192 resultados para Viability chart for the highway implantation
em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"
Resumo:
This study discuss the use of the geotechnologies to aid the planners on the terrain aptness definition for highways implantation and on the different trace evaluation to the extention of the Governador Carvalho Pinto highway, between Taubaté-SP and Aparecida do Norte-SP. Fratures on the area were mapping using Landsat ETM+, band Pan. In order to elaborate the phisical aptness chart for highway implantation was used the Analitical Hierarchy Process (AHP) operation, in on geographical information system (GIS). Using GIS were realized a ponderate middle with the soils, rocks, relief, slope, fractures and land use/cover maps. Using this physical aptness chart and joinning it with urban and restrict areas (that was inserted by the Boolean operation), were obtained a viability chart for highway implantation. Based on it were proposed three aleatory traces for the Carvalho Pinto highway. This traces were evaluated with the cross tabulation operation. The integration of the restrict areas, land use and phisical aptness in digital media can offer for the planners the cartography of the viability for the highway implantation. The evaliation of these three traces, based on the viability chart, can subsidyse the decision by the planners.
Resumo:
Purpose: the objective of the present investigation was to determine implantation and pregnancy rates in patients undergoing ICSI and treated with beta(2)-adrenergic agonists, considering the uterine-relaxing action of these agents.Methods: A total of 225 women undergoing ICSI at the Center for Human Reproduction, Sinha Junqueira Maternity Foundation, entered the study. Patient participation in each group was random, by drawing lots, using a randomization table previously elaborated for the study (2:2:1). The group I (90 women) received 10 mg of terbutaline daily for 15 days starting on the day of oocyte retrieval; group II (90 women) received 20 mg of ritodrine daily during the same period of time as group I; group III (45 patients) received no treatment and was used as control. The evaluation was interrupted in 3 patients of group I and in 30 patients of group II because of a high incidence of side effects.Results: Pregnancy, implantation, and miscarriage rates were not significantly different (p>0.05) between the three groups: 29.88%, 13.25%, and 26.9% for group I; 33.33%, 17.5%, and 10.0% for group II; 28.88%, 15.07%, and 15.38% for group III, respectively.Conclusions: the results of this study do not support the routine use of beta(2)-adrenergic agonists during the peri-implantation period in assisted reproductive technology cycles.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
In this article, we consider the synthetic control chart with two-stage sampling (SyTS chart) to control the process mean and variance. During the first stage, one item of the sample is inspected; if its value X, is close to the target value of the process mean, then the sampling is interrupted. Otherwise, the sampling goes on to the second stage, where the remaining items are inspected and the statistic T = Sigma [x(i) - mu(0) + xi sigma(0)](2) is computed taking into account all items of the sample. The design parameter is function of X-1. When the statistic T is larger than a specified value, the sample is classified as nonconforming. According to the synthetic procedure, the signal is based on Conforming Run Length (CRL). The CRL is the number of samples taken from the process since the previous nonconforming sample until the occurrence of the next nonconforming sample. If the CRL is sufficiently small, then a signal is generated. A comparative study shows that the SyTS chart and the joint X and S charts with double sampling are very similar in performance. However, from the practical viewpoint, the SyTS chart is more convenient to administer than the joint charts.
Resumo:
The possibility of reducing the concentration of the working solution used in the tetrazolium test for peanut seeds (Arachis hypogaea L.) with or without seedcoats was studied. Tetrazolium solutions of different concentrations (0.05%, 0.075% and 0.1%) were tested at the temperatures of 35 and 40 degrees C, for determining the time needed for the seeds to reach proper staining. The efficiency of the selected treatments in evaluating the viability potential of the seeds was determined by comparing the results of the tetrazolium tests with those obtained by standard germination (using sand and rolled paper towel as substrata) and seedling emergence in the field tests. Staining the seeds without seedcoat in 0.05% tetrazolium solution for three hours at 40 degrees C yielded efficient results. on the other hand, reduced concentrations can be employed in the staining process of seeds with seedcoat; however, this method requires a higher consumption of tetrazolium salt, longer staining time as well as a higher ability and availability of time for embryo evaluation, since the cross-cutting of seeds is much more difficult in the presence of the seedcoat and the occurrence of damage to the outer surface of the cotyledons cannot be determined.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
The VSS X chart, dedicated to the detection of small to moderate mean shifts in the process, has been investigated by several researchers under the assumption of known process parameters. In practice, the process parameters are rarely known and are usually estimated from an in-control Phase I data set. In this paper, we evaluate the (run length) performances of the VSS chart when the process parameters are estimated, we compare them in the case where the process parameters are assumed known and we propose specific optimal control chart parameters taking the number of Phase I samples into account.
Resumo:
Throughout this article, it is assumed that the no-central chi-square chart with two stage samplings (TSS Chisquare chart) is employed to monitor a process where the observations from the quality characteristic of interest X are independent and identically normally distributed with mean μ and variance σ2. The process is considered to start with the mean and the variance on target (μ = μ0; σ2 = σ0 2), but at some random time in the future an assignable cause shifts the mean from μ0 to μ1 = μ0 ± δσ0, δ >0 and/or increases the variance from σ0 2 to σ1 2 = γ2σ0 2, γ > 1. Before the assignable cause occurrence, the process is considered to be in a state of statistical control (defined by the in-control state). Similar to the Shewhart charts, samples of size n 0+ 1 are taken from the process at regular time intervals. The samplings are performed in two stages. At the first stage, the first item of the i-th sample is inspected. If its X value, say Xil, is close to the target value (|Xil-μ0|< w0σ 0, w0>0), then the sampling is interrupted. Otherwise, at the second stage, the remaining n0 items are inspected and the following statistic is computed. Wt = Σj=2n 0+1(Xij - μ0 + ξiσ 0)2 i = 1,2 Let d be a positive constant then ξ, =d if Xil > 0 ; otherwise ξi =-d. A signal is given at sample i if |Xil-μ0| > w0σ 0 and W1 > knia:tl, where kChi is the factor used in determining the upper control limit for the non-central chi-square chart. If devices such as go and no-go gauges can be considered, then measurements are not required except when the sampling goes to the second stage. Let P be the probability of deciding that the process is in control and P 1, i=1,2, be the probability of deciding that the process is in control at stage / of the sampling procedure. Thus P = P1 + P 2 - P1P2, P1 = Pr[μ0 - w0σ0 ≤ X ≤ μ0+ w 0σ0] P2=Pr[W ≤ kChi σ0 2], (3) During the in-control period, W / σ0 2 is distributed as a non-central chi-square distribution with n0 degrees of freedom and a non-centrality parameter λ0 = n0d2, i.e. W / σ0 2 - xn0 22 (λ0) During the out-of-control period, W / σ1 2 is distributed as a non-central chi-square distribution with n0 degrees of freedom and a non-centrality parameter λ1 = n0(δ + ξ)2 / γ2 The effectiveness of a control chart in detecting a process change can be measured by the average run length (ARL), which is the speed with which a control chart detects process shifts. The ARL for the proposed chart is easily determined because in this case, the number of samples before a signal is a geometrically distributed random variable with parameter 1-P, that is, ARL = I /(1-P). It is shown that the performance of the proposed chart is better than the joint X̄ and R charts, Furthermore, if the TSS Chi-square chart is used for monitoring diameters, volumes, weights, etc., then appropriate devices, such as go-no-go gauges can be used to decide if the sampling should go to the second stage or not. When the process is stable, and the joint X̄ and R charts are in use, the monitoring becomes monotonous because rarely an X̄ or R value fall outside the control limits. The natural consequence is the user to pay less and less attention to the steps required to obtain the X̄ and R value. In some cases, this lack of attention can result in serious mistakes. The TSS Chi-square chart has the advantage that most of the samplings are interrupted, consequently, most of the time the user will be working with attributes. Our experience shows that the inspection of one item by attribute is much less monotonous than measuring four or five items at each sampling.
Resumo:
The VSS X- chart is known to perform better than the traditional X- control chart in detecting small to moderate mean shifts in the process. Many researchers have used this chart in order to detect a process mean shift under the assumption of known parameters. However, in practice, the process parameters are rarely known and are usually estimated from an in-control Phase I data set. In this paper, we evaluate the (run length) performances of the VSS X- control chart when the process parameters are estimated and we compare them in the case where the process parameters are assumed known. We draw the conclusion that these performances are quite different when the shift and the number of samples used during the phase I are small. ©2010 IEEE.
Resumo:
The MRMAX chart is a single chart based on the standardized sample means and sample ranges for monitoring the mean vector and the covariance matrix of multivariate processes. User's familiarity with the computation of these statistics is a point in favor of the MRMAX chart. As a single chart, the recently proposed MRMAX chart is very appropriate for supplementary runs rules. In this article, we compare the supplemented MRMAX chart and the synthetic MRMAX chart with the standard MRMAX chart. The supplementary and the synthetic runs rules enhance the performance of the MRMAX chart. © 2013 Elsevier Ltd.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
OBJECTIVE: To assess the presence of microorganism contamination in the preservation solution for transplant organs (kidney/pancreas). Method: Between August 2007 and March 2008, 136 samples of preservation solution were studied prior to graft implantation. Variables related to the donor and to the presence of microorganisms in the preservation solution of organs were evaluated, after which the contamination was evaluated in relation to the recipient culture variable. Univariate and multivariate statistical analyses were performed. RESULTS: The contamination rate of the preservation solution was 27.9%. Coagulase-negative Staphylococcus was the most frequently isolated microorganism. However, highly virulent agents, such as fungi and enterobacteria, were also isolated. In univariate analysis, the variable donor antibiotic use was significantly associated to the contamination of the preservation solution. on the other hand, multivariate analysis found statistical significance in donor antibiotic use and donor's infectious complications variables. CONCLUSIONS: In this study, 27.9% of the preservation solutions of transplant organs were contaminated. Infectious diseases and non-use of antibiotics by the donor were significantly related to the presence of microorganisms in organ preservation solutions. Contamination in organ preservation solutions was not associated with infection in the recipient.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)