27 resultados para electric network design


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Photoplethysmography (PPG) sensors allow for noninvasive and comfortable heart-rate (HR) monitoring, suitable for compact wearable devices. However, PPG signals collected from such devices often suffer from corruption caused by motion artifacts. This is typically addressed by combining the PPG signal with acceleration measurements from an inertial sensor. Recently, different energy-efficient deep learning approaches for heart rate estimation have been proposed. To test these new solutions, in this work, we developed a highly wearable platform (42mm x 48 mm x 1.2mm) for PPG signal acquisition and processing, based on GAP9, a parallel ultra low power system-on-chip featuring nine cores RISC-V compute cluster with neural network accelerator and 1 core RISC-V controller. The hardware platform also integrates a commercial complete Optical Biosensing Module and an ARM-Cortex M4 microcontroller unit (MCU) with Bluetooth low-energy connectivity. To demonstrate the capabilities of the system, a deep learning-based approach for PPG-based HR estimation has been deployed. Thanks to the reduced power consumption of the digital computational platform, the total power budget is just 2.67 mW providing up to 5 days of operation (105 mAh battery).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Electric cars are increasingly popular due to a transition of mobility towards more sustainable forms. From an increasingly green and pollution reduction perspective, there are more and more incentives that encourage customers to invest in electric cars. Using the Industrial Design and Structure (IDeS) research method, this project has the aim to design a new electric compact SUV suitable for all people who live in the city, and for people who move outside urban areas. In order to achieve the goal of developing a new car in the industrial automotive environment, the compact SUV segment was chosen because it is a vehicle very requested by the costumers and it is successful in the market due to its versatility. IDeS is a combination of innovative and advanced systematic approaches used to set up a new industrial project. The IDeS methodology is sequentially composed of Quality Function Deployment (QFD), Benchmarking (BM), Top-Flop analysis (TFA), Stylistic Design Engineering (SDE), Design for X, Prototyping, Testing, Budgeting, and Planning. The work is based on a series of steps and the sequence of these must be meticulously scheduled, imposing deadlines along the work. Starting from an analysis of the market and competitors, the study of the best and worst existing parameters in the competitor’s market is done, arriving at the idea of a better product in terms of numbers and innovation. After identifying the characteristics that the new car should have, the other step is the styling part, with the definition of the style and the design of the machine on a 3D CAD. Finally, it switches to the prototyping and testing phase to see if the product is able to work. Ultimately, intending to place the car on the market, it is essential to estimate the necessary budget for a possible investment in this project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nowadays, there is a boom in the use of electrification. Electric vehicles are gaining interest worldwide due to various factors, including climate and environmental awareness. In this thesis, a step-down isolated power supply for electric tractors is investigated, specifically the phase-shifted full-bridge (PSFB) DC-DC with synchronous rectification and zero-voltage switching (ZVS). This converter was selected for its high-power capacity with high efficiency. A 3500 W PSFB converter with peak current control (PCCM) is designed and modeled in MATLAB. The input voltage range is from 550 V to 820 V and the output voltage range is limited to 9 V to 16 V with a maximum output current of 250 A. All components were commercially designed and selected, including magnetics for the high-frequency transformer and inductors, taking into account loss calculations. Zero voltage switching for the lagging leg is achieved at 13% to 100% load. The proven efficiency of the converter is around 90

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of the thesis project, developed within the Line Control & Software Engineering team of G.D company, is to analyze and identify the appropriate tool to automate the HW configuration process using Beckhoff technologies by importing data from an ECAD tool. This would save a great deal of time, since the I/O topology created as part of the electrical planning is presently imported manually in the related SW project of the machine. Moreover, a manual import is more error-prone because of human mistake than an automatic configuration tool. First, an introduction about TwinCAT 3, EtherCAT and Automation Interface is provided; then, it is analyzed the official Beckhoff tool, XCAD Interface, and the requirements on the electrical planning to use it: the interface is realized by means of the AutomationML format. Finally, due to some limitations observed, the design and implementation of a company internal tool is performed. Tests and validation of the tool are performed on a sample production line of the company.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Neural Networks customized and tested in this thesis (WaldoNet, FlowNet and PatchNet) are a first exploration and approach to the Template Matching task. The possibilities of extension are therefore many and some are proposed below. During my thesis, I have analyzed the functioning of the classical algorithms and adapted with deep learning algorithms. The features extracted from both the template and the query images resemble the keypoints of the SIFT algorithm. Then, instead of similarity function or keypoints matching, WaldoNet and PatchNet use the convolutional layer to compare the features, while FlowNet uses the correlational layer. In addition, I have identified the major challenges of the Template Matching task (affine/non-affine transformations, intensity changes...) and solved them with a careful design of the dataset.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this thesis the design of a pressure regulation system for space propulsion engines (electric and cold gas) has been performed. The Bang-Bang Control (BBC) method has been implemented through the open/close command on a solenoid valve, and the mass flow rate of the propellant has been fixed with suitable flow restrictors. At the beginning, research for the comparison between mechanical and electronic (for BBC) pressure regulators has been performed, which resulted in enough advantages for the selection of the second valve type. The major advantage is about the possibility to have a variable outlet pressure with a variable inlet pressure through a simple remote command, while in mechanical pressure regulators the ratio between inlet and outlet pressures must be mechanically settled. Different pressure control schemes have been analyzed, changing number of solenoid valves, flow restrictors and plenums. For each scheme the valve’s frequencies were evaluated with simplified mathematical models and with the use of simulators implemented on Python; the results obtained from those two methods matched quiet well. From all the schemes it was possible to observe varying frequency and duty cycle, for changes in different parameters. This results, after experimental checks, can be used to design the control system for a given total number of cycles that a specific solenoid valve can guarantee. Finally, tests were performed and it was possible to verify the goodness of the control system. Moreover from the tests it was possible to deduce some tips in order to optimize the running of the simulator.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Wireless power transfer is becoming a crucial and demanding task in the IoT world. Despite the already known solutions exploiting a near-field powering approach, far-field WPT is definitely more challenging, and commercial applications are not available yet. This thesis proposes the recent frequency-diverse array technology as a potential candidate for realizing smart and reconfigurable far-field WPT solutions. In the first section of this work, an analysis on some FDA systems is performed, identifying the planar array with circular geometry as the most promising layout in terms of radiation properties. Then, a novel energy aware solution to handle the critical time variability of the FDA beam pattern is proposed. It consists on a time-control strategy through a triangular pulse, and it allows to achieve ad-hoc and real time WPT. Moreover, an essential frequency domain analysis of the radiating behaviour of a pulsed FDA system is presented. This study highlights the benefits of exploiting the intrinsic pulse harmonics for powering purposes, thus minimising the power loss. Later, the electromagnetic design of a radial FDA architecture is addressed. In this context, an exhaustive investigation on miniaturization techniques is carried out; the use of multiple shorting pins together with a meandered feeding network has been selected as a powerful solution to halve the original prototype dimension. Finally, accurate simulations of the designed radial FDA system are performed, and the obtained results are given.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the major issues for power converters that are connected to the electric grid are the measurement of three phase Conduced Emissions (CE), which are regulated by international and regional standards. CE are composed of two components which are Common Mode (CM) noise and Differential Mode (DM) noise. To achieve compliance with these regulations the Equipment Under Test (EUT) includes filtering and other electromagnetic emission control strategies. The separation of differential mode and common mode noise in Electromagnetic Interference (EMI) analysis is a well-known procedure which is useful especially for the optimization of the EMI filter, to improve the CM or DM attenuation depending on which component of the conducted emissions is predominant, and for the analysis and the understanding of interference phenomena of switched mode power converters. However, separating both components is rarely done during measurements. Therefore, in this thesis an active device for the separation of the CM and DM EMI noise in three phase power electronic systems has been designed and experimentally analysed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, a joint location-inventory model is proposed that simultaneously optimises strategic supply chain design decisions such as facility location and customer allocation to facilities, and tactical-operational inventory management and production scheduling decisions. All this is analysed in a context of demand uncertainty and supply uncertainty. While demand uncertainty stems from potential fluctuations in customer demands over time, supply-side uncertainty is associated with the risk of “disruption” to which facilities may be subject. The latter is caused by external factors such as natural disasters, strikes, changes of ownership and information technology security incidents. The proposed model is formulated as a non-linear mixed integer programming problem to minimise the expected total cost, which includes four basic cost items: the fixed cost of locating facilities at candidate sites, the cost of transport from facilities to customers, the cost of working inventory, and the cost of safety stock. Next, since the optimisation problem is very complex and the number of evaluable instances is very low, a "matheuristic" solution is presented. This approach has a twofold objective: on the one hand, it considers a larger number of facilities and customers within the network in order to reproduce a supply chain configuration that more closely reflects a real-world context; on the other hand, it serves to generate a starting solution and perform a series of iterations to try to improve it. Thanks to this algorithm, it was possible to obtain a solution characterised by a lower total system cost than that observed for the initial solution. The study concludes with some reflections and the description of possible future insights.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Electric vehicles and electronic components inside the vehicle are becoming increasingly important. The software as well starts to have a significant impact on modern high-end cars therefore a careful validation process needs to be implemented with the aim of having a bug free product when it is released. The software complexity increases and thus also the testing phases is more demanding. Test can be troublesome and, in some cases, boring and easy. The intelligence can be moved in test definition and writing rather than on test execution. The aim of this document is to start the definition of an automatic modular testing system capable to execute test cycles on systems that interacts with the CAN networks and with DUT that can be touched with a robotic arm. The document defines a first version of the system, in particular the hardware interface part with the aim of taking logs and execute test in an automated fashion with the test engineer can have a higher focus on the test definition and analysis rather than execution.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In recent years, global supply chains have increasingly suffered from reliability issues due to various external and difficult to-manage events. The following paper aims to build an integrated approach for the design of a Supply Chain under the risk of disruption and demand fluctuation. The study is divided in two parts: a mathematical optimization model, to identify the optimal design and assignments customer-facility, and a discrete-events simulation of the resulting network. The first one describes a model in which plant location decisions are influenced by variables such as distance to customers, investments needed to open plants and centralization phenomena that help contain the risk of demand variability (Risk Pooling). The entire model has been built with a proactive approach to manage the risk of disruptions assigning to each customer two types of open facilities: one that will serve it under normal conditions and a back-up facility, which comes into operation when the main facility has failed. The study is conducted on a relatively small number of instances due to the computational complexity, a matheuristic approach can be found in part A of the paper to evaluate the problem with a larger set of players. Once the network is built, a discrete events Supply Chain simulation (SCS) has been implemented to analyze the stock flow within the facilities warehouses, the actual impact of disruptions and the role of the back-up facilities which suffer a great stress on their inventory due to a large increase in demand caused by the disruptions. Therefore, simulation follows a reactive approach, in which customers are redistributed among facilities according to the interruptions that may occur in the system and to the assignments deriving from the design model. Lastly, the most important results of the study will be reported, analyzing the role of lead time in a reactive approach for the occurrence of disruptions and comparing the two models in terms of costs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis deals with the sizing and analysis of the electrical power system of a petrochemical plant. The activity was carried out in the framework of an electrical engineering internship. The sizing and electrical calculations, as well as the study of the dynamic behavior of network quantities, are accomplished by using the ETAP (Electrical Transient Analyzer Program) software. After determining the type and size of the loads, the calculation of power flows is carried out for all possible network layout and different power supply configurations. The network is normally operated in a double radial configuration. However, the sizing must be carried out taking into account the most critical configuration, i.e., the temporary one of single radial operation, and also considering the most unfavorable power supply conditions. The calculation of shortcircuit currents is then carried out and the appropriate circuit breakers are selected. Where necessary, capacitor banks are sized in order to keep power factor at the point of common coupling within the preset limits. The grounding system is sized by using the finite element method. For loads with the highest level of criticality, UPS are sized in order to ensure their operation even in the absence of the main power supply. The main faults that can occur in the plant are examined, determining the intervention times of the protections to ensure that, in case of failure on one component, the others can still properly operate. The report concludes with the dynamic and stability analysis of the power system during island operation, in order to ensure that the two gas turbines are able to support the load even during transient conditions.