4 resultados para Hospitality and Administration and Management

em AMS Tesi di Laurea - Alm@DL - Università di Bologna


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The need to effectively manage the documentation covering the entire production process, from the concept phase right through to market realise, constitutes a key issue in the creation of a successful and highly competitive product. For almost forty years the most commonly used strategies to achieve this have followed Product Lifecycle Management (PLM) guidelines. Translated into information management systems at the end of the '90s, this methodology is now widely used by companies operating all over the world in many different sectors. PLM systems and editor programs are the two principal types of software applications used by companies for their process aotomation. Editor programs allow to store in documents the information related to the production chain, while the PLM system stores and shares this information so that it can be used within the company and made it available to partners. Different software tools, which capture and store documents and information automatically in the PLM system, have been developed in recent years. One of them is the ''DirectPLM'' application, which has been developed by the Italian company ''Focus PLM''. It is designed to ensure interoperability between many editors and the Aras Innovator PLM system. In this dissertation we present ''DirectPLM2'', a new version of the previous software application DirectPLM. It has been designed and developed as prototype during the internship by Focus PLM. Its new implementation separates the abstract logic of business from the real commands implementation, previously strongly dependent on Aras Innovator. Thanks to its new design, Focus PLM can easily develop different versions of DirectPLM2, each one devised for a specific PLM system. In fact, the company can focus the development effort only on a specific set of software components which provides specialized functions interacting with that particular PLM system. This allows shorter Time-To-Market and gives the company a significant competitive advantage.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

L’obiettivo della tesi è quello di fare una panoramica sulla strategia BIM e quindi sulla digitalizzazione del processo costruttivo. Grazie alla analisi di un caso di studio, altro obiettivo è quello di analizzare e valutare la metodologia BIM 4D/5D, ossia la gestione dei tempi e dei costi di realizzazione dell’opera. Nella prima fase si affronta il tema del BIM, con una analisi sull’evoluzione degli strumenti di elaborazione e rappresentazione digitale del progetto architettonico, su come questi strumenti si differenzino sia dal punto di vista operativo che concettuale rivoluzionando il flusso di lavoro odierno. Quindi, partendo da un’analisi che e ritrae l’estrema frammentazione del settore delle costruzioni, si va ad analizzare come il BIM aumenti e favorisca la collaborazione delle parti interessate, armonizzando l’intero processo costruttivo dell’opera. Si prosegue con l'esame della diffusione e del livello di maturità degli strumenti BIM, di come i privati e le amministrazioni pubbliche, a livello mondiale, stiano spingendo per favorire l’adozione della metodologia BIM. Inoltre si analizzano le dinamiche dell’interoperabilità, delle metodologie e protocolli di interscambio dati, che sono un elemento chiave per il successo del BIM per via dei numerosi strumenti, specializzati nelle varie discipline del settore edile. Nella terza parte, dedicata al Project Management di un caso di studio, si verifica la bontà delle metodologie teorizzate attraverso la realizzazione di un modello virtuale in Revit. Dal modello realizzato dal laureando sono estrapolate le informazioni necessarie alla gestione, e tramite il software STRVison CPM, si elaborano i principali documenti per la progettazione e gestione del cantiere: il CM, il CME, i tempi operativi, il cronoprogramma Gantt. Obbiettivo è constatare l’effettivo livello di maturità della strategia BIM 4D e 5D e la reale possibilità di un impiego capillare nel panorama italiano del settore delle costruzioni.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, a joint location-inventory model is proposed that simultaneously optimises strategic supply chain design decisions such as facility location and customer allocation to facilities, and tactical-operational inventory management and production scheduling decisions. All this is analysed in a context of demand uncertainty and supply uncertainty. While demand uncertainty stems from potential fluctuations in customer demands over time, supply-side uncertainty is associated with the risk of “disruption” to which facilities may be subject. The latter is caused by external factors such as natural disasters, strikes, changes of ownership and information technology security incidents. The proposed model is formulated as a non-linear mixed integer programming problem to minimise the expected total cost, which includes four basic cost items: the fixed cost of locating facilities at candidate sites, the cost of transport from facilities to customers, the cost of working inventory, and the cost of safety stock. Next, since the optimisation problem is very complex and the number of evaluable instances is very low, a "matheuristic" solution is presented. This approach has a twofold objective: on the one hand, it considers a larger number of facilities and customers within the network in order to reproduce a supply chain configuration that more closely reflects a real-world context; on the other hand, it serves to generate a starting solution and perform a series of iterations to try to improve it. Thanks to this algorithm, it was possible to obtain a solution characterised by a lower total system cost than that observed for the initial solution. The study concludes with some reflections and the description of possible future insights.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years, global supply chains have increasingly suffered from reliability issues due to various external and difficult to-manage events. The following paper aims to build an integrated approach for the design of a Supply Chain under the risk of disruption and demand fluctuation. The study is divided in two parts: a mathematical optimization model, to identify the optimal design and assignments customer-facility, and a discrete-events simulation of the resulting network. The first one describes a model in which plant location decisions are influenced by variables such as distance to customers, investments needed to open plants and centralization phenomena that help contain the risk of demand variability (Risk Pooling). The entire model has been built with a proactive approach to manage the risk of disruptions assigning to each customer two types of open facilities: one that will serve it under normal conditions and a back-up facility, which comes into operation when the main facility has failed. The study is conducted on a relatively small number of instances due to the computational complexity, a matheuristic approach can be found in part A of the paper to evaluate the problem with a larger set of players. Once the network is built, a discrete events Supply Chain simulation (SCS) has been implemented to analyze the stock flow within the facilities warehouses, the actual impact of disruptions and the role of the back-up facilities which suffer a great stress on their inventory due to a large increase in demand caused by the disruptions. Therefore, simulation follows a reactive approach, in which customers are redistributed among facilities according to the interruptions that may occur in the system and to the assignments deriving from the design model. Lastly, the most important results of the study will be reported, analyzing the role of lead time in a reactive approach for the occurrence of disruptions and comparing the two models in terms of costs.