3 resultados para ACCELERATING FRONTS

em AMS Tesi di Laurea - Alm@DL - Università di Bologna


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Communication and coordination are two key-aspects in open distributed agent system, being both responsible for the system’s behaviour integrity. An infrastructure capable to handling these issues, like TuCSoN, should to be able to exploit modern technologies and tools provided by fast software engineering contexts. Thesis aims to demonstrate TuCSoN infrastructure’s abilities to cope new possibilities, hardware and software, offered by mobile technology. The scenarios are going to configure, are related to the distributed nature of multi-agent systems where an agent should be located and runned just on a mobile device. We deal new mobile technology frontiers concerned with smartphones using Android operating system by Google. Analysis and deployment of a distributed agent-based system so described go first to impact with quality and quantity considerations about available resources. Engineering issue at the base of our research is to use TuCSoN against to reduced memory and computing capability of a smartphone, without the loss of functionality, efficiency and integrity for the infrastructure. Thesis work is organized on two fronts simultaneously: the former is the rationalization process of the available hardware and software resources, the latter, totally orthogonal, is the adaptation and optimization process about TuCSoN architecture for an ad-hoc client side release.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Due to its practical importance and inherent complexity, the optimisation of distribution networks for supplying drinking water has been the subject of extensive study for the past 30 years. The optimization is governed by sizing the pipes in the water distribution network (WDN) and / or optimises specific parts of the network such as pumps, tanks etc. or try to analyse and optimise the reliability of a WDN. In this thesis, the author has analysed two different WDNs (Anytown City and Cabrera city networks), trying to solve and optimise a multi-objective optimisation problem (MOOP). The main two objectives in both cases were the minimisation of Energy Cost (€) or Energy consumption (kWh), along with the total Number of pump switches (TNps) during a day. For this purpose, a decision support system generator for Multi-objective optimisation used. Its name is GANetXL and has been developed by the Center of Water System in the University of Exeter. GANetXL, works by calling the EPANET hydraulic solver, each time a hydraulic analysis has been fulfilled. The main algorithm used, was a second-generation algorithm for multi-objective optimisation called NSGA_II that gave us the Pareto fronts of each configuration. The first experiment that has been carried out was the network of Anytown city. It is a big network with a pump station of four fixed speed parallel pumps that are boosting the water dynamics. The main intervention was to change these pumps to new Variable speed driven pumps (VSDPs), by installing inverters capable to diverse their velocity during the day. Hence, it’s been achieved great Energy and cost savings along with minimisation in the number of pump switches. The results of the research are thoroughly illustrated in chapter 7, with comments and a variety of graphs and different configurations. The second experiment was about the network of Cabrera city. The smaller WDN had a unique FS pump in the system. The problem was the same as far as the optimisation process was concerned, thus, the minimisation of the energy consumption and in parallel the minimisation of TNps. The same optimisation tool has been used (GANetXL).The main scope was to carry out several and different experiments regarding a vast variety of configurations, using different pump (but this time keeping the FS mode), different tank levels, different pipe diameters and different emitters coefficient. All these different modes came up with a large number of results that were compared in the chapter 8. Concluding, it should be said that the optimisation of WDNs is a very interested field that has a vast space of options to deal with. This includes a large number of algorithms to choose from, different techniques and configurations to be made and different support system generators. The researcher has to be ready to “roam” between these choices, till a satisfactory result will convince him/her that has reached a good optimisation point.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Joseph Nicolas Cugnot built the first primitive car in 1769 and approximately one hundred year later the first automotive race took place. Thanks to this, for the first time the aerodynamics principles began to be applied to cars. The aerodynamic study of a car is important to improve the performance on the road, or on the track. It purposely enhances the stability in the turns and increases the maximum velocity. However, it is also useful, decrease the fuel consumption, in order to reduce the pollution. Given that cars are a very complex body, the aerodynamic study cannot be conducted following an analytical method, but it is possible, in general, to choose between two different approaches: the numerical or the experimental one. The results of numerical studies depend on the computers’ potential and on the method use to implement the mathematical model. Today, the best way to perform an aerodynamic study is still experimental, which means that in the first phase of the design process the study is performed in a wind tunnel and in later phases directly on track. The automotive wind tunnels are singular mainly due to the test chamber, which typically contains a ground simulation system. The test chamber can have different types of walls: open walls, closed walls, adaptive walls or slotted walls. The best solution is to use the slotted walls because they minimize the interference between the walls and the streamlines, the interaction between the flow and the environment, and also to contain the overall costs. Furthermore, is necessary minimize the boundary layer at the walls, without accelerating the flow, in order to provide the maximum section of homogeneous flow. This thesis aims at redefining the divergent angle of the Dallara Automobili S.P.A. wind tunnel’s walls, in order to improve the overall homogeneity. To perform this study it was necessary to acquire the pressure data of the boundary layer, than it was created the profile of the boundary layer velocity and, to minimize the experimental errors, it was calculated the displacement thickness. The results obtained shows, even if the instrument used to the experiment was not the best one, that the boundary layer thickness could be minor in case of a low diffusion angle. So it is convenient to perform another experiment with a most sensitive instrument to verified what is the better wall configuration.