5 resultados para Expected Cost
em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
We develop an economic model for X̄ control charts having all design parameters varying in an adaptive way, that is, in real time considering current sample information. In the proposed model, each of the design parameters can assume two values as a function of the most recent process information. The cost function is derived and it provides a device for optimal selection of the design parameters. Through a numerical example one can foresee the savings that the developed model possibly provides. © 2001 Elsevier Science B.V. All rights reserved.
Resumo:
Research has shown that applying the T-2 control chart by using a variable parameters (VP) scheme yields rapid detection of out-of-control states. In this paper, the problem of economic statistical design of the VP T-2 control chart is considered as a double-objective minimization problem with the statistical objective being the adjusted average time to signal and the economic objective being expected cost per hour. We then find the Pareto-optimal designs in which the two objectives are met simultaneously by using a multi-objective genetic algorithm. Through an illustrative example, we show that relatively large benefits can be achieved by applying the VP scheme when compared with usual schemes, and in addition, the multi-objective approach provides the user with designs that are flexible and adaptive.
Resumo:
This work describes a methodology developed for determination of costs associated to products generated in a small wastewater treatment station for sanitary wastewater from a university campus. This methodology begins with plant component units identification, relating their fluid and thermodynamics features for each point marked in its process diagram. Following, its functional diagram is developed and its formulation is elaborated, in exergetic base, describing all equations for these points, which are the constraints for exergetic production cost problem and are used in equations to determine the costs associated to products generated in SWTS. This methodology was applied to a hypothetical system based on SWTS former parts and presented consistent results when compared to expected values based on previous exergetic expertise. (C) 2008 Elsevier Ltd. All rights reserved.
Resumo:
Energetic cost of digging behavior in workers of the leaf-cutting ant Atta sexdens (Fabricius). During nest excavation, leaf-cutting ant workers undergo reduction in their body reserve, particularly carbohydrates. In order to estimate the energetic cost of digging, groups of 30 workers of the leaf-cutting ant Atta sexdens were sealed in a hermetic chamber for 24, 48 and 72 hours, with and without soil for digging, and had the CO2 concentration measured using respirometric chambers as well as volume of soil excavated (g). As expected, the worker groups that carried out soil excavation expelled more carbon dioxide than the groups that did not excavate. Therefore, a worker with body mass of 9.65 ± 1.50 mg dug in average 0.85 ± 0.27 g of soil for 24 hours, consuming ca. 0.58 ± 0.23 J. In this study, we calculate that the energetic cost of excavation per worker per day in the experimental set-up was ca. 0.58 J.