6 resultados para integrated digital modelling

em AMS Tesi di Laurea - Alm@DL - Università di Bologna


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Currently making digital 3D models and replicas of the cultural heritage assets play an important role in the preservation and having a high detail source for future research and intervention. In this dissertation, it is tried to assess different methods for digital surveying and making 3D replicas of cultural heritage assets in different scales of size. The methodologies vary in devices, software, workflow, and the amount of skill that is required. The three phases of the 3D modelling process are data acquisition, modelling, and model presentation. Each of these sections is divided into sub-sections and there are several approaches, methods, devices, and software that may be employed, furthermore, the selection process should be based on the operation's goal, available facilities, the scale and properties of the object or structure to be modeled, as well as the operators' expertise and experience. The most key point to remember is that the 3D modelling operation should be properly accurate, precise, and reliable; therefore, there are so many instructions and pieces of advice on how to perform 3D modelling effectively. It is an attempt to compare and evaluate the various ways of each phase in order to explain and demonstrate their differences, benefits, and drawbacks in order to serve as a simple guide for new and/or inexperienced users.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The thesis explores recent technology developments in the field of structural health monitoring and its application to railway bridge projects. It focuses on two main topics. First, service loads and effect of environmental actions are modelled. In particular, the train moving load and its interaction with rail track is considered with different degrees of detail. Hence, results are compared with real-time experimental measurements. Secondly, the work concerns the identification, definition and modelling process of damages for a prestressed concrete railway bridge, and their implementation inside FEM models. Along with a critical interpretation of the in-field measurements, this approach results in the development of undamaged and damaged databases for the AI-aided detection of anomalies and the definition of threshold levels to prompt automatic alert interventions. In conclusion, an innovative solution for the development of the railway weight-in-motion system is proposed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Modern society is now facing significant difficulties in attempting to preserve its architectural heritage. Numerous challenges arise consequently when it comes to documentation, preservation and restoration. Fortunately, new perspectives on architectural heritage are emerging owing to the rapid development of digitalization. Therefore, this presents new challenges for architects, restorers and specialists. Additionally, this has changed the way they approach the study of existing heritage, changing from conventional 2D drawings in response to the increasing requirement for 3D representations. Recently, Building Information Modelling for historic buildings (HBIM) has escalated as an emerging trend to interconnect geometrical and informational data. Currently, the latest 3D geomatics techniques based on 3D laser scanners with enhanced photogrammetry along with the continuous improvement in the BIM industry allow for an enhanced 3D digital reconstruction of historical and existing buildings. This research study aimed to develop an integrated workflow for the 3D digital reconstruction of heritage buildings starting from a point cloud. The Pieve of San Michele in Acerboli’s Church in Santarcangelo Di Romagna (6th century) served as the test bed. The point cloud was utilized as an essential referential to model the BIM geometry using Autodesk Revit® 2022. To validate the accuracy of the model, Deviation Analysis Method was employed using CloudCompare software to determine the degree of deviation between the HBIM model and the point cloud. The acquired findings showed a very promising outcome in the average distance between the HBIM model and the point cloud. The conducted approach in this study demonstrated the viability of producing a precise BIM geometry from point clouds.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The scope of this project is to study the effectiveness of building information modelling (BIM) in performing life cycle assessment in a building. For the purposes of the study will be used “Revit” which is a BIM software and Tally which is an LCA tool integrated in Revit. The project is divided in six chapters. The first chapter consists of a theoretical introduction into building information modelling and its connection to life cycle assessment. The second chapter describes the characteristics of building information modelling (BIM). In addition, a comparison has been made with the traditional architectural, engineering and construction business model and the benefits to shift into BIM. In the third chapter it will be a review of the most well-known and available BIM software in the market. In chapter four life cycle assessment (LCA) will be described in general and later on specifically for the purpose of the case study that will be used in the following chapter. Moreover, the tools that are available to perform an LCA will be reviewed. Chapter five will present the case study that consists of a model in a BIM software (Revit) and the LCA performed by Tally, an LCA tool integrated into Revit. In the last chapter will be a discussion of the results that were obtained, the limitation and the possible future improvement in performing life cycle assessment (LCA) in a BIM model.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Integrated Coastal Zone Management (ICZM) should be considered as one of the main components to be able to implement sustainable development. Friuli Venezia Giulia region with its 93 km of coastline is committed to investing its resources in projects aimed at studying the evolution of the coast. In this report, reference will be made to the area in front of the municipality of Grado, where the Banco della Mula di Muggia is located. Starting from previous studies and surveys, morphology of the coastal stretch between the municipality of Grado and the mouth of the Isonzo river will be reproduced through numerical modeling tools, to simulate its hydrodynamic behavior on an annual basis and also as a function of significant events such as storms, calm events or floods of the Isonzo river. The software employed will be the MIKE by DHI with in particular the implementation of "Littoral Drift" and "MIKE 21/3" Coupled models. The first to calculate net and gross longshore transport on an annual basis along a transverse profile, the latter is a modelling system for coastal application that will be used for the analysis of significant events effects. Although not primary focus of this work, there will be included an initial review of finger bars. These particular sand formations are present at the south-western border of the Banco della Mula di Muggia and may have an impact on it. This work could form the starting point of future investigations to build on the findings of this report.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this thesis is to use the developments, advantages and applications of "Building Information Modelling" (BIM) with emphasis on the discipline of structural design for steel building located in Perugia. BIM was mainly considered as a new way of planning, constructing and operating buildings or infrastructures. It has been found to offer greater opportunities for increased efficiency, optimization of resources and generally better management throughout the life cycle of a facility. BIM increases the digitalization of processes and offers integrated and collaborative technologies for design, construction and operation. To understand BIM and its benefits, one must consider all phases of a project. Higher initial design costs often lead to lower construction and operation costs. Creating data-rich digital models helps to better predict and coordinate the construction phases and operation of a building. One of the main limitations identified in the implementation of BIM is the lack of knowledge and qualified professionals. Certain disciplines such as structural and mechanical design depend on whether the main contractor, owner, general contractor or architect need to use or apply BIM to their projects. The existence of a supporting or mandatory BIM guideline may then eventually lead to its adoption. To test the potential of the BIM adoption in the steel design process, some models were developed taking advantage of a largely diffuse authoring software (Autodesk Revit), to produce construction drawings and also material schedule that were needed in order to estimate quantities and features of a real steel building. Once the model has been built the whole process has been analyzed and then compared with the traditional design process of steel structure. Many relevant aspect in term of clearness and also in time spent were shown and lead to final conclusions about the benefits from BIM methodology.