32 resultados para multi-system


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this thesis is to present exact and heuristic algorithms for the integrated planning of multi-energy systems. The idea is to disaggregate the energy system, starting first with its core the Central Energy System, and then to proceed towards the Decentral part. Therefore, a mathematical model for the generation expansion operations to optimize the performance of a Central Energy System system is first proposed. To ensure that the proposed generation operations are compatible with the network, some extensions of the existing network are considered as well. All these decisions are evaluated both from an economic viewpoint and from an environmental perspective, as specific constraints related to greenhouse gases emissions are imposed in the formulation. Then, the thesis presents an optimization model for solar organic Rankine cycle in the context of transactive energy trading. In this study, the impact that this technology can have on the peer-to-peer trading application in renewable based community microgrids is inspected. Here the consumer becomes a prosumer and engages actively in virtual trading with other prosumers at the distribution system level. Moreover, there is an investigation of how different technological parameters of the solar Organic Rankine Cycle may affect the final solution. Finally, the thesis introduces a tactical optimization model for the maintenance operations’ scheduling phase of a Combined Heat and Power plant. Specifically, two types of cleaning operations are considered, i.e., online cleaning and offline cleaning. Furthermore, a piecewise linear representation of the electric efficiency variation curve is included. Given the challenge of solving the tactical management model, a heuristic algorithm is proposed. The heuristic works by solving the daily operational production scheduling problem, based on the final consumer’s demand and on the electricity prices. The aggregate information from the operational problem is used to derive maintenance decisions at a tactical level.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The enhanced production of strange hadrons in heavy-ion collisions relative to that in minimum-bias pp collisions is historically considered one of the first signatures of the formation of a deconfined quark-gluon plasma. At the LHC, the ALICE experiment observed that the ratio of strange to non-strange hadron yields increases with the charged-particle multiplicity at midrapidity, starting from pp collisions and evolving smoothly across interaction systems and energies, ultimately reaching Pb-Pb collisions. The understanding of the origin of this effect in small systems remains an open question. This thesis presents a comprehensive study of the production of $K^{0}_{S}$, $\Lambda$ ($\bar{\Lambda}$) and $\Xi^{-}$ ($\bar{\Xi}^{+}$) strange hadrons in pp collisions at $\sqrt{s}$ = 13 TeV collected in LHC Run 2 with ALICE. A novel approach is exploited, introducing, for the first time, the concept of effective energy in the study of strangeness production in hadronic collisions at the LHC. In this work, the ALICE Zero Degree Calorimeters are used to measure the energy carried by forward emitted baryons in pp collisions, which reduces the effective energy available for particle production with respect to the nominal centre-of-mass energy. The results presented in this thesis provide new insights into the interplay, for strangeness production, between the initial stages of the collision and the produced final hadronic state. Finally, the first Run 3 results on the production of $\Omega^{\pm}$ ($\bar{\Omega}^{+}$) multi-strange baryons are presented, measured in pp collisions at $\sqrt{s}$ = 13.6 TeV and 900 GeV, the highest and lowest collision energies reached so far at the LHC. This thesis also presents the development and validation of the ALICE Time-Of-Flight (TOF) data quality monitoring system for LHC Run 3. This work was fundamental to assess the performance of the TOF detector during the commissioning phase, in the Long Shutdown 2, and during the data taking period.