2 resultados para 4-31
em AMS Tesi di Dottorato - Alm@DL - Università di Bologna
Resumo:
Background: Nucleoside 5-Azacitidine (5-Aza) in high risk MDS patients (pts) at a dose of 75mg/mq/day subcutaneously for 7 days, every 28 days, induces high hematologic response rates (hematologic improvement (HI) 50-60%, complete remission (CR) 10-30%) and prolongation of survival (at 2 years 50,8%). Aim: The role of 5-Aza in low-risk MDS patients is not well defined but its use in the earlier phases of disease could be more effective and useful to control the expansion of MDS clone and disease progression. In our phase II, prospective, multicentric trial a low-dose schedule of 5-Aza (75 mg/mq daily for 5 consecutive days every 28 days) was given to low-risk MDS pts in order to evaluate its efficacy and tolerability and to identify biological markers to predict the response. Methods: From September 2008 to February 2010, 34 patients were enrolled into the study. Fifteen patients had refractory anemia (RA), 5 patients refractory anemia with ringed sideroblasts (RARS), 7 patients refractory cytopenia with multilineage dysplasia (RCMD) and 7 patients refractory anemia with excess blasts-1 (RAEB-1). All patients failed previously EPO therapy and were in chronic red blood cell (RBC) supportive care with a median transfusions requirement of 4 units/monthly. The response treatment criteria was according to IWG 2006. Results: At present time 31 out of 34 pts are evaluable: 12/31 pts (39%) completed the treatment plan (8 courses), 7/31 pts (22%) performed the first 4 courses, 8/31 (26%) made 1 to 3 courses and 4/31 (13%) died during the treatment period. Out of 12 pts who completed the 8 courses of therapy 10 (83%) obtained an HI, 2/12 (17%) maintained a stable disease. Out of 10 pts who obtained HI, 4 pts (40%) achieved a CR. Generally the drug was very well tolerated. The most commonly reported hematologic toxicities were neutropenia (55%) and thrombocytopenia (19%) but they were transitory and usually no delay of treatment was necessary. 2/4 pts died early after the 1th cycle for septic shock and gastrointestinal hemorrage respectively whereas 2/4 pts died in a condition of stable disease after the 4th cycle for pneumonia and respiratory distress. Samples for biologic studies have been collected from the pts before starting the therapy and at the end of 4th and 8th course. Preliminary data on the lipid signalling pathways suggested a direct correlation between PI-PLC-β1 gene expression and 5-Aza responsiveness. Conclusion: Interim analysis of our study based on the small number of cases who completed the treatment program, shows that 83% of pts obtain an HI and 40% obtain a CR. 4 patients died during the treatment and even if the causes were reported as no related to the therapy it has been considered that caution has to be reserved in given 5-Aza in these pts who are elderly and frail. Preliminary data of PI-PLC-β1 gene expression suggest that this and probably other biological markers could help us to know a priori who are the patients who have more chances to respond.
Resumo:
La tematica del presente scritto è l’analisi teorico-sperimentale del sistema edificio-impianto, che è funzione delle soluzioni progettuali adottate, dei componenti scelti e del tipo di conduzione prevista. La Direttiva 2010/31/CE sulle prestazioni energetiche degli edifici, entrata in vigore l’8 luglio 2010, pubblicata sulla Gazzetta Europea del 18 giugno 2010, sostituirà, dal 1º febbraio 2012, la direttiva 2002/91/CE. La direttiva prevede che vengano redatti piani nazionali destinati ad aumentare il numero di “edifici a energia quasi zero” e che entro il 31 dicembre 2020 tutti gli edifici di nuova costruzione dovranno essere “edifici a energia quasi zero”, per gli edifici pubblici questa scadenza è anticipata al 31 dicembre 2018. In questa prospettiva sono stati progettati due “edifici a energia quasi zero”, una villa monofamiliare e un complesso scolastico (scuola dell’infanzia, elementare, media inferiore) attualmente in via di realizzazione, con l’obiettivo principale di fornire un caso studio unico per ogni tipologia in quanto anche modulare e replicabile nella realtà del nostro territorio, che anticipano gli obiettivi fissati dalla Direttiva 2010/31/CE. I risultati ottenibili dai suddetti progetti, esposti nella tesi, sono il frutto di un attenta e proficua progettazione integrata, connubio tra progettazione architettonica ed energetico/impiantistica. La stessa progettazione ha esaminato le tecnologie, i materiali e le soluzioni tecniche “mirate” ai fini del comfort ambientale e di un’elevata prestazione energetica dell’edificio. Inoltre è stato dedicato ampio rilievo alla diagnosi energetica degli edifici esistenti attraverso 4 casi studio, i principali svolti durante i tre anni di dottorato di ricerca, esemplari del patrimonio edilizio italiano. Per ogni caso studio è stata condotta una diagnosi energetica dell’edificio, valutati i risultati e definita la classe energetica, ed in seguito sono stati presi in considerazione i possibili interventi migliorativi sia da un punto di vista qualitativo sia economico tenendo conto degli incentivi statali per l’incremento dell’efficienza energetica.