Resumo:
An analysis of the performances of three important methods for generators and loads loss allocation is presented. The discussed methods are: based on pro-rata technique; based on the incremental technique; and based on matrices of circuit. The algorithms are tested considering different generation conditions, using a known electric power system: IEEE 14 bus. Presented and discussed results verify: the location and the magnitude of generators and loads; the possibility to have agents well or poorly located in each network configuration; the discriminatory behavior considering variations in the power flow in the transmission lines. © 2004 IEEE.
Resumo:
The need for a rational use of water and supply of food for a growing world population have led to the development of research in the area of irrigation systems. Thus, some irrigation systems which join efficiency with low cost of material have been developed. Although some technical characteristics are provided by the manufacturers, tests are required to verify functioning of the system and uniformity of water distribution. Continuous research on uniformity, characteristics of the materials and design of water distribution systems is essential for system improvement. Therefore, the objective of this work was to evaluate the CV (manufacturer's coefficient of variation) of Amanco microsprinkler (1.0 mm light green nipple) using bench testing in the laboratory of Irrigation at UNESP - FCA campus of Botucatu-SP. Twenty-five microsprinklers in a sequential design were used in the tests. Three flow systems were tested as follows: a Coil system based on serial connected pipes; a Lateral system, the most common system in which secondary lines are fed by a main line; and a Mesh system used in the urban water supply. The results showed that 4.17% CVf met the production standards and the Lateral and Mesh systems were similar regarding outflow using bench testing. The Mesh system presented the highest mean value of outflow and the lowest range of variation.
Resumo:
This work presents a case study on technology assessment for power quality devices. A system compatibility test protocol for power quality mitigation devices was developed in order to evaluate the functionality of three-phase voltage restoration devices. In order to case test this test protocol, a development platform with reduced power for DVR (Dynamic Voltage Restorer), the Micro-DVR, was tested, and results were discussed based on voltage disturbances standards. ©2008 IEEE.
Resumo:
Using robots for teaching is one approach that has gathered good results on Middle-School, High-School and Universities. Robotics gives chance to experiment concepts of a broad range of disciplines, principally those from Engineering courses and Computer Science. However, there are not many kits that enables the use of robotics in classroom. This article describes the methodologies to implement tools which serves as test beds for the use of robotics to teach Computer Science and Engineering. Therefore, it proposes the development of a flexible, low cost hardware to integrate sensors and control actuators commonly found on mobile robots, the development of a mobile robot device whose sensors and actuators allows the experimentation of different concepts, and an environment for the implementation of control algorithms through a computer network. This paper describes each one of these tools and discusses the implementation issues and future works. © 2010 IEEE.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
A pressure analgesiometric device was developed for unrestrained cats. Eleven cats were studied. Stimulation was via three rounded pins within a bracelet on the forearm. The pins were advanced by manual bladder inflation. Bladder pressure was measured using a strain gauge pressure transducer. The threshold was recorded at the behavioural end point. Thresholds were measured at 5 and 15 min intervals for 2-4 h, after removal/replacement of the cuff, for 120 min after SC butorphanol (0.4 mg/kg), and with mild skin inflammation at the testing site. Data were analysed using ANOVA. Pressure thresholds in untreated cats were around 150 mmHg. The minimum interval for testing was established as 15 min. Data were reproducible over 4 h and beyond 24 h. Thresholds in 5 cats increased (P < 0.05) above baseline for 45 min after butorphanol with a maximum increase of 270 +/- 182 mmHg at 10 min. Thresholds decreased with inflammation. The method appears suitable for feline analgesia investigations. (c) 2006 Elsevier Ltd. All rights reserved.
Resumo:
The growing use of sensitive loads in the electric power system, especially in industrial applications, increases voltage sags related production losses considerably, stimulating a demand for power electronics' based solutions to mitigate the effects of such problems. This paper shows the implementation and some industrial certification tests of a power equipment prototype designed to correct sags and swells, a dynamic voltage restorer, which is one of the many possible solutions for voltage sags and swells problems Experimental results of a 75kVA prototype are shown both in laboratory and full load conditions, in a certification institution (IEE-USP). © 2011 IEEE.