3 resultados para Oil storage tanks

em AMS Tesi di Laurea - Alm@DL - Università di Bologna


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Natural hazards affecting industrial installations could directly or indirectly cause an accident or series of accidents with serious consequences for the environment and for human health. Accidents initiated by a natural hazard or disaster which result in the release of hazardous materials are commonly referred to as Natech (Natural Hazard Triggering a Technological Disaster) accidents. The conditions brought about by these kinds of events are particularly problematic, the presence of the natural event increases the probability of exposition and causes consequences more serious than standard technological accidents. Despite a growing body of research and more stringent regulations for the design and operation of industrial activities, Natech accidents remain a threat. This is partly due to the absence of data and dedicated risk-assessment methodologies and tools. Even the Seveso Directives for the control of risks due to major accident hazards do not include any specific impositions regarding the management of Natech risks in the process industries. Among the few available tools there is the European Standard EN 62305, which addresses generic industrial sites, requiring to take into account the possibility of lightning and to select the appropriate protection measures. Since it is intended for generic industrial installations, this tool set the requirements for the design, the construction and the modification of structures, and is thus mainly oriented towards conventional civil building. A first purpose of this project is to study the effects and the consequences on industrial sites of lightning, which is the most common adverse natural phenomenon in Europe. Lightning is the cause of several industrial accidents initiated by natural causes. The industrial sectors most susceptible to accidents triggered by lightning is the petrochemical one, due to the presence of atmospheric tanks (especially floating roof tanks) containing flammable vapors which could be easily ignited by a lightning strike or by lightning secondary effects (as electrostatic and electromagnetic pulses or ground currents). A second purpose of this work is to implement the procedure proposed by the European Standard on a specific kind of industrial plant, i.e. on a chemical factory, in order to highlight the critical aspects of this implementation. A case-study plant handling flammable liquids was selected. The application of the European Standard allowed to estimate the incidence of lightning activity on the total value of the default release frequency suggested by guidelines for atmospheric storage tanks. Though it has become evident that the European Standard does not introduce any parameters explicitly pointing out the amount of dangerous substances which could be ignited or released. Furthermore the parameters that are proposed to describe the characteristics of the structures potentially subjected to lightning strikes are insufficient to take into account the specific features of different chemical equipment commonly present in chemical plants.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The first goal of this study is to analyse a real-world multiproduct onshore pipeline system in order to verify its hydraulic configuration and operational feasibility by constructing a simulation model step by step from its elementary building blocks that permits to copy the operation of the real system as precisely as possible. The second goal is to develop this simulation model into a user-friendly tool that one could use to find an “optimal” or “best” product batch schedule for a one year time period. Such a batch schedule could change dynamically as perturbations occur during operation that influence the behaviour of the entire system. The result of the simulation, the ‘best’ batch schedule is the one that minimizes the operational costs in the system. The costs involved in the simulation are inventory costs, interface costs, pumping costs, and penalty costs assigned to any unforeseen situations. The key factor to determine the performance of the simulation model is the way time is represented. In our model an event based discrete time representation is selected as most appropriate for our purposes. This means that the time horizon is divided into intervals of unequal lengths based on events that change the state of the system. These events are the arrival/departure of the tanker ships, the openings and closures of loading/unloading valves of storage tanks at both terminals, and the arrivals/departures of trains/trucks at the Delivery Terminal. In the feasibility study we analyse the system’s operational performance with different Head Terminal storage capacity configurations. For these alternative configurations we evaluated the effect of different tanker ship delay magnitudes on the number of critical events and product interfaces generated, on the duration of pipeline stoppages, the satisfaction of the product demand and on the operative costs. Based on the results and the bottlenecks identified, we propose modifications in the original setup.