça
A systemic biomass management analysis of small-scale farmers in the hill-zone of western Tajikistan
Resumo:
The main goals of this study were to identifythe alpine torrent catchments that are sensitive to climatic changes and to assess the robustness of the methods for the elaboration of flood and debris flow hazard zone maps to specific effects of climate changes. In this study, a procedure for the identification and localization of torrent catchments in which the climate scenarios will modify the hazard situation was developed. In two case studies, the impacts of a potential increase of precipitation intensities to the delimited hazard zones were studied. The identification and localization of the torrent and river catchments, where unfavourable changes in the hazard situation occur, could eliminate speculative and unnecessary measures against the impacts of climate changes like a general enlargement of hazard zones or a general over dimensioning of protection structures for the whole territory. The results showed a high spatial variability of the sensitivity of catchments to climate changes. In sensitive catchments, the sediment management in alpine torrents will meet future challenges due to a higher rate for sediment removal from retention basins. The case studies showed a remarkable increase of the areas affected by floods and debris flow when considering possible future precipitation intensities in hazard mapping. But, the calculated increase in extent of future hazard zones lay within the uncertainty of the methods used today for the delimitation of the hazard zones. Thus, the consideration of the uncertainties laying in the methods for the elaboration of hazard zone maps in the torrent and river catchments sensitive to climate changes would provide a useful instrument for the consideration of potential future climate conditions. The study demonstrated that weak points in protection structures in future will become more important in risk management activities.
Resumo:
Technical complications in implant prosthetic cases represent a major challenge in dentistry. This case report describes minimally invasive management to recover an implant with a fractured remnant of a zirconia abutment, including provisional rehabilitation during a sequential treatment protocol in the esthetic zone. A patient was treated with a screw-retained one-piece implant-supported reconstruction made of a customized zirconia abutment with direct ceramic veneering in the maxillary right central incisor position. During the prosthetic try-in, a fracture in the apical portion of the abutment was evident. The first rescue attempt led to fracture of the retrieval instrument. Immediately, an individualized wired construction was applied to bond the existing fractured reconstruction to the neighboring teeth to maintain the peri-implant mucosal architecture. Because the implant screw canal was blocked, a customized round bur had to be manufactured and was placed in the implant axis with a specific bracket tool from the service set to protect the interior implant threads. Then, the drills of the service set were guided by the newly created access to remove the fractured remnants. The implant screw was retapped and the area rinsed with chlorhexidine solution. All remnants were removed without the need for surgical intervention. Neither the implant connection nor the bone-to-implant interface was damaged. The stepwise treatment approach with the customized round bur combined with the system-specific drills of the service set saved the blocked implant so that the patient could be successfully rehabilitated with a new implant reconstruction.