19 resultados para International management strategy
Resumo:
BACKGROUND Atypical meningiomas are an intermediate grade brain tumour with a recurrence rate of 39-58 %. It is not known whether early adjuvant radiotherapy reduces the risk of tumour recurrence and whether the potential side-effects are justified. An alternative management strategy is to perform active monitoring with magnetic resonance imaging (MRI) and to treat at recurrence. There are no randomised controlled trials comparing these two approaches. METHODS/DESIGN A total of 190 patients will be recruited from neurosurgical/neuro-oncology centres across the United Kingdom, Ireland and mainland Europe. Adult patients undergoing gross total resection of intracranial atypical meningioma are eligible. Patients with multiple meningioma, optic nerve sheath meningioma, previous intracranial tumour, previous cranial radiotherapy and neurofibromatosis will be excluded. Informed consent will be obtained from patients. This is a two-stage trial (both stages will run in parallel): Stage 1 (qualitative study) is designed to maximise patient and clinician acceptability, thereby optimising recruitment and retention. Patients wishing to continue will proceed to randomisation. Stage 2 (randomisation) patients will be randomised to receive either early adjuvant radiotherapy for 6 weeks (60 Gy in 30 fractions) or active monitoring. The primary outcome measure is time to MRI evidence of tumour recurrence (progression-free survival (PFS)). Secondary outcome measures include assessing the toxicity of the radiotherapy, the quality of life, neurocognitive function, time to second line treatment, time to death (overall survival (OS)) and incremental cost per quality-adjusted life year (QALY) gained. DISCUSSION ROAM/EORTC-1308 is the first multi-centre randomised controlled trial designed to determine whether early adjuvant radiotherapy reduces the risk of tumour recurrence following complete surgical resection of atypical meningioma. The results of this study will be used to inform current neurosurgery and neuro-oncology practice worldwide. TRIAL REGISTRATION ISRCTN71502099 on 19 May 2014.
Resumo:
BACKGROUND Overtreatment of asymptomatic bacteriuria (ASB) is widespread and may result in antibiotic side-effects, excess costs to the healthcare system, and may potentially trigger antimicrobial resistance. According to international management guidelines, ASB is not an indication for antibiotic treatment (with few exceptions). AIM To determine reasons for using antibiotics to treat ASB in the absence of a treatment indication. METHODS A qualitative study was conducted at a tertiary care hospital in Switzerland during 2011. We interviewed 21 internal medicine residents and attending physicians selected by purposive sampling, using a semi-structured questionnaire. Responses were analysed in an inductive thematic content approach using dedicated software (MAXQDA(®)). FINDINGS In the 21 interviews, the following thematic rationales for antibiotic overtreatment of ASB were reported (in order of reporting frequency): (i) treating laboratory findings without taking the clinical picture into account (N = 17); (ii) psychological factors such as anxiety, overcautiousness, or anticipated positive impact on patient outcomes (N = 13); (iii) external pressors such as institutional culture, peer pressure, patient expectation, and excessive workload that interferes with proper decision-making (N = 9); (iv) difficulty with interpreting clinical signs and symptoms (N = 8). CONCLUSION In this qualitative study we identified both physician-centred factors (e.g. overcautiousness) and external pressors (e.g. excessive workload) as motivators for prescribing unnecessary antibiotics. Also, we interpreted the frequently cited practice of treating asymptomatic patients based on laboratory findings alone as lack of awareness of evidence-based best practices.
Resumo:
This Strategy and Action Plan was written within the framework of the project on Sustainable Land Management in the High Pamir and Pamir-Alai Mountains (PALM). PALM is an integrated transboundary initiative of the governments of the Kyrgyz Republic and the Republic of Tajikistan. It aims to address the interlinked problems of land degradation and poverty within a region that is one of Central Asia’s crucial sources of freshwater and a location of biodiversity hotspots. The project is executed by the Committee on Environment Protection in Tajikistan and the National Center for Mountain Regions Development in Kyrgyzstan, with fi nancial support from the Global Environment Facility (GEF) and other donors. The United Nations Environment Programme (UNEP) is the GEF Implementing Agency for the project, and the United Nations University (UNU) is the International Executing Agency. This Strategy and Action Plan integrates the work of three main teams of experts, namely the Pamir-Alai Transboundary Strategy and Action Plan (PATSAP) team, the Legal Task Forces, and a team of Natural Disaster Risk specialists. The PATSAP team was coordinated by the Centre for Development and Environment (CDE), University of Bern, Switzerland. The Legal Task Force was led by the Australian Centre for Agriculture and Law of the University of New England (UNE), and responsibility for the Natural Disaster Risk assessment was with the Central- Asian Institute of Applied Geosciences (CAIAG) in Bishkek, Kyrgyzstan. The development of the strategy took place from June 2009 to October 2010. The activities included fi eld study tours for updating the information base with fi rst-hand information from the local level, coordination meetings with actors from the region, and two multi-level stakeholder forums conducted in Khorog and Osh to identify priorities and to collect ideas for concrete action plans. The baseline information collected for the Strategy and Action Plan has been compiled by the experts and made available as reports1. A joint multi-level stakeholder forum was conducted in Jirgitol, Tajikistan, for in-depth discussion of the transboundary aspects. In August 2010, the draft Strategy and Action Plan was distributed among local, national, and international actors for consultation, and their comments were discussed at feedback forums in Khorog and Bishkek. This Strategy and Action Plan is intended as a recommendation. Nevertheless, it proposes concrete mechanisms for implementing the proposed sustainable land management (SLM) activities: The Regional Natural Resources Governance Framework provides the legal and policy concepts, principles, and regulatory requirements needed to create an enabling environment for SLM in the High Pamir and Pamir-Alai region at the transboundary, national, and local levels. The priority directions outlined provide a framework for the elaboration of rayon-level strategies and for strategies on specifi c topics (forestry, livestock, etc.), as well as for further development of government programmes and international projects. The action plans may serve as a pool of concrete ideas, which can be taken up by diff erent institutions and in smaller or larger projects. Finally, this document provides a basis for the elaboration and signing of targeted cooperation agreements on land use and management between the leaders of Osh oblast (Kyrgyz Republic), Gorno Badakhshan Autonomous Oblast, and Jirgitol rayon (Republic of Tajikistan).