11 resultados para Hydro power
em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"
Resumo:
The Brazilian relief, predominantly composed by small mountains and plateaus, contributed to formation of rivers with high amount of falls. With exception to North-eastern Brazil, the climate of this country are rainy, which contributes to maintain water flows high. These elements are essential to a high hydroelectric potential, contributing to the choice of hydroelectric power plants as the main technology of electricity generation in Brazil. Though this is a renewable source, whose utilized resource is free, dams must to be established which generates a high environmental and social impact. The objective of this study is to evaluate the impact caused by these dams through the use of environmental indexes. These indexes are ratio formed by installed power with dam area of a hydro power plant, and ratio formed by firm power with this dam area. In this study, the greatest media values were found in South, Southeast, and Northeast regions respectively, and the smallest media values were found in North and Mid-West regions, respectively. The greatest encountered media indexes were also found in dams established in the 1950s. In the last six decades, the smallest indexes were registered by darns established in the 1980s. These indexes could be utilized as important instruments for environmental impact assessments, and could enable a dam to be established that depletes an ecosystem as less as possible.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
A implantação de microcentrais hidrelétricas é uma das alternativas para suprir com energia comunidades pequenas e isoladas, situadas normalmente na área rural. O aproveitamento de potenciais hidráulicos de pequeno porte é uma alternativa cada vez mais viável devido não só à falta de recursos financeiros para os grandes empreendimentos, mas também pelo imenso potencial de geração em centrais de pequeno porte, que pouco tem sido aproveitado. O objetivo deste trabalho foi de apresentar uma metodologia simples de engenharia para estimar o custo das Bombas Funcionando como Turbinas (BFTs) utilizadas em microcentrais hidrelétricas, que possam ser usadas em estudos preliminares de novos aproveitamentos hidrelétricos, sem uma investigação detalhada dos lugares onde se pretende implantar. Os custos foram obtidos consultando-se diretamente os fabricantes de equipamentos e o mercado da praça de Ponta Grossa - PR. Os resultados mostraram que, para as microcentrais hidrelétricas, sempre que os custos constituírem o aspecto dominante, e para potências até 50 kW, a opção por Bombas Funcionando como Turbinas (BFTs) deve ser considerada em lugar das turbinas hidráulicas.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
The growing demand for electricity in Brazil has stimulated the implementation of Small Hydro Power (PCH) in various regions of the country. However, the silting of reservoirs is a major problem faced by power plants and power plants. In this context, this study aimed to evaluate the data hydrosedimentological strategic points of the watershed of the Alto Rio Sucuriú (MS) to identify the possible causes siltation of the reservoir PCH Costa Rica and suggest mitigation measures. Hydrosedimentological surveys were conducted during the rainy season (February / March 2012) and drought (August 2012), and obtained data flow, discharge liquid, suspended solids and bottom and organic matter content. Based on these results it was determined that the points 2, 4, 7 and 9 are the largest contributors to sedimentation, and point 4 got most liquid discharge (38,20 m3s-1), point 7 largest discharge of solid suspension (906,3 mg L-1), points 2 and 4 major discharges solid totals (231,59 t dia-1 and 238,185 t dia-1 respectively) and point 9 higher organic matter content (22,18%) . Found greater fraction of fine sand and very fine suspended solids and solid medium sand in the background. As mitigation measures for the process of silting of the reservoir PCH Costa Rica (MS) highlights the orientation of landowners in adopting conservation measures and planting of leguminous species native to the region in symbiosis with nitrogen-fixing bacteria
Resumo:
Pós-graduação em Geografia - FCT
Resumo:
Pós-graduação em Engenharia Mecânica - FEG
Resumo:
Pós-graduação em Engenharia Mecânica - FEG
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Pós-graduação em Agronomia - FEIS
Resumo:
This paper presents a nonlinear model with individual representation of plants for the centralized long-term hydrothermal scheduling problem over multiple areas. In addition to common aspects of long-term scheduling, this model takes transmission constraints into account. The ability to optimize hydropower exchange among multiple areas is important because it enables further minimization of complementary thermal generation costs. Also, by considering transmission constraints for long-term scheduling, a more precise coupling with shorter horizon schedules can be expected. This is an important characteristic from both operational and economic viewpoints. The proposed model is solved by a sequential quadratic programming approach in the form of a prototype system for different case studies. An analysis of the benefits provided by the model is also presented. ©2009 IEEE.