64 resultados para Pedagogic projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The benefits companies achieve by implementing an ERP system vary considerably. Many companies need to adapt their ERP integration solution in the post-implementation stage. But after the completion of such a usually very complex integration project, benefits do not emerge by all means. A misfit between the organization and the IS, especially the aspect of cross-functional team collaboration, could explain these divergences. Using an initial theoretical framework, we conducted a single case study to explore the team-oriented perceptions in a post-implementation ERP integration project. To analyze the benefits and the influences in greater depth we disentangled the integration benefits into their particular parts (process, system and information quality). Our findings show that post-implementation ERP integration changes are not always perceived as beneficiary by the involved teams and that cross-functional collaboration has an important influence.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The increasing practice of offshore outsourcing software maintenance has posed the challenge of effectively transferring knowledge to individual software engineers of the vendor. In this theoretical paper, we discuss the implications of two learning theories, the model of work-based learning (MWBL) and cognitive load theory (CLT), for knowledge transfer during the transition phase. Taken together, the theories suggest that learning mechanisms need to be aligned with the type of knowledge (tacit versus explicit), task characteristics (complexity and recurrence), and the recipients’ expertise. The MWBL proposes that learning mechanisms need to include conceptual and practical activities based on the relative importance of explicit and tacit knowledge. CLT explains how effective portfolios of learning mechanisms change over time. While jobshadowing, completion tasks, and supportive information may prevail at the outset of transition, they may be replaced by the work on conventional tasks towards the end of transition.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective: Two patient-focused long-term research projects performed in the German outpatient psychotherapy system are focused on in this article. The TK (Techniker Krankenkasse) project is the first study to evaluate a quality assurance and feedback system with regard to its practical feasibility in German routine care. The other study (“Quality Assurance in Outpatient Psychotherapy in Bavaria”; QS-PSY-BAY) was designed to test a new approach for quality assurance in outpatient psychotherapy using electronic documentation of patient characteristics and outcome parameters. In addition this project provides the opportunity to analyze data on health-related costs for the patients undergoing outpatient psychotherapy. Method: Both projects and their results indicating high effect sizes are briefly described. Results: From the perspectives of the research teams, advisory boards and other stakeholders, the experiences with these projects are discussed focusing on obstacles, challenges, difficulties, and benefits in developing and implementing the studies. The triangle collaboration of therapists, researchers, and health insurance companies/health service institutions turned out to be fruitful in both studies. Conclusions: Despite some controversies between the partners the experiences indicate the importance of practiced-research collaborations to provide relevant information about the delivery of outpatient psychotherapy in the health system

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gaining economic benefits from substantially lower labor costs has been reported as a major reason for offshoring labor-intensive information systems services to low-wage countries. However, if wage differences are so high, why is there such a high level of variation in the economic success between offshored IS projects? This study argues that offshore outsourcing involves a number of extra costs for the ^his paper was recommended for acceptance by Associate Guest Editor Erran Carmel. client organization that account for the economic failure of offshore projects. The objective is to disaggregate these extra costs into their constituent parts and to explain why they differ between offshored software projects. The focus is on software development and maintenance projects that are offshored to Indian vendors. A theoretical framework is developed a priori based on transaction cost economics (TCE) and the knowledge-based view of the firm, comple mented by factors that acknowledge the specific offshore context The framework is empirically explored using a multiple case study design including six offshored software projects in a large German financial service institution. The results of our analysis indicate that the client incurs post contractual extra costs for four types of activities: (1) re quirements specification and design, (2) knowledge transfer, (3) control, and (4) coordination. In projects that require a high level of client-specific knowledge about idiosyncratic business processes and software systems, these extra costs were found to be substantially higher than in projects where more general knowledge was needed. Notably, these costs most often arose independently from the threat of oppor tunistic behavior, challenging the predominant TCE logic of market failure. Rather, the client extra costs were parti cularly high in client-specific projects because the effort for managing the consequences of the knowledge asymmetries between client and vendor was particularly high in these projects. Prior experiences of the vendor with related client projects were found to reduce the level of extra costs but could not fully offset the increase in extra costs in highly client-specific projects. Moreover, cultural and geographic distance between client and vendor as well as personnel turnover were found to increase client extra costs. Slight evidence was found, however, that the cost-increasing impact of these factors was also leveraged in projects with a high level of required client-specific knowledge (moderator effect).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Microsoft Project is one of the most-widely used software packages for project management. For the scheduling of resource-constrained projects, the package applies a priority-based procedure using a specific schedule-generation scheme. This procedure performs relatively poorly when compared against other software packages or state-of-the-art methods for resource-constrained project scheduling. In Microsoft Project 2010, it is possible to work with schedules that are infeasible with respect to the precedence or the resource constraints. We propose a novel schedule-generation scheme that makes use of this possibility. Under this scheme, the project tasks are scheduled sequentially while taking into account all temporal and resource constraints that a user can define within Microsoft Project. The scheme can be implemented as a priority-rule based heuristic procedure. Our computational results for two real-world construction projects indicate that this procedure outperforms the built-in procedure of Microsoft Project