2 resultados para Electrical load forecasting
em AMS Tesi di Laurea - Alm@DL - Università di Bologna
Resumo:
This project points out a brief overview of several concepts, as Renewable Energy Resources, Distributed Energy Resources, Distributed Generation, and describes the general architecture of an electrical microgrid, isolated or connected to the Medium Voltage Network. Moreover, the project focuses on a project carried out by GRECDH Department in collaboration with CITCEA Department, both belonging to Universitat Politécnica de Catalunya: it concerns isolated microgrids employing renewable energy resources in two communities in northern Peru. Several solutions found using optimization software regarding different generation systems (wind and photovoltaic) and different energy demand scenarios are commented and analyzed from an electrical point of view. Furthermore, there are some proposals to improve microgrid performances, in particular to increase voltage values for each load connected to the microgrid. The extra costs required by the proposed solutions are calculated and their effect on the total microgrid cost are taken into account; finally there are some considerations about the impact the project has on population and on people's daily life.
Resumo:
This thesis deals with the sizing and analysis of the electrical power system of a petrochemical plant. The activity was carried out in the framework of an electrical engineering internship. The sizing and electrical calculations, as well as the study of the dynamic behavior of network quantities, are accomplished by using the ETAP (Electrical Transient Analyzer Program) software. After determining the type and size of the loads, the calculation of power flows is carried out for all possible network layout and different power supply configurations. The network is normally operated in a double radial configuration. However, the sizing must be carried out taking into account the most critical configuration, i.e., the temporary one of single radial operation, and also considering the most unfavorable power supply conditions. The calculation of shortcircuit currents is then carried out and the appropriate circuit breakers are selected. Where necessary, capacitor banks are sized in order to keep power factor at the point of common coupling within the preset limits. The grounding system is sized by using the finite element method. For loads with the highest level of criticality, UPS are sized in order to ensure their operation even in the absence of the main power supply. The main faults that can occur in the plant are examined, determining the intervention times of the protections to ensure that, in case of failure on one component, the others can still properly operate. The report concludes with the dynamic and stability analysis of the power system during island operation, in order to ensure that the two gas turbines are able to support the load even during transient conditions.