23 resultados para Lean Manufacturing, Make to Order Manufacturing, Time Study, Kanban, Rapid Performance Management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Quality data are not only relevant for successful Data Warehousing or Business Intelligence applications; they are also a precondition for efficient and effective use of Enterprise Resource Planning (ERP) systems. ERP professionals in all kinds of businesses are concerned with data quality issues, as a survey, conducted by the Institute of Information Systems at the University of Bern, has shown. This paper demonstrates, by using results of this survey, why data quality problems in modern ERP systems can occur and suggests how ERP researchers and practitioners can handle issues around the quality of data in an ERP software Environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

OBJECTIVES: To examine smoking behaviour, former quit attempts and intention to quit among Swiss adolescents and young adults over five year's time. STUDY DESIGN: five-year longitudinal study (2003, 2005 and 2008) based on a random urban community sample (N = 1345 complete cases). METHODS: Data were collected by computer-assisted telephone interviews with adolescents (16-17) and young adults (18-24). Main outcome measures included self-reported smoking behaviour, former quit attempts, smoking cessation methods and current intentions to quit smoking. RESULTS: Adolescents were more often non-smokers and less often daily smokers when compared to young adults at baseline (χ(2)(4) = 28.68, P < .001). Their smoking behaviour increased significantly from baseline to follow-up (T = 1445.50, r = .20, P < .001) in contrast to the stable smoking behaviour in young adults (χ(2)(2) = .12, n.s.). In longitudinal analyses young adults were also more stable in their smoking status at the later measurement points. In comparison adolescents changed their smoking status more often being non-smokers at baseline and smokers later on. Independently of the age group, the majority of smokers already had previously attempted to quit (65%) or intended to give up smoking at some point (72%). However only 17% were motivated to make the quit attempt within the next 6 months. Self-quitting was the preferred method, and 25% of the self-quitters had been successful. CONCLUSION: This study illustrates that different developments in smoking behaviour exist in adolescents and young adults. Our study reveals that a majority of smokers are willing to quit but often fail. Furthermore, the data indicates that for adolescents the focus should lie on primary prevention.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

PURPOSE To compare time-efficiency in the production of implant crowns using a digital workflow versus the conventional pathway. MATERIALS AND METHODS This prospective clinical study used a crossover design that included 20 study participants receiving single-tooth replacements in posterior sites. Each patient received a customized titanium abutment plus a computer-aided design/computer-assisted manufacture (CAD/CAM) zirconia suprastructure (for those in the test group, using digital workflow) and a standardized titanium abutment plus a porcelain-fused-to-metal crown (for those in the control group, using a conventional pathway). The start of the implant prosthetic treatment was established as the baseline. Time-efficiency analysis was defined as the primary outcome, and was measured for every single clinical and laboratory work step in minutes. Statistical analysis was calculated with the Wilcoxon rank sum test. RESULTS All crowns could be provided within two clinical appointments, independent of the manufacturing process. The mean total production time, as the sum of clinical plus laboratory work steps, was significantly different. The mean ± standard deviation (SD) time was 185.4 ± 17.9 minutes for the digital workflow process and 223.0 ± 26.2 minutes for the conventional pathway (P = .0001). Therefore, digital processing for overall treatment was 16% faster. Detailed analysis for the clinical treatment revealed a significantly reduced mean ± SD chair time of 27.3 ± 3.4 minutes for the test group compared with 33.2 ± 4.9 minutes for the control group (P = .0001). Similar results were found for the mean laboratory work time, with a significant decrease of 158.1 ± 17.2 minutes for the test group vs 189.8 ± 25.3 minutes for the control group (P = .0001). CONCLUSION Only a few studies have investigated efficiency parameters of digital workflows compared with conventional pathways in implant dental medicine. This investigation shows that the digital workflow seems to be more time-efficient than the established conventional production pathway for fixed implant-supported crowns. Both clinical chair time and laboratory manufacturing steps could be effectively shortened with the digital process of intraoral scanning plus CAD/CAM technology.