219 resultados para Electric equipment

em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"


Relevância:

60.00% 60.00%

Publicador:

Resumo:

A model for preventive control in electrical systems is presented, taking into account the dynamic aspects of the network. Among these aspects, the effects provoked by perturbations which cause oscillations in synchronous machine angles (transient stability), such as electric equipment outages and short circuits, are presented. The energy function is used to measure the stability of the system using a procedure defined as the security margin. The control actions employed are load shedding and generation reallocation. An application of the methodology to a system located in southern Brazil, which is composed of 10 synchronous machines, 45 busses, and 72 transmission lines. The results confirm the theoretical studies.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Reliability is a key aspect in power system design and planning. Maintaining a reliable power system is a very important issue for their design and operation. Under the new competitive framework of the electricity sector, power systems find ever more and more strained to operate near their limits. Under this new scenario, it is crucial for the system operator to use tools that facilitate an energy dispatch that minimizes possible power cuts. This paper presents a mathematical model to calculate an energy dispatch that considers security constraints (single contingencies in transmission lines and transformers). The model involves pool markets and fixed bilateral contracts. Traditional methodologies that include security constraints are usually based in multistage dispatch processes. In this case, we propose a single-stage model that avoids the economic inefficiencies which result when conventional multi-stage dispatch approaches are applied. The proposed model includes an AC representation of the transport system and allows calculating the cost overruns incurred in due to reliability restrictions. We found that complying with fixed bilateral contracts, when they go above certain levels, might lead to congestion problems in transmission lines.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper proposes and describes a high power factor AC-AC converter for naval applications using Permanent Magnet Generator (PMG). The three-phase output voltages of the PMG vary from 260 Vrms (220 Hz) to 380 Vrms (360 Hz), depending on load conditions. The proposed converter consists of a Y-/ΔY power transformer, which provides electrical isolation between the PMG and remaining stages, and a twelve-pulse uncontrolled rectifier stage directly connected to a single-phase inverter stage, without the use of an intermediary DC-DC topology. This proposal results in more simplicity for the overall circuitry, assuring robustness, reliability and reduced costs. Furthermore, the multipulse rectifier stage is capable to provide high power factor and low total harmonic distortion for the input currents of the converter. The single-phase inverter stage was designed to operate with wide range of DC bus voltage, maintaining 120 Vrms, 60 Hz output. The control philosophy, implemented in a digital signal processor (DSP) which also contains protection routines, alows series connections between two identical converters, achieving 240 Vrms, 60 Hz total output voltage. Measured total harmonic distortion for the AC output voltage is lower than 2% and the input power factor is 0.93 at 3.6kW nominal load. © 2010 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Brazilian National Electricity Conservation Program - PROCEL - runs regular surveys in the electric-energy-consumption market. These studies are used as valuable data to better plan the actions of this program. These data also evaluate the program's performance by identifying the level of penetration of the most efficient electric equipment within the residential sector. PROCEL's main lines of action is to promote and make available the most efficient technologies. Based on the results from the latest survey, it is estimated that 24% of the electric-energy consumption of the residential sector is used by electric shower devices, which instantaneously heat the water that flows through them, normally using an electric resistance of 5 kW. These are an important factor in a country where electric-heating devices are present in about 73% of Brazilian households. Keeping that in mind, the purpose of this work is to present the main results of the Brazilian Solar-Water-Heating-Systems Evaluation, finished in 2010, where 535 installations were visited and more than 50 researchers from different universities participated in the project. Moreover, seven Brazilian cities were selected to be studied. The information was collected from field research and statistically treated. The collected information focused on the adequacy of the project to the household, installation, operation and life cycle of the systems, as well as the users' satisfaction level. Technical questionnaires were developed to summarize all the required information, such as a Web site designed to organize and manage the data collected and a Matlab application that performed the dimensioning and F-chart systems evaluation. Quality indicators were created through a full system monitoring, with thermographic analysis and evaluation of shading influence at the system's efficiency, using the Ecotect software.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Neste trabalho, ajustou-se um modelo matemático para quantificar o efeito do rendimento do motor elétrico sobre os custos de um sistema de bombeamento para irrigação na estrutura tarifária de energia elétrica convencional e horo-sazonal verde, bem como calcular o tempo de recuperação do capital investido no equipamento de maior rendimento. em seguida, o mesmo foi aplicado a um sistema de irrigação tipo pivô central em duas opções de rendimento do motor elétrico: 92,6% (linha padrão) e 94,3% (linha alto rendimento), sendo que o custo de aquisição do primeiro correspondeu a 70% do segundo. A potência do motor elétrico era de 100 cv. Os resultados mostraram que o modelo permitiu avaliar se um motor de alto rendimento era viável economicamente em relação ao motor-padrão em cada estrutura tarifária. Nas duas estruturas tarifárias, o motor de alto rendimento não foi viável. Na tarifa horo-sazonal verde, somente seria viável se seu rendimento fosse 4,46% superior ao do motor-padrão. Na tarifa convencional, somente seria viável se o ganho de rendimento superasse 2,71%.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objective. Measure physical therapists' exposure to the electric and magnetic fields produced by 17 shortwave diathermy devices in physical therapy clinics in the city of Presidente Prudente, São Paulo State, Brazil. Compare the observed values with the exposure levels recommended by the International Commission on Non-ionizing Radiation Protection (ICNIRP). Observe the efficacy of Faraday cages as a means of protecting physical therapists from exposure to oscillating electric and magnetic fields.Methods. Electric and magnetic field measurements were taken at four points during actual physical therapy sessions: in proximity to the operator's pelvis and head, the devices' electrical cables, and the electrodes. The measuring equipment was a Wandel & Goltermann EMR-200.Results. The values obtained in proximity to the electrodes and cables were 10 to 30 times higher than ICNIRP's recommended occupational reference levels. In the shortwave diathermy treatment rooms with Faraday cages, the fields were even higher than in treatment rooms not so equipped-principally the magnetic field, where the values were more than 100 times higher than the ICNIRP exposure limit.Conclusions. The electric and magnetic field intensities obtained in this study are generally above the exposure levels recommend in ICNIRP standards. It was also observed that the Faraday cage offers physical therapists no protection, and instead, increases their level of exposure.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The use of mean values of thermal and electric demand can be justifiable for synthesising the configuration and for estimating the economic results because it simplifies the analysis in a preliminary feasibility study of a cogeneration plant. For determining the cogeneration scheme that best fits the energetic needs of a process several cycles and combinations must be considered, and those technically feasible will be analysed according to economic models. Although interesting for a first approach, this procedure do not consider that the peaks and valleys present in the load patterns will impose additional constraints relatively to the equipment capacities. In this paper, the effects of thermal and electric load fluctuation to the cogeneration plant design were considered. An approach for modelling these load variability is proposed for comparing two competing thermal and electric parity competing schemes. A gas turbine associated to a heat recovery steam generator was then proposed and analysed for thermal- and electric-following operational strategies. Thermal-following option revealed to be more attractive for the technical and economic limits defined for this analysis. (c) 2006 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Continuing development of new materials makes systems lighter and stronger permitting more complex systems to provide more functionality and flexibility that demands a more effective evaluation of their structural health. Smart material technology has become an area of increasing interest in this field. The combination of smart materials and artificial neural networks can be used as an excellent tool for pattern recognition, turning their application adequate for monitoring and fault classification of equipment and structures. In order to identify the fault, the neural network must be trained using a set of solutions to its corresponding forward Variational problem. After the training process, the net can successfully solve the inverse variational problem in the context of monitoring and fault detection because of their pattern recognition and interpolation capabilities. The use of structural frequency response function is a fundamental portion of structural dynamic analysis, and it can be extracted from measured electric impedance through the electromechanical interaction of a piezoceramic and a structure. In this paper we use the FRF obtained by a mathematical model (FEM) in order to generate the training data for the neural networks, and the identification of damage can be done by measuring electric impedance, since suitable data normalization correlates FRF and electrical impedance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this work, a heuristic model for integrated planning of primary distribution network and secondary distribution circuits is proposed. A Tabu Search (TS) algorithm is employed to solve the planning of primary distribution networks. Evolutionary Algorithms (EA) are used to solve the planning model of secondary networks. The planning integration of both networks is carried out by means a constructive heuristic taking into account a set of integration alternatives between these networks. These integration alternatives are treated in a hierarchical way. The planning of primary networks and secondary distribution circuits is carried out based on assessment of the effects of the alternative solutions in the expansion costs of both networks simultaneously. In order to evaluate this methodology, tests were performed for a real-life distribution system taking into account the primary and secondary networks.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper proposes a new approach for optimal phasor measurement units placement for fault location on electric power distribution systems using Greedy Randomized Adaptive Search Procedure metaheuristic and Monte Carlo simulation. The optimized placement model herein proposed is a general methodology that can be used to place devices aiming to record the voltage sag magnitudes for any fault location algorithm that uses voltage information measured at a limited set of nodes along the feeder. An overhead, three-phase, three-wire, 13.8 kV, 134-node, real-life feeder model is used to evaluate the algorithm. Tests show that the results of the fault location methodology were improved thanks to the new optimized allocation of the meters pinpointed using this methodology. © 2011 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The system reliability depends on the reliability of its components itself. Therefore, it is necessary a methodology capable of inferring the state of functionality of these components to establish reliable indices of quality. Allocation models for maintenance and protective devices, among others, have been used in order to improve the quality and availability of services on electric power distribution systems. This paper proposes a methodology for assessing the reliability of distribution system components in an integrated way, using probabilistic models and fuzzy inference systems to infer about the operation probability of each component. © 2012 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

O objetivo deste trabalho foi avaliar as taxas de ativação e de clivagem de oócitos bovinos tratados com estrôncio (10mm de SrCl2), após maturação in vitro por 27-28 horas. No experimento 1, os tratamentos foram: S4 - ativação pelo estrôncio por 4 horas; S12 - ativação pelo estrôncio por 12 horas; S30 - ativação pelo estrôncio por 30 horas; e P - ativação por pulso elétrico (3 pulsos de 1,0kv/cm). No experimento 2 os tratamentos foram: PS4 - ativação combinada pelo pulso elétrico e pelo estrôncio por 4 horas; S4P - ativação pelo estrôncio por 4 horas e pelo pulso elétrico; e PS30 - ativação pelo pulso elétrico e pelo estrôncio por 30 horas. No experimento 1, todos os tratamentos apresentaram taxas similares de ativação (83-90%; P>0,05). Para clivagem, P foi melhor (53%; P<0,05) do que todos os tratamentos com estrôncio (6 a 28%). No experimento 2, o tratamento S4P apresentou melhor taxa de ativação (88%; P<0,05) do que PS4 e PS30 (60 e 68%, respectivamente). Para clivagem, observou-se o mesmo padrão, S4P (65%; P<0,05) e PS4 e PS30 (37% e 44%, respectivamente). Conclui-se que o estrôncio é capaz de ativar oócitos bovinos e sua combinação com pulso elétrico não melhora a ativação. Este é o primeiro relato demonstrando que o estrôncio ativa oócitos bovinos.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this study was to develop a laboratory method for time response evaluation on electronically controlled spray equipment using Programmable Logic Controllers (PLCs). For that purpose, a PLC controlled digital drive inverter was set up to drive an asynchronous electric motor linked to a centrifugal pump on a experimental sprayer equipped with electronic flow control. The PLC was operated via RS232 serial communication from a PC computer. A user program was written to control de motor by adjusting the following system variables, all related to the motor speed: time stopped; ramp up and ramp down times, time running at a given constant speed and ramp down time to stop the motor. This set up was used in conjunction with a data acquisition system to perform laboratory tests with an electronically controlled sprayer. Time response for pressure stabilization was measured while changing the pump speed by +/-20%. The results showed that for a 0.2 s ramp time increasing the motor speed, as an example, an AgLogix Flow Control system (Midwest Technologies Inc.) took 22 s in average to readjust the pressure. When decreasing the motor speed, this time response was down to 8 s. General results also showed that this kind of methodology could make easier the definition of standards for tests on electronically controlled application equipment.