2 resultados para Electrical Development Company of Ontario, Limited.
em AMS Tesi di Laurea - Alm@DL - Università di Bologna
Resumo:
This thesis deals with the sizing and analysis of the electrical power system of a petrochemical plant. The activity was carried out in the framework of an electrical engineering internship. The sizing and electrical calculations, as well as the study of the dynamic behavior of network quantities, are accomplished by using the ETAP (Electrical Transient Analyzer Program) software. After determining the type and size of the loads, the calculation of power flows is carried out for all possible network layout and different power supply configurations. The network is normally operated in a double radial configuration. However, the sizing must be carried out taking into account the most critical configuration, i.e., the temporary one of single radial operation, and also considering the most unfavorable power supply conditions. The calculation of shortcircuit currents is then carried out and the appropriate circuit breakers are selected. Where necessary, capacitor banks are sized in order to keep power factor at the point of common coupling within the preset limits. The grounding system is sized by using the finite element method. For loads with the highest level of criticality, UPS are sized in order to ensure their operation even in the absence of the main power supply. The main faults that can occur in the plant are examined, determining the intervention times of the protections to ensure that, in case of failure on one component, the others can still properly operate. The report concludes with the dynamic and stability analysis of the power system during island operation, in order to ensure that the two gas turbines are able to support the load even during transient conditions.
Resumo:
This dissertation deals with the development of a project concerning a demonstration in the scope of the Supply Chain 6 of the Internet of Energy (IoE) project: the Remote Monitoring Emulator, which bears my personal contribution in several sections. IoE is a project of international relevance, that means to establish an interoperability standard as regards the electric power production and utilization infrastructure, using Smart Space platforms. The future perspectives of IoE have to do with a platform for electrical power trade-of, the Smart Grid, whose energy is produced by decentralized renewable sources and whose services are exploited primarily according to the Internet of Things philosophy. The main consumers of this kind of smart technology will be Smart Houses (that is to say, buildings controlled by an autonomous system for electrical energy management that is interoperable with the Smart Grid) and Electric Mobility, that is a smart and automated management regarding movement and, overall, recharging of electrical vehicles. It is precisely in the latter case study that the project Remote Monitoring Emulator takes place. It consists in the development of a simulated platform for the management of an electrical vehicle recharging in a city. My personal contribution to this project lies in development and modeling of the simulation platform, of its counterpart in a mobile application and implementation of a city service prototype. This platform shall, ultimately, make up a demonstrator system exploiting the same device which a real user, inside his vehicle, would use. The main requirements that this platform shall satisfy will be interoperability, expandability and relevance to standards, as it needs to communicate with other development groups and to effectively respond to internal changes that can affect IoE.