2 resultados para 847

em AMS Tesi di Dottorato - Alm@DL - Università di Bologna


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Motivation An actual issue of great interest, both under a theoretical and an applicative perspective, is the analysis of biological sequences for disclosing the information that they encode. The development of new technologies for genome sequencing in the last years, opened new fundamental problems since huge amounts of biological data still deserve an interpretation. Indeed, the sequencing is only the first step of the genome annotation process that consists in the assignment of biological information to each sequence. Hence given the large amount of available data, in silico methods became useful and necessary in order to extract relevant information from sequences. The availability of data from Genome Projects gave rise to new strategies for tackling the basic problems of computational biology such as the determination of the tridimensional structures of proteins, their biological function and their reciprocal interactions. Results The aim of this work has been the implementation of predictive methods that allow the extraction of information on the properties of genomes and proteins starting from the nucleotide and aminoacidic sequences, by taking advantage of the information provided by the comparison of the genome sequences from different species. In the first part of the work a comprehensive large scale genome comparison of 599 organisms is described. 2,6 million of sequences coming from 551 prokaryotic and 48 eukaryotic genomes were aligned and clustered on the basis of their sequence identity. This procedure led to the identification of classes of proteins that are peculiar to the different groups of organisms. Moreover the adopted similarity threshold produced clusters that are homogeneous on the structural point of view and that can be used for structural annotation of uncharacterized sequences. The second part of the work focuses on the characterization of thermostable proteins and on the development of tools able to predict the thermostability of a protein starting from its sequence. By means of Principal Component Analysis the codon composition of a non redundant database comprising 116 prokaryotic genomes has been analyzed and it has been showed that a cross genomic approach can allow the extraction of common determinants of thermostability at the genome level, leading to an overall accuracy in discriminating thermophilic coding sequences equal to 95%. This result outperform those obtained in previous studies. Moreover, we investigated the effect of multiple mutations on protein thermostability. This issue is of great importance in the field of protein engineering, since thermostable proteins are generally more suitable than their mesostable counterparts in technological applications. A Support Vector Machine based method has been trained to predict if a set of mutations can enhance the thermostability of a given protein sequence. The developed predictor achieves 88% accuracy.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Asset Management (AM) is a set of procedures operable at the strategic-tacticaloperational level, for the management of the physical asset’s performance, associated risks and costs within its whole life-cycle. AM combines the engineering, managerial and informatics points of view. In addition to internal drivers, AM is driven by the demands of customers (social pull) and regulators (environmental mandates and economic considerations). AM can follow either a top-down or a bottom-up approach. Considering rehabilitation planning at the bottom-up level, the main issue would be to rehabilitate the right pipe at the right time with the right technique. Finding the right pipe may be possible and practicable, but determining the timeliness of the rehabilitation and the choice of the techniques adopted to rehabilitate is a bit abstruse. It is a truism that rehabilitating an asset too early is unwise, just as doing it late may have entailed extra expenses en route, in addition to the cost of the exercise of rehabilitation per se. One is confronted with a typical ‘Hamlet-isque dilemma’ – ‘to repair or not to repair’; or put in another way, ‘to replace or not to replace’. The decision in this case is governed by three factors, not necessarily interrelated – quality of customer service, costs and budget in the life cycle of the asset in question. The goal of replacement planning is to find the juncture in the asset’s life cycle where the cost of replacement is balanced by the rising maintenance costs and the declining level of service. System maintenance aims at improving performance and maintaining the asset in good working condition for as long as possible. Effective planning is used to target maintenance activities to meet these goals and minimize costly exigencies. The main objective of this dissertation is to develop a process-model for asset replacement planning. The aim of the model is to determine the optimal pipe replacement year by comparing, temporally, the annual operating and maintenance costs of the existing asset and the annuity of the investment in a new equivalent pipe, at the best market price. It is proposed that risk cost provide an appropriate framework to decide the balance between investment for replacing or operational expenditures for maintaining an asset. The model describes a practical approach to estimate when an asset should be replaced. A comprehensive list of criteria to be considered is outlined, the main criteria being a visà- vis between maintenance and replacement expenditures. The costs to maintain the assets should be described by a cost function related to the asset type, the risks to the safety of people and property owing to declining condition of asset, and the predicted frequency of failures. The cost functions reflect the condition of the existing asset at the time the decision to maintain or replace is taken: age, level of deterioration, risk of failure. The process model is applied in the wastewater network of Oslo, the capital city of Norway, and uses available real-world information to forecast life-cycle costs of maintenance and rehabilitation strategies and support infrastructure management decisions. The case study provides an insight into the various definitions of ‘asset lifetime’ – service life, economic life and physical life. The results recommend that one common value for lifetime should not be applied to the all the pipelines in the stock for investment planning in the long-term period; rather it would be wiser to define different values for different cohorts of pipelines to reduce the uncertainties associated with generalisations for simplification. It is envisaged that more criteria the municipality is able to include, to estimate maintenance costs for the existing assets, the more precise will the estimation of the expected service life be. The ability to include social costs enables to compute the asset life, not only based on its physical characterisation, but also on the sensitivity of network areas to social impact of failures. The type of economic analysis is very sensitive to model parameters that are difficult to determine accurately. The main value of this approach is the effort to demonstrate that it is possible to include, in decision-making, factors as the cost of the risk associated with a decline in level of performance, the level of this deterioration and the asset’s depreciation rate, without looking at age as the sole criterion for making decisions regarding replacements.