11 resultados para enduring power of attorney

em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study was to verify the correlation between the Wingate arm crank test outputs (peak power, mean power, and fatigue index), obtained on a specific ergometer, and the performance in crawl stroke swim sprints of 14, 25, 50, and 400 m. The experiment was conducted with 9 healthy male volunteers (18.1 +/- 2.2 years of age; 172 +/- 0.04 cm; 67.7 +/- 5.92 kg and 15.7 +/- 4.57% body fat). on determined days, all individuals were submitted to the Wingate arm crank test and crawl freestyle sprints of 14, 25, 50, and 400 m as they were timed with a stopwatch. The peak power, the mean power, and the fatigue index, which were obtained during the Wingate arm crank test, were not significantly correlated with the maximum swim velocities during the crawl free-style tests of 14 (r = 0.40; r = 0.64; r = 0.11), 25 (r = 0.28; r = 0.39; r = -0.27), 50 (r = 0.03; r = 0.09; r = -0.31), and 400 (r = -0.52; r = -0.37; r = -0.65) m respectively. Thus, it is possible to conclude that the Wingate arm crank test is not suitable to assess the anaerobic power of swimmers under the described experimental conditions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A χ2 analysis is performed to test the resolving power of two-dimensional pion interferometry using for illustration the preliminary E802 data on Si+Au at 14.6 A GeV/c. We find that the resolving power to distinguish two decoupling geometries of different dynamical models is enhanced by studying the variation of the mean χ2 per degrees of freedom with respect to the range of the analysis in the qT, qL plane. The preliminary data seem to rule out dynamical models with significant ω, η resonance formation yields.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We show results from an analysis performed to test the resolving power of a two-dimensional χ2 method proposed previously when applied to the case of kaon interferometry, where no significant contribution from long-lived resonances is expected. For that purpose, use is made of the preliminary E859 K+K+ interferometry data from Si+Au collisions at 14.6/4 GeV/c. Although less sensitivity is achieved in the present case, this analysis seems to favor scenarios with no resonance formation at the AGS energy range. The possible compatibility of data with zero decoupling proper time interval, conjectured by the three-dimensional experimental analysis, is also investigated and is ruled out when considering more realistic dynamical models with expanding sources. Furthermore, these results strongly emphasize that the static Gaussian parametrization cannot be trusted under more realistic conditions, leading to a distorted or even wrong interpretation of the source parameters.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study was to verify the correlation between the Wingate arm crank test outputs (peak power, mean power, and fatigue index), obtained on a specific ergometer, and the performance in crawl stroke swim sprints of 14, 25, 50, and 400 m. The experiment was conducted with 9 healthy male volunteers (18.1 ± 2.2 years of age; 172 ± 0.04 cm; 67.7 ± 5.92 kg and 15.7 ± 4.57% body fat). On determined days, all individuals were submitted to the Wingate arm crank test and crawl freestyle sprints of 14, 25, 50, and 400 m as they were timed with a stopwatch. The peak power, the mean power, and the fatigue index, which were obtained during the Wingate arm crank test, were not significantly correlated with the maximum swim velocities during the crawl freestyle tests of 14 (r = 0.40; r = 0.64; r = 0.11), 25 (r = 0.28; r = 0.39; r = -0.17), 50 (r = 0.03; r = 0.09; r = -0.31), and 400 (r = -0.52; r = -0.37; r = -0.65) m, respectively. Thus, it is possible to conclude that the Wingate arm crank test is not suitable to assess the anaerobic power of swimmers under the described experimental conditions.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Direito - FCHS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The rural electrification is characterized by geographical dispersion of the population, low consumption, high investment by consumers and high cost. Moreover, solar radiation constitutes an inexhaustible source of energy and in its conversion into electricity photovoltaic panels are used. In this study, equations were adjusted to field conditions presented by the manufacturer for current and power of small photovoltaic systems. The mathematical analysis was performed on the photovoltaic rural system I- 100 from ISOFOTON, with power 300 Wp, located at the Experimental Farm Lageado of FCA/UNESP. For the development of such equations, the circuitry of photovoltaic cells has been studied to apply iterative numerical methods for the determination of electrical parameters and possible errors in the appropriate equations in the literature to reality. Therefore, a simulation of a photovoltaic panel was proposed through mathematical equations that were adjusted according to the data of local radiation. The results have presented equations that provide real answers to the user and may assist in the design of these systems, once calculated that the maximum power limit ensures a supply of energy generated. This real sizing helps establishing the possible applications of solar energy to the rural producer and informing the real possibilities of generating electricity from the sun.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of the present work is to analyze the histological changes on hamster buccal mucosa caused by the topical use of 7,12-dimethylbenzanthracene (DMBA) and exposition to a 220 μJ/pulse nitrogen laser light (@ 337 nm) at an average power of 2,3 mW. Twenty-one hamsters divided into two experimental groups were treated six times with DMBA. One hamster was kept as control. Group I was composed by ten hamsters and was submitted only to DMBA. Group II, also with ten hamsters, received the same treatment as group I and was exposed to the laser radiation. The time duration of each irradiation section was 10 seconds. All the treatment happened in alternated days. The histological analysis took place twice, after the end of the treatment and after sixty days. Both experimental groups presented dilatation of vessels, thickening of the epithelial tissue and the presence of inflammatory infiltrates. The preliminary results indicates that in group II the number of dilated vessels and its new area are much more significant than in group I.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Problems as voltage increase at the end of a feeder, demand supply unbalance in a fault condition, power quality decline, increase of power losses, and reduction of reliability levels may occur if Distributed Generators (DGs) are not properly allocated. For this reason, researchers have been employed several solution techniques to solve the problem of optimal allocation of DGs. This work is focused on the ancillary service of reactive power support provided by DGs. The main objective is to price this service by determining the costs in which a DG incurs when it loses sales opportunity of active power, i.e, by determining the Loss of Opportunity Costs (LOC). The LOC will be determined for different allocation alternatives of DGs as a result of a multi-objective optimization process, aiming the minimization of losses in the lines of the system and costs of active power generation from DGs, and the maximization of the static voltage stability margin of the system. The effectiveness of the proposed methodology in improving the goals outlined was demonstrated using the IEEE 34 bus distribution test feeder with two DGs cosidered to be allocated. © 2011 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper a heuristic technique for solving simultaneous short-term transmission network expansion and reactive power planning problem (TEPRPP) via an AC model is presented. A constructive heuristic algorithm (CHA) aimed to obtaining a significant quality solution for such problem is employed. An interior point method (IPM) is applied to solve TEPRPP as a nonlinear programming (NLP) during the solution steps of the algorithm. For each proposed network topology, an indicator is deployed to identify the weak buses for reactive power sources placement. The objective function of NLP includes the costs of new transmission lines, real power losses as well as reactive power sources. By allocating reactive power sources at load buses, the circuit capacity may increase while the cost of new lines can be decreased. The proposed methodology is tested on Garver's system and the obtained results shows its capability and the viability of using AC model for solving such non-convex optimization problem. © 2011 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Distributed Generation, microgrid technologies, two-way communication systems, and demand response programs are issues that are being studied in recent years within the concept of smart grids. At some level of enough penetration, the Distributed Generators (DGs) can provide benefits for sub-transmission and transmission systems through the so-called ancillary services. This work is focused on the ancillary service of reactive power support provided by DGs, specifically Wind Turbine Generators (WTGs), with high level of impact on transmission systems. The main objective of this work is to propose an optimization methodology to price this service by determining the costs in which a DG incurs when it loses sales opportunity of active power, i.e, by determining the Loss of Opportunity Costs (LOC). LOC occur when more reactive power is required than available, and the active power generation has to be reduced in order to increase the reactive power capacity. In the optimization process, three objectives are considered: active power generation costs of DGs, voltage stability margin of the system, and losses in the lines of the network. Uncertainties of WTGs are reduced solving multi-objective optimal power flows in multiple probabilistic scenarios constructed by Monte Carlo simulations, and modeling the time series associated with the active power generation of each WTG via Fuzzy Logic and Markov Chains. The proposed methodology was tested using the IEEE 14 bus test system with two WTGs installed. © 2011 IEEE.