54 resultados para Hydropower system control

em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Optimised placement of control and protective devices in distribution networks allows for a better operation and improvement of the reliability indices of the system. Control devices (used to reconfigure the feeders) are placed in distribution networks to obtain an optimal operation strategy to facilitate power supply restoration in the case of a contingency. Protective devices (used to isolate faults) are placed in distribution systems to improve the reliability and continuity of the power supply, significantly reducing the impacts that a fault can have in terms of customer outages, and the time needed for fault location and system restoration. This paper presents a novel technique to optimally place both control and protective devices in the same optimisation process on radial distribution feeders. The problem is modelled through mixed integer non-linear programming (MINLP) with real and binary variables. The reactive tabu search algorithm (RTS) is proposed to solve this problem. Results and optimised strategies for placing control and protective devices considering a practical feeder are presented. (c) 2007 Elsevier B.V. All rights reserved.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A produção de massa seca, a taxa de decomposição e a liberação de nitrogênio (N) foram avaliadas em um experimento com sete tipos de cobertura vegetal: milheto pérola (Pennisetum americanum sin. tiphoydes), braquiária (Brachiaria brizantha), sorgo forrageiro (Sorghum bicolor L. Moench), guandu (Cajanus cajan (L.) Millsp), crotalária juncea (Crotalarea juncea) e aveia-preta (Avena strigosa Schreb), em pousio e em área de cultivo convencional (testemunha), em solo de cerrado, em Uberaba, região do Triângulo Mineiro. Dentre as coberturas avaliadas, o milheto e a crotalária foram as que apresentaram a maior produção de massa seca, maior acúmulo e a maior liberação de N. A braquiária foi a cobertura que apresentou a maior taxa de decomposição. Todas as coberturas apresentaram a maior taxa de liberação de N até 42 dias após dessecação.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper presents an interior point method for the long-term generation scheduling of large-scale hydrothermal systems. The problem is formulated as a nonlinear programming one due to the nonlinear representation of hydropower production and thermal fuel cost functions. Sparsity exploitation techniques and an heuristic procedure for computing the interior point method search directions have been developed. Numerical tests in case studies with systems of different dimensions and inflow scenarios have been carried out in order to evaluate the proposed method. Three systems were tested, with the largest being the Brazilian hydropower system with 74 hydro plants distributed in several cascades. Results show that the proposed method is an efficient and robust tool for solving the long-term generation scheduling problem.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In this work, a Finite Element Method treatment is outlined for the equations of Magnetoaerodynamics. In order to provide a good basis for numerical treatment of Magneto-aerodynamics, a full version of the complete equations is presented and FEM contribution matrices are deduced, as well as further terms of stabilization for the compressible flow case.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In this work the problem of defects location in power systems is formulated through a binary linear programming (BLP) model based on alarms historical database of control and protection devices from the system control center, sets theory of minimal coverage (AI) and protection philosophy adopted by the electric utility. In this model, circuit breaker operations are compared to their expected states in a strictly mathematical manner. For solving this BLP problem, which presents a great number of decision variables, a dedicated Genetic Algorithm (GA), is proposed. Control parameters of the GA, such as crossing over and mutation rates, population size, iterations number and population diversification, are calibrated in order to obtain efficiency and robustness. Results for a test system found in literature, are presented and discussed. © 2004 IEEE.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This work presents an alternative approach based on neural network method in order to estimate speed of induction motors, using the measurement of primary variables such as voltage and current. Induction motors are very common in many sectors of the industry and assume an important role in the national energy policy. The nowadays methodologies, which are used in diagnosis, condition monitoring and dimensioning of these motors, are based on measure of the speed variable. However, the direct measure of this variable compromises the system control and starting circuit of an electric machinery, reducing its robustness and increasing the implementation costs. Simulation results and experimental data are presented to validate the proposed approach. © 2003-2012 IEEE.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEG

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Agronomia (Produção Vegetal) - FCAV

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The objective of this work is to study the implantation feasibility of a small hydropower system in a rural area in Guaratinguetá. Due to its location and accessibility, and the costs involved in extending the public distribution line to the property it could turn become viable the construction of an individual electric generation system. As alternatives, a solar photovoltaic system and combustion engine-electric generator systems were considered. However, the existence of a small river inside the property, the construction of a micro hydropower plant was taken into account. The choice of the micro power hydropower plant was determined by the owner and was based on the costs. The topographic and hydrological profiles as well as the geometrical characteristics of the system, including the civil infrastructure needed and the more adequate turbine, were determined. Finally, the cost spreadsheet was set and the results were compared with those calculated for the extension of the available public distribution system

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The research aimed to evaluate the relationship between the thermal environment of the rest pens in a pig slaughterhouse and the surface temperature (ST) of the animals as well as the effect of intermittent water spraying on thermal comfort. There were two visits to slaughter industrial being in each selected three pens of rest, one for control treatment (no spray throughout the period) and two for the treatment of intermittent spraying water (30 minutes intervals with constant spray followed by 30 minutes then turned off). Assessments began at the time of discharging animals in which are taken the thermographic images from lots using an infrared thermographic camera. After housing in the pens, were registered the thermographic images and the respiratory frequency (RF) every five minutes for four hours. Were evaluated the temperature, relative humidity and temperature-humidity index (THI). Considering the values of THI was observed that the animals remained in a condition of comfort only at the time of his arrival at the slaughterhouse. The ST and RF of the animals kept in the pens without sprinkler system (control) showed a linear increase in function of time of day, with increasing temperature. The treatment with intermittent sprinkling of water was observed oscillatory behavior of the ST and RF, however it was always lower than the control treatment, even in times when the water sprinklers were turned off. The time required of spray to reduction and stabilization of the ST of the animals was limited to the combination of temperature and relative humidity, being estimated at 25 minutes at times of higher THI. The maximum environmental temperature during evaluation was 28.4 oC.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Hazard Analysis and Critical Control Point (HACCP) is a preventive system that intends to guarantee the safety and harmlessness of food. It improves the quality of products as it eliminates possible defects during the process, and saves costs by practically eliminating final product inspection. This work describes the typical hazards encountered on the mushroom processing line for fresh consumption. Throughout the process, only the reception stage of mushrooms has been considered a critical control point (CCP). The main hazards at this stage were: the presence of unauthorised phytosanitary products; larger doses of such products than those permitted; the presence of pathogenic bacteria or thermo-stable enterotoxins. Putting into practice such knowledge would provide any industry that processes mushrooms for fresh consumption with a self-control HACCP-based system for its own productions.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In order to provide a low cost system of thermal comfort, a common model of home fan, 40 cm diameter size, had its manual four-button control system replaced by an automatic speed control. The new control system has a temperature sensor feeding a microcontroller that, by using an optic coupling, DIAC or TRIAC-based circuit, varies the RMS value of the fan motor input voltage and its speed, according to the room temperature. Over a wide range of velocity, the fan net power and the motor fan input power were measured working under both control system. The temperature of the motor stator and the voltage waveforms were observed too. Measured values analysis showed that the TRIAC-based control system makes the fan motor work at a very low power factor and efficiency values. The worst case is at low velocity range where the higher fan motor stator temperatures were registered. The poor power factor and efficiency and the harmonics signals inserted in the motor input voltage wave by the TRIAC commutation procedure are correlated.