4 resultados para planning project

em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"


Relevância:

60.00% 60.00%

Publicador:

Resumo:

This article presents the implementation of a distributed system of virtual reality, through the integration of services offered by the CORBA platform (Common Object Request Broker Architecture) and by the environment of development of 3D graphic applications in real time, the WorldToolkit, of Sense8. The developed application for the validation of this integration is that of a virtual city, with an emphasis on its traffic ways, vehicles (movable objects) and buildings (immovable objects). In this virtual world, several users can interact, each one controlling his/her own car. Since the modelling of the application took into consideration the criteria and principles of the Transport Engineering, the aim is to use it in the planning, project and construction of traffic ways for vehicles. The system was structured according to the approach client/server utilizing multicast communication among the participating nodes. The chosen implementation for the CORBA was the Iona's ORBIX software. The performance results obtained are presented and discussed in the end.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper proposes a methodology to achieve integrated planning and projects for secondary distribution circuits. The planning model is formulated as a mixed integer nonlinear programming problem (MINLP). In order to resolve this problem, a tabu search (TS) algorithm is used, with a neighborhood structure developed to explore the physical characteristics of specific geographies included in the planning and expansion of secondary networks, thus obtaining effective solutions as well as low operating costs and investments. The project stage of secondary circuits consists of calculating the mechanical efforts to determine the support structures of the primary and secondary distribution systems and determining the types of structures that should be used in the system according to topological and electrical parameters of the network and, therefore, accurately assessing the costs involved in the construction and/or reform of secondary systems. A constructive heuristic based on information of the electrical and topological conditions between the medium voltage and low voltage systems is used to connect the primary systems and secondary circuits. The results obtained from planning and design simulations of a real secondary system of electric energy distribution are presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A gestão colaborativa é, atualmente, um elemento-chave no contexto da gestão da cadeia de suprimentos. Neste artigo, o tema é abordado mediante a análise de um caso real, em que uma grande rede mundial de fast-food e seu prestador de serviço logístico (PSL) trabalharam conjuntamente no Brasil em um projeto-piloto para a implementação de um collaborative planning, forecasting, and replenishment (CPFR). O trabalho faz uso de uma metodologia de pesquisa-ação e apresenta as principais variáveis que influenciaram o projeto, abordando os processos necessários para a implementação e os pontos que favorecem o CPFR. Com base no caso estudado, o trabalho apresenta um conjunto de propostas sobre o papel dos agentes da cadeia em projetos dessa natureza. A gestão da cadeia de suprimentos por intermédio da coordenação direta de um PSL também permite demonstrar as possibilidades e dificuldades desse sistema, contribuindo com a visão colaborativa na cadeia de suprimentos a partir da relação entre seus agentes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Digital factory is a concept that offers a collaborative approach to enhance product and production engineering processes through simulation. Products, processes and resources are modeled to be used to develop and test the product conception and manufacturing processes, before their use in the real factory. The purpose of this paper is to present the steps to identify the Critical Success Factors (CSF) priorities in a digital factory project implementation in a Brazilian company and how the Delphi and AHP Methods are aiding to identify these CSF priorities. Copyright © 2008 SAE International.