9 resultados para Power Reactor Development Co.

em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The resistive-type superconducting fault current limiters (RSFCL) prototypes using YBCO-coated conductors have shown current limitation for medium voltage class applications for acting time up to 80 ms. By connecting an air-core reactor in parallel with the RSFCL, thus making an hybrid current limiter, one can extend the acting time for up to 1 s. In this work, we report the performance of a hybrid current limiter subjected to an AC peak fault current of 2 kA during 1 s for which within the first 80 ms the SFCL limits the current concurrently with the air-core reactor, and for the remaining 920 ms, only the air-core reactor limits the current. In order to evaluate the actual conditions for subsequent reconnection of RSFCL to the power grid, the hybrid fault current limiter was tested varying the time interval for recovery from 900 ms and 1.2 s, followed again by the concurrent operation of the hybrid limiter during 1 s (SFCL during 80 ms). From this evaluation test, the recovery time can be measured and compared using the voltage peak generated in superconducting module from the first and second fault test. The recovery time was also determined through the pulsed current method (PCM) on short-length sample test. The results showed that the fault current was limited from 1.9 kA down to 514 A after 1 cycle of 60 Hz frequency, with recovery time lower than 1.2 s for two subsequent fault current tests.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this work is to study voltage control and energy balance of a split DC bus topology within a power electronics equipment connected to the AC mains, such as UPS systems, wind power generators, active filters and FACTS devices. A typical configuration in such equipment has two mains connected converters sharing a common DC bus, one series connected and the other parallel connected. The DC bus is usually composed by a battery or a capacitor bank. In the proposed topology, the DC bus is divided in two sides, interconnected with a buck-boost converter, which controls power flow and DC voltage on both sides. © 2009 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Problems as voltage increase at the end of a feeder, demand supply unbalance in a fault condition, power quality decline, increase of power losses, and reduction of reliability levels may occur if Distributed Generators (DGs) are not properly allocated. For this reason, researchers have been employed several solution techniques to solve the problem of optimal allocation of DGs. This work is focused on the ancillary service of reactive power support provided by DGs. The main objective is to price this service by determining the costs in which a DG incurs when it loses sales opportunity of active power, i.e, by determining the Loss of Opportunity Costs (LOC). The LOC will be determined for different allocation alternatives of DGs as a result of a multi-objective optimization process, aiming the minimization of losses in the lines of the system and costs of active power generation from DGs, and the maximization of the static voltage stability margin of the system. The effectiveness of the proposed methodology in improving the goals outlined was demonstrated using the IEEE 34 bus distribution test feeder with two DGs cosidered to be allocated. © 2011 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Zootecnia - FCAV

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The conventional Newton's method has been considered inadequate to obtain the maximum loading point (MLP) of power systems. It is due to the Jacobian matrix singularity at this point. However, the MLP can be efficiently computed through parameterization techniques of continuation methods. This paper presents and tests new parameterization schemes, namely the total power losses (real and reactive), the power at the slack bus (real or reactive), the reactive power at generation buses, the reactive power at shunts (capacitor or reactor), the transmission lines power losses (real and reactive), and transmission lines power (real and reactive). Besides their clear physical meaning, which makes easier the development and application of continuation methods for power systems analysis, the main advantage of some of the proposed parameters is that its not necessary to change the parameter in the vicinity of the MLP. Studies on the new parameterization schemes performed on the IEEE 118 buses system show that the ill-conditioning problems at and near the MLP are eliminated. So, the characteristics of the conventional Newton's method are not only preserved but also improved. (C) 2003 Elsevier B.V. B.V. All rights reserved.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Pós-graduação em Agronomia (Energia na Agricultura) - FCA

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Resistive-type of superconducting fault current limiters (RSFCL) have been developed for medium voltage class aiming to operate at 1 MVA power capacity and short time recovery (< 2 s). A RSFCL in form of superconducting modular device was designed and constructed using 50 m-length of YBCO coated conductor tapes for operation under 1 kV / 1 kA and acting time of 0.1 s. In order to increase the acting time the RSFCL was combined with an air-core reactor in parallel to increase the fault limiting time up to 1 s. The tests determined the electrical and thermal characteristics of the combined resistive/ inductive protection unit. The combined fault current limiter reached a limiting current of 583 A, corresponding to a limiting factor of 3.3 times within an acting time of up to 1 s.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper has the objective of monitoring the biological activity of composting process of sewage sludge, sugarcane bagasse and ground coffee in a hermetic rotary reactor using the respirometric method in laboratory scale, in order to obtain parameters and system design for large scale projects. Another particularity of this study is the use of a hermetic reactor with gas purging cycles. Purging was performed when the percentage of oxygen reached less than 5%, thus eliminating the gaseous mixture (with elevated CO2 ratio) and the introduction of environmental air with around 21% of O2, successively until the compost was stabilized. The average purge intervals obtained were 29 h and 2 min with reactor rotation frequency of 15 min. The time of the compost stabilization was optimized in 60% if compared to the 90 days in the traditional method. The results obtained can be used to design the process in industrial scale using a simple O2 gas analyzer.