This work brings to its content proposed deployment of a system of quality management in paving asphalt based on the elaboration of a basic training to meet those entering this area of civil engineering at a technical manual for the implementation of major services running on paving of roads. The training was designed to serve both those entering the field of asphalt paving, synthesizing the complex processes involved in paving services and providing an overview of the steps in implementation thereof, as well as entrants must meet the enterprise user of this system, providing them an idea of the method used by the company designing the paving of roads. The technical manual presented in turn, has 8 (eight) of the main services components of a work of paving, which are: Mobilization and Maintenance of construction site, Regularization and subfloor preparation, execution or sub-base BGS base (graded gravel plain), Execution of sub-base or base BGTC (graded gravel treated with cement), Implementation of subbase or base Macadam hydraulic Priming bituminous waterproofing, asphalt binder Priming and finally the execution flexible pavement - HMA (hot milled asphalt concrete). These services are presented in the form of IT-Education work, this seven items are presented that guide the performance of services, thus providing overall guidelines to perform the services described in it. The development of IT's was based on experiences in day-to-day paving near the theoretical precepts presented in the literature, so the conditions specified in these documents aim to always guide the implementation of services in general, giving the process a versatility major operation, as this work takes into account the dynamics of such services, as well as the variety of their execution according to local conditions and specified in the project. So in general we can say that this ... (Complete abstract click electronic access below)