105 resultados para Lot-scheduling
Resumo:
The execution of a project requires resources that are generally scarce. Classical approaches to resource allocation assume that the usage of these resources by an individual project activity is constant during the execution of that activity; in practice, however, the project manager may vary resource usage over time within prescribed bounds. This variation gives rise to the project scheduling problem which consists in allocating the scarce resources to the project activities over time such that the project duration is minimized, the total number of resource units allocated equals the prescribed work content of each activity, and various work-content-related constraints are met. We formulate this problem for the first time as a mixed-integer linear program. Our computational results for a standard test set from the literature indicate that this model outperforms the state-of-the-art solution methods for this problem.
Resumo:
This paper deals with scheduling batch (i.e., discontinuous), continuous, and semicontinuous production in process industries (e.g., chemical, pharmaceutical, or metal casting industries) where intermediate storage facilities and renewable resources (processing units and manpower) of limited capacity have to be observed. First, different storage configurations typical of process industries are discussed. Second, a basic scheduling problem covering the three above production modes is presented. Third, (exact and truncated) branch-and-bound methods for the basic scheduling problem and the special case of batch scheduling are proposed and subjected to an experimental performance analysis. The solution approach presented is flexible and in principle simple, and it can (approximately) solve relatively large problem instances with sufficient accuracy.
Resumo:
Car manufacturers increasingly offer delivery programs for the factory pick-up of new cars. Such a program consists of a broad range of event-marketing activities. In this paper we investigate the problem of scheduling the delivery program activities of one day such that the sum of the customers’ waiting times is minimized. We show how to model this problem as a resource-constrained project scheduling problem with nonregular objective function, and we present a relaxation-based beam-search solution heuristic. The relaxations are solved by exploiting a duality relationship between temporal scheduling and min-cost network flow problems. This approach has been developed in cooperation with a German automaker. The performance of the heuristic has been evaluated based on practical and randomly generated test instances.
Resumo:
We study a real-world scheduling problem arising in the context of a rolling ingots production. First we review the production process and discuss peculiarities that have to be observed when scheduling a given set of production orders on the production facilities. We then show how to model this scheduling problem using prescribed time lags between operations, different kinds of resources, and sequence-dependent changeovers. A branch-and-bound solution procedure is presented in the second part. The basic principle is to relax the resource constraints by assuming infinite resource availability. Resulting resource conflicts are then stepwise resolved by introducing precedence relationships among operations competing for the same resources. The algorithm has been implemented as a beam search heuristic enumerating alternative sets of precedence relationships.