3 resultados para Professional Life Cycle of the Teacher
em AMS Tesi di Laurea - Alm@DL - Università di Bologna
Resumo:
The scope of this project is to study the effectiveness of building information modelling (BIM) in performing life cycle assessment in a building. For the purposes of the study will be used “Revit” which is a BIM software and Tally which is an LCA tool integrated in Revit. The project is divided in six chapters. The first chapter consists of a theoretical introduction into building information modelling and its connection to life cycle assessment. The second chapter describes the characteristics of building information modelling (BIM). In addition, a comparison has been made with the traditional architectural, engineering and construction business model and the benefits to shift into BIM. In the third chapter it will be a review of the most well-known and available BIM software in the market. In chapter four life cycle assessment (LCA) will be described in general and later on specifically for the purpose of the case study that will be used in the following chapter. Moreover, the tools that are available to perform an LCA will be reviewed. Chapter five will present the case study that consists of a model in a BIM software (Revit) and the LCA performed by Tally, an LCA tool integrated into Revit. In the last chapter will be a discussion of the results that were obtained, the limitation and the possible future improvement in performing life cycle assessment (LCA) in a BIM model.
Resumo:
This work assesses the environmental impact of a municipal solid waste incinerator with energy recovery in Forlì-Cesena province (Emilia-Romagna region, Italy). The methodology used is Life Cycle Assessment (LCA). As the plant already applies the best technologies available in waste treatment, this study focuses on the fate of the residues (bottom and fly ash) produced during combustion. Nine scenarios are made, based on different ash treatment disposing/recycling techniques. The functional unit is the amount of waste incinerated in 2011. Boundaries are set from waste arrival in the plant to the disposal/recovery of the residues produced, with energy recovery. Only the operative period is considered. Software used is GaBi 4 and the LCIA method used is CML2001. The impact categories analyzed are: abiotic depletion, acidification, eutrophication, freshwater aquatic ecotoxicity, global warming, human toxicity, ozone layer depletion, photochemical oxidant formation, terrestrial ecotoxicity and primary energy demand. Most of the data are taken from Herambiente. When primary data are not available, data from Ecoinvent and GaBi databases or literature data are used. The whole incineration process is sustainable, due to the relevant avoided impact given by co-generator. As far as regards bottom ash treatment, the most influential process is the impact savings from iron recovery. Bottom ash recycling in road construction or as building material are both valid alternatives, even if the first option faces legislative limits in Italy. Regarding fly ash inertization, the adding of cement and Ferrox treatment results the most feasible alternatives. However, this inertized fly ash can maintain its hazardous nature. The only method to ensure the stability of an inertized fly ash is to couple two different stabilization treatments. Ash stabilization technologies shall improve with the same rate of the flexibility of the national legislation about incineration residues recycling.
Resumo:
The present work is included in the context of the assessment of sustainability in the construction field and is aimed at estimating and analyzing life cycle cost of the existing reinforced concrete bridge “Viadotto delle Capre” during its entire life. This was accomplished by a comprehensive data collection and results evaluation. In detail, the economic analysis of the project is performed. The work has investigated possible design alternatives for maintenance/rehabilitation and end-of-life operations, when structural, functional, economic and also environmental requirements have to be fulfilled. In detail, the economic impact of different design options for the given reinforced concrete bridge have been assessed, whereupon the most economically, structurally and environmentally efficient scenario was chosen. The Integrated Life-Cycle Analysis procedure and Environmental Impact Assessment were also discussed in this work. The scope of this thesis is to illustrate that Life Cycle Cost analysis as part of Life Cycle Assessment approach could be effectively used to drive the design and management strategy of new and existing structures. The final objective of this contribution is to show how an economic analysis can influence decision-making in the definition of the most sustainable design alternatives. The designers can monitor the economic impact of different design strategies in order to identify the most appropriate option.