2 resultados para Goddard Space Flight Center. Mission Operations and Data Systems Directorate.
em AMS Tesi di Laurea - Alm@DL - Università di Bologna
Resumo:
In this thesis work, a cosmic-ray telescope was set up in the INFN laboratories in Bologna using smaller size replicas of CMS Drift Tubes chambers, called MiniDTs, to test and develop new electronics for the CMS Phase-2 upgrade. The MiniDTs were assembled in INFN National Laboratory in Legnaro, Italy. Scintillator tiles complete the telescope, providing a signal independent of the MiniDTs for offline analysis. The telescope readout is a test system for the CMS Phase-2 upgrade data acquisition design. The readout is based on the early prototype of a radiation-hard FPGA-based board developed for the High Luminosity LHC CMS upgrade, called On Board electronics for Drift Tubes. Once the set-up was operational, we developed an online monitor to display in real-time the most important observables to check the quality of the data acquisition. We performed an offline analysis of the collected data using a custom version of CMS software tools, which allowed us to estimate the time pedestal and drift velocity in each chamber, evaluate the efficiency of the different DT cells, and measure the space and time resolution of the telescope system.
Resumo:
The study is divided into two main part: one focused on the GEO Satellite IoT and the other on the LEO Satellite IoT. Concerning the GEO Satellite IoT, the activity has been developed in the context of EUMETSAT Data Collection Service (DCS) by investigating the performance at the receiver within challenging scenarios. DCS are provided by several GEO Satellite operators, giving almost total coverage around the world. In this study firstly an overview of the DCS end-to-end architecture is given followed by a detailed description of both the tools used for the simulations: the DCP-TST (message generator and transmitter) and the DCP-RX (receiver). After generating several test messages, the performances have been evaluated with the addition of impairments (CW and sweeping interferences) and considerations in terms of BER and Good Messages are produced. Furthermore, a study on the PLL System is also conducted together with evaluations on the effectiveness of tuning the PLL Bw on the overall performance. Concerning the LEO Satellite IoT, the activity was carried out in the framework of the ASI Bidirectional IoT Satellite Service (BISS) Project. The elaborate covers a survey about the possible services that the project can accomplish and a technical analysis on the uplink MA. In particular, the LR-FHSS is proved to be a valid alternative for the uplink through an extensive analysis on its Network capacity and through the study of an analytic model for Success Probability with its Matlab implementation.