3 resultados para Operational management
em AMS Tesi di Dottorato - Alm@DL - Università di Bologna
Resumo:
Asset Management (AM) is a set of procedures operable at the strategic-tacticaloperational level, for the management of the physical asset’s performance, associated risks and costs within its whole life-cycle. AM combines the engineering, managerial and informatics points of view. In addition to internal drivers, AM is driven by the demands of customers (social pull) and regulators (environmental mandates and economic considerations). AM can follow either a top-down or a bottom-up approach. Considering rehabilitation planning at the bottom-up level, the main issue would be to rehabilitate the right pipe at the right time with the right technique. Finding the right pipe may be possible and practicable, but determining the timeliness of the rehabilitation and the choice of the techniques adopted to rehabilitate is a bit abstruse. It is a truism that rehabilitating an asset too early is unwise, just as doing it late may have entailed extra expenses en route, in addition to the cost of the exercise of rehabilitation per se. One is confronted with a typical ‘Hamlet-isque dilemma’ – ‘to repair or not to repair’; or put in another way, ‘to replace or not to replace’. The decision in this case is governed by three factors, not necessarily interrelated – quality of customer service, costs and budget in the life cycle of the asset in question. The goal of replacement planning is to find the juncture in the asset’s life cycle where the cost of replacement is balanced by the rising maintenance costs and the declining level of service. System maintenance aims at improving performance and maintaining the asset in good working condition for as long as possible. Effective planning is used to target maintenance activities to meet these goals and minimize costly exigencies. The main objective of this dissertation is to develop a process-model for asset replacement planning. The aim of the model is to determine the optimal pipe replacement year by comparing, temporally, the annual operating and maintenance costs of the existing asset and the annuity of the investment in a new equivalent pipe, at the best market price. It is proposed that risk cost provide an appropriate framework to decide the balance between investment for replacing or operational expenditures for maintaining an asset. The model describes a practical approach to estimate when an asset should be replaced. A comprehensive list of criteria to be considered is outlined, the main criteria being a visà- vis between maintenance and replacement expenditures. The costs to maintain the assets should be described by a cost function related to the asset type, the risks to the safety of people and property owing to declining condition of asset, and the predicted frequency of failures. The cost functions reflect the condition of the existing asset at the time the decision to maintain or replace is taken: age, level of deterioration, risk of failure. The process model is applied in the wastewater network of Oslo, the capital city of Norway, and uses available real-world information to forecast life-cycle costs of maintenance and rehabilitation strategies and support infrastructure management decisions. The case study provides an insight into the various definitions of ‘asset lifetime’ – service life, economic life and physical life. The results recommend that one common value for lifetime should not be applied to the all the pipelines in the stock for investment planning in the long-term period; rather it would be wiser to define different values for different cohorts of pipelines to reduce the uncertainties associated with generalisations for simplification. It is envisaged that more criteria the municipality is able to include, to estimate maintenance costs for the existing assets, the more precise will the estimation of the expected service life be. The ability to include social costs enables to compute the asset life, not only based on its physical characterisation, but also on the sensitivity of network areas to social impact of failures. The type of economic analysis is very sensitive to model parameters that are difficult to determine accurately. The main value of this approach is the effort to demonstrate that it is possible to include, in decision-making, factors as the cost of the risk associated with a decline in level of performance, the level of this deterioration and the asset’s depreciation rate, without looking at age as the sole criterion for making decisions regarding replacements.
Resumo:
The general objective of this research is to explore theories and methodologies of sustainability indicators, environmental management and decision making disciplines with the operational purpose of producing scientific, robust and relevant information for supporting system understanding and decision making in real case studies. Several tools have been applied in order to increase the understanding of socio-ecological systems as well as providing relevant information on the choice between alternatives. These tools have always been applied having in mind the complexity of the issues and the uncertainty tied to the partial knowledge of the systems under study. Two case studies with specific application to performances measurement (environmental performances in the case of the K8 approach and sustainable development performances in the case of the EU Sustainable Development Strategy) and a case study about the selection of sustainable development indicators amongst Municipalities in Scotland, are discussed in the first part of the work. In the second part of the work, the common denominator among subjects consists in the application of spatial indices and indicators to address operational problems in land use management within the territory of the Ravenna province (Italy). The main conclusion of the thesis is that a ‘perfect’ methodological approach which always produces the best results in assessing sustainability performances does not exist. Rather, there is a pool of correct approaches answering different evaluation questions, to be used when methodologies fit the purpose of the analysis. For this reason, methodological limits and conceptual assumptions as well as consistency and transparency of the assessment, become the key factors for assessing the quality of the analysis.
Resumo:
This thesis collects the outcomes of a Ph.D. course in Telecommunications Engineering and it is focused on the study and design of possible techniques able to counteract interference signal in Global Navigation Satellite System (GNSS) systems. The subject is the jamming threat in navigation systems, that has become a very increasingly important topic in recent years, due to the wide diffusion of GNSS-based civil applications. Detection and mitigation techniques are developed in order to fight out jamming signals, tested in different scenarios and including sophisticated signals. The thesis is organized in two main parts, which deal with management of GNSS intentional counterfeit signals. The first part deals with the interference management, focusing on the intentional interfering signal. In particular, a technique for the detection and localization of the interfering signal level in the GNSS bands in frequency domain has been proposed. In addition, an effective mitigation technique which exploits the periodic characteristics of the common jamming signals reducing interfering effects at the receiver side has been introduced. Moreover, this technique has been also tested in a different and more complicated scenario resulting still effective in mitigation and cancellation of the interfering signal, without high complexity. The second part still deals with the problem of interference management, but regarding with more sophisticated signal. The attention is focused on the detection of spoofing signal, which is the most complex among the jamming signal types. Due to this highly difficulty in detect and mitigate this kind of signal, spoofing threat is considered the most dangerous. In this work, a possible techniques able to detect this sophisticated signal has been proposed, observing and exploiting jointly the outputs of several operational block measurements of the GNSS receiver operating chain.