15 resultados para Pavimento
em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"
Aproveitamento de resíduos de concreto na confecção de peças para pavimento intertravado de concreto
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
The objective of this work was collect information of articles published previously and carry out a study about them, including contents and interesting stuff that bring growth regarding the construction residues utilization and demolition (RCD), that today provides many environmental impacts. The need of utilization of the RCD in Brazil and in the world earned bigger attention world speaking, therefore the industry of the civil construction is had as one of the biggest present residues output springs. For it present a point that can be applied the RCD, is discussed in that work the kinds and structures of floors, where are presented the layers and, finally, a short argument about the possible and economic feasabilities job of the residues recycled in some layers of the structure of floor
Resumo:
Tempestitos grossos constituem camadas delgadas de conglomerado gradando a arenito, com estratificação cruzada seguida de laminação ondulada truncante a simétrica e de drape/flaser de siltito/folhelho. Cinco exemplos extraídos do Permiano da bacia do Paraná ilustram esse tipo de depósito: três deles são de rochas siliciclásticas, contendo bioclastos de bivalves e vertebrados (Formação Rio Bonito-Membro Triunfo e Formação Palermo), enquanto os outros dois são de rochas carbonática e fosfática (respectivamente, formações Teresina e Corumbataí do Grupo Passa Dois). O componente tracional da base do tempestito grosso apresenta-se como arenite quartzoso/lítico ou grainstone oolítico com cimento calcífero preenchendo poros (casos das formações Palermo e Teresina). em sua maioria, os tempestitos grossos constituem pavimentos transgressivos intercalados em folhelhos ou tempestitos finos (arenitos muito finos a folhelhos com estratificação ondulada truncante-hummocky). em outro caso, extraído de subsuperfície, o pavimento transgressivo ocorre na base de uma sucessão progradante de barra de plataforma. O tempestito grosso da Formação Teresina constitui um evento transgressivo sobreposto a depósitos de barra de plataforma.
Resumo:
Pós-graduação em Ciência e Tecnologia de Materiais - FC
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
This work presents the results obtained in analyzes of aggregates from construction and demolition waste produced by the plant of the City of Guaratinguetá. Using this data and comparing with the specifications of NBR 15115, it was found that the materials do not possess the requisite minimum characteristics to be utilized as a basis for low-pavement traffic. In order to identify the main reasons of the material does not fit in the standard, we used the data obtained in a study conducted by Professor. Dr. Luiz Eduardo de Oliveira at the plant of the company AB Environmental Solutions Ltd., located in Pindamonhangaba. With different characteristics, the aggregates from construction and demolition waste produced by this plant showed the possibility of using pavements. The use of these residues in paving reduces the impact on the environment caused by construction.
Resumo:
This work discusses the design of flexible pavements for airports, with the aid techniques and tools necessary for the calculation and design critical aircraft as the Boeing 777-300ER. Also discussed the layers that make up the pavement, the materials used and the method used for design pavement (FAA method)
Resumo:
Neste projeto criou-se pequenos espaços localizados na região central de Bauru [Calçadão na Rua Batista de Carvalho], propondo um design estruturado nas condições ambientais, morfológicas e valorizando edificações históricas. Pretendeu-se introduzir uma linguagem formal diversificada. Esta proposta de renovação urbana da área implica em uma reestruturação urbana de maior amplitude, sendo apenas um item dos vários necessários para a transformação da área. O sistema de mudanças envolve a inclusão de habitação nos prédios ociosos e/ou degradados através de políticas públicas. Para a proposição, foram selecionados - para a demolição - lotes desprovidos de valor histórico-arquitetônico e de menor valor comercial (geralmente de um pavimento). Pretendeu-se transformá-los em quintais para a nova população residente e para os citadinos que usufruem a área no seu cotidiano. Os materiais e métodos usados para a elaboração do projeto foram: fotografias, fotos aéreas, teses de graduação e mestrado, fotos de satélites, imagens antigas, bem como o levantamento “in loco”. Assim, o corredor comercial em questão será (re)1qualificado a partir da implantação do projeto com destaque ao tratamento paisagístico, voltado à integração da área, a criação de uma unidade paisagística e a imagem da região em questão
Resumo:
Are being released in the construction market in Brazil ventures called Super 6. These businesses sell the promise of delivery of the apartment in six months after the launch of the venture. To meet this deadline are being deployed the constructive method of concrete walls using aluminum shapes. This system basically consists of pouring slabs and walls once, i.e. building up the wall shapes and slab joints. On the walls are used cloth, with reinforcements in vain and corners of walls and on these screens are tied the electrical boxes and conduits. For each tower is used the so-called system of half way, i.e. the system so it is sufficient to mount the Middle deck. Using a concrete which can be deformed in the next day you can lift one deck every two days with ready electric and hydraulicsystem, without having to tow the wall doing only minor fixes in the imperfections after concrete. With this system won an incredible speed in the construction of the structure reducing in almost one-third the length of the work. This work aims to compare in terms of cost-benefit of masonry structural systems and this new concrete wall system called Super 6. For this comparison will be used as parameter values used for the achievement of the Enterprise Portal of Roses of constructor Tenda which is one of the first to use concrete wall system. This project basically consists of seven towers of six floors each and will be budgeted the cost of this project if it were held in structural masonry. From these data it will be possible to make a comparison about the actual beneficial to adopt this system
Resumo:
This work brings to its content proposed deployment of a system of quality management in paving asphalt based on the elaboration of a basic training to meet those entering this area of civil engineering at a technical manual for the implementation of major services running on paving of roads. The training was designed to serve both those entering the field of asphalt paving, synthesizing the complex processes involved in paving services and providing an overview of the steps in implementation thereof, as well as entrants must meet the enterprise user of this system, providing them an idea of the method used by the company designing the paving of roads. The technical manual presented in turn, has 8 (eight) of the main services components of a work of paving, which are: Mobilization and Maintenance of construction site, Regularization and subfloor preparation, execution or sub-base BGS base (graded gravel plain), Execution of sub-base or base BGTC (graded gravel treated with cement), Implementation of subbase or base Macadam hydraulic Priming bituminous waterproofing, asphalt binder Priming and finally the execution flexible pavement - HMA (hot milled asphalt concrete). These services are presented in the form of IT-Education work, this seven items are presented that guide the performance of services, thus providing overall guidelines to perform the services described in it. The development of IT's was based on experiences in day-to-day paving near the theoretical precepts presented in the literature, so the conditions specified in these documents aim to always guide the implementation of services in general, giving the process a versatility major operation, as this work takes into account the dynamics of such services, as well as the variety of their execution according to local conditions and specified in the project. So in general we can say that this ... (Complete abstract click electronic access below)
Resumo:
In this work was developed a program capable of performing automatic counting of vehicles on roads. The problem of counting vehicles is using expensive techniques for its realization, techniques which often involve manual counting or degradation of the pavement. The main motivation for this work was the importance that the vehicle counting represents to the Traffic Engineer, being essential to analyze the performance of the roads, allowing to measure the need for installation of traffic lights, roundabouts, access ways, among other means capable of ensuring a continuous flow and safe for vehicles. The main objective of this work was to apply a statistical segmentation technique recently developed, based on a nonparametric linear regression model, to solve the segmentation problem of the program counter. The development program was based on the creation of three major modules, one for the segmentation, another for the tracking and another for the recognition. For the development of the segmentation module, it was applied a statistical technique combined with the segmentation by background difference, in order to optimize the process. The tracking module was developed based on the use of Kalman filters and application of simple concepts of analytical geometry. To develop the recognition module, it was used Fourier descriptors and a neural network multilayer perceptron, trained by backpropagation. Besides the development of the modules, it was also developed a control logic capable of performing the interconnection among the modules, mainly based on a data structure called state. The analysis of the results was applied to the program counter and its component modules, and the individual analysis served as a means to establish the par ameter values of techniques used. The find result was positive, since the statistical segmentation technique proved to be very useful and the developed program was able to count the vehicles belonging to the three goal..
Resumo:
This work has as objective, show and compares some of several evaluation methods of pavements, based in the rules and researches realized by another authors, with focus on low traffic volume pavements, which are generally more economic flexible pavements subjected to low loads. Were addressed structure evaluation methods and superficial evaluation methods applied to that kind of pavement, exposing of clearly the procedures to be performed, the advantages and disadvantages, as well the results obtained in the execution of each one of these. This theme was chosen by the widespread use of this type of pavement in the road network of the country and the fact that there is no still a culture of the practical of evaluation nor technical knowledge on the part of municipal governments that are usually responsible for these roads. This study also aims to guide the process of maintenance preventive or recuperative, as they are often made improvements that do not actually solve the real problem of the roads
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Engenharia Civil - FEIS