52 resultados para supply lead time

em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Facing the competitive current market, increases the growing managerial commitment to minimize the frequent occurrence of service failures that characterized the past. Given the fact that the supply of a product in the correct location and on time, undamaged and correctly billed market requirement becomes framed the present work. Based on a case study, supported in parallel bibliographical references in the literature in a company of sugar and alcohol sector, the survey aims to measure and evaluate the real-time delivery from suppliers in order to ensure the best level of service to the company in question by suppliers, by reducing idle time of delivery, since the control system does not supply the pre-established and / or observed above, thus obtaining a better management and supply of replacement material. To assist the work, developed a project in the company in question in order to analyze and identify applications of concepts of lead time along the supply chain through an exploratory study in order to provide a beneficial outcome to the company through monitoring and performance of its suppliers, which will enable an aid to future decision-making

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The constant search for improvement and survival of the companies makes essential the utilization of cost reduction strategies and resources optimization. This study had as its objective the utilization of Lean Manufacturing tools for the repair process lead time reduction, in a car audio manufacturer. Performing an action research, the major problems were studied, such as the potential causes and the possible improvement activities, using the DMAIC methodology. An action plan was developed for all involved processes and, as a result, the objective was reached by making a direct impact on the customers’ satisfaction and adding a competitive differential for the company

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEG

Relevância:

80.00% 80.00%

Publicador:

Resumo:

O método para rápido aumento da produtividade fabril, aplicável principalmente à indústria brasileira de manufatura (17% do PIB), fundamenta-se exclusivamente na redução ou eliminação do tempo inativo do homem, da máquina e do material, que é a grande causa da ineficiência. O método exige a utilização de apenas cinco das mais simples, elementares e conhecidas técnicas e é aplicável às vinte situações mais freqüentes (objetos de estudo) na indústria de manufatura. Nossa experiência atesta que o método pode proporcionar à produtividade fabril um aumento superior a 30%, em poucos meses e de forma perene. Sua aplicação e a implantação das medidas dele decorrentes são feitas com extrema facilidade e, por isto, os resultados surgem muito rapidamente. Atinge portanto seu objetivo: proporcionar aumento da produtividade fabril em curto espaço de tempo. Este artigo (terceiro e último da série) detalhará doze objetos de estudo (situações): 1. redução dos tempos inativos causados por troca de turno, por refeição e por troca de produtos; 2. redução dos tempos improdutivos acarretados por causas mais importantes, por espera pelo serviço de manutenção, por espera pelo serviço de preparação, por espera pelo operador e por causas não apontáveis pelos procedimentos usuais; 3. redução das atividades improdutivas e das produtivas executadas num ritmo improdutivo; e 4. redução do tempo de espera do material em processamento pela redução do tamanho do lote de fabricação e pelo aumento da velocidade de manufatura.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Este trabalho apresenta um modelo de otimização-simulação aplicado em um estudo de caso real no setor de cilindros para laminação de uma siderúrgica, buscando melhorar o gerenciamento da área/equipamento gargalo da linha de produção. A simulação atuou em conjunto com um modelo de otimização da programação linear inteira (PLI) para melhorar o atendimento de prazo junto aos clientes em uma produção não seriada. Como resultado deste procedimento combinado da PLI e simulação, o processo produtivo foi otimizado e as filas de espera e o lead-time foram reduzidos, melhorando o atendimento aos clientes.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Geociências e Meio Ambiente - IGCE

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This work evaluates the implementation of Lean Six Sigma into the Steam Turbine’s Blades Manufacturing Process, aiming to improve productivity, quality and operational efficiency. Therefore, several tools have been applied, such as VSM, Spaghetti Diagram, Ishikawa, Pareto, DMAIC, Benchmarking and Control Charts, seeking to propose process improvements, as well as Quality Indicators creation. It was obtained a significant waste reduction throughout the process, achieving a lead time reduction of 42% and 83,41% in transport. Also, were introduced the Lean Thinking concepts, such as pull production and Continuous material flow. At the same time, it was possible to calculate the process capability and the sigma level, evaluating and proposing some improvements

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Due to globalization, is increasingly common for companies to make their products more competitive. With this background, the industries seek more efficient ways to produce. This paper aims to examine the tools of Lean Manufacturing applied in an industry luminaries ,addressing the positive aspects. Were applied tools like value stream mapping, Kanban, setup reduction and 5S program. With the application of these tools obtained improvements in processes, reducing lead time from factory and reducing the cost of the luminaries

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In today's competitive environment of automakers, it is essential to obtain the highest efficiency of the production process. This paper presents a study in a pre-assembly of brake pipes and fuel of a vehicle where the value stream maps and information (VSM – Value Stream Mapping) were designed in order to improve the process by reducing the Lead Time Production of a product, reducing waste and decrease time between processes. This work can be divided into three stages, the first building the VSM of the initial state, the second VSM of the proposed state and finally the VSM than was actually performed and to present the gains were achieved effectively. The proposed VSM would lead to a gain of 54% in lead time and 61% in processing time, since the VSM implemented had gains of 47% in lead time and 48% in processing time even without major investments as originally proposed. Concluding that even without big investment, using the techniques of lean manufacturing is possible to achieve high levels of process efficiency

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The effects of exposure to lead on endocrine function and the reproductive parameters were studied in pubertal rats treated with 1.0 g l(-1) lead acetate in drinking water for 20 days (subacute group) or 9 months (chronic group) in addition to i.v. injections of lead acetate (0.1 mg 100 g(-1) body wt.) every 10 (subacute group) or 15 days (chronic group). Although basal levels of testosterone were higher both in plasma and in testes of acutely intoxicated animals, the circulating levels of luteinizing hormone (LH) were not affected in either group, nor was the LH-releasing hormone content of the median eminence. The density of [I-125]LH/human chorionic gonadotrophin (hCG) binding sites in testicular homogenates was reduced by saturnism in both groups, concomitant with a significantly increased apparent affinity constant of the hormone-receptor complex. These data can be viewed as the result of a mixture of specific lead toxicity (e.g. at the enzyme level) with other more general actions (e.g. at the level of the hypothalamus-pituitary-testicular axis).

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper, a mathematical model is derived via Lagrange's Equation for a shear building structure that acts as a foundation of a non-ideal direct current electric motor, controlled by a mass loose inside a circular carving. Non-ideal sources of vibrations of structures are those whose characteristics are coupled to the motion of the structure, not being a function of time only as in the ideal case. Thus, in this case, an additional equation of motion is written, related to the motor rotation, coupled to the equation describing the horizontal motion of the shear building. This kind of problem can lead to the so-called Sommerfeld effect: steady state frequencies of the motor will usually increase as more power (voltage) is given to it in a step-by-step fashion. When a resonance condition with the structure is reached, the better part of this energy is consumed to generate large amplitude vibrations of the foundation without sensible change of the motor frequency as before. If additional increase steps in voltage are made, one may reach a situation where the rotor will jump to higher rotation regimes, no steady states being stable in between. As a device of passive control of both large amplitude vibrations and the Sommerfeld effect, a scheme is proposed using a point mass free to bounce back and forth inside a circular carving in the suspended mass of the structure. Numerical simulations of the model are also presented Copyright © 2007 by ASME.