With the considerable increase of the losses in electric utilities of developing countries, such as Brazil, there is an investigation for loss calculation methodologies, considering both technical (inherent of the system) and non-technical (usually associated to the electricity theft) losses. In general, all distribution networks know the load factor, obtained by measuring parameters directly from the network. However, the loss factor, important for the energy loss cost calculation, can only be obtained in a laborious way. Consequently, several formulas have been developed for obtaining the loss factor. Generally, it is used the expression that relates both factors, through the use of a coefficient k. Last reviews introduce a range of factor k within 0.04 - 0.30. In this work, an analysis with real life load curves is presented, determining new values for the coefficient k in a Brazilian electric utility. © 2006 IEEE.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper presents a methodology for the placement and sizing evaluation of distributed generation (DG) in electric power systems. The candidate locations for DG placement are identified on the bases of Locational Marginal Prices (LMP's) obtained from an optimal power flow solution. The problem is formulated for two different objectives: social welfare maximization and profit maximization. For each DG unit an optimal placement is identified for each of the objectives.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This article shows an analysis of the longitudinal electric parameters of a three-phase transmission line/section using a 280-meter high steel tower. This characteristic, the height of the line conductors and distance between them, are intrinsic related to the longitudinal and transversal parameters of the line. By this means, an accurate study was carried out in order to show the electric variations between a transmission line using the new technology and a three-phase conventional 440 kV line for a wide range of frequencies and a variable soil resistivity. In addition, by using a digital line model, simulations are carried out in time domain to analyze critical overvoltage transients on the studied line. © 2011 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In this work the problem of defects location in power systems is formulated through a binary linear programming (BLP) model based on alarms historical database of control and protection devices from the system control center, sets theory of minimal coverage (AI) and protection philosophy adopted by the electric utility. In this model, circuit breaker operations are compared to their expected states in a strictly mathematical manner. For solving this BLP problem, which presents a great number of decision variables, a dedicated Genetic Algorithm (GA), is proposed. Control parameters of the GA, such as crossing over and mutation rates, population size, iterations number and population diversification, are calibrated in order to obtain efficiency and robustness. Results for a test system found in literature, are presented and discussed. © 2004 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Distribution systems with distributed generation require new analysis methods since networks are not longer passive. Two of the main problems in this new scenario are the network reconfiguration and the loss allocation. This work presents a distribution systems graphic simulator, developed with reconfiguration functions and a special focus on loss allocation, both considering the presence of distributed generation. This simulator uses a fast and robust power flow algorithm based on the current summation backward-forward technique. Reconfiguration problem is solved through a heuristic methodology and the losses allocation function, based on the Zbus method, is presented as an attached result for each obtained configuration. Results are presented and discussed, remarking the easiness of analysis through the graphic simulator as an excellent tool for planning and operation engineers, and very useful for training. © 2004 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In this work, the planning of secondary distribution circuits is approached as a mixed integer nonlinear programming problem (MINLP). In order to solve this problem, a dedicated evolutionary algorithm (EA) is proposed. This algorithm uses a codification scheme, genetic operators, and control parameters, projected and managed to consider the specific characteristics of the secondary network planning. The codification scheme maps the possible solutions that satisfy the requirements in order to obtain an effective and low-cost projected system-the conductors' adequate dimensioning, load balancing among phases, and the transformer placed at the center of the secondary system loads. An effective algorithm for three-phase power flow is used as an auxiliary methodology of the EA for the calculation of the fitness function proposed for solutions of each topology. Results for two secondary distribution circuits are presented, whereas one presents radial topology and the other a weakly meshed topology. © 2005 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Starting from the deregulated process of the Electric Sector, there was the need to attribute responsibilities to several agents and to elaborate appropriate forms of remuneration of the services rendered by the same. One of the services of great importance within this new electric sector is the Ancillary Services. Among the various types of Ancillary Services, Spinning Reserve is a service necessary for maintaining the integrity of the transmission system from either generation interruptions or load variations. This paper uses the application of the Economic Dispatch theory with the objective of quantifies the availability of Spinning Reserve supply in hydroelectric plants. The proposed methodology utilizes the generating units as well as their efficiencies so as to attend the total demand with the minimum water discharge. The proposed methodology was tested through the data provided by the Água Vermelha Hydroelectric Power Plant. These tests permitted the opportunity cost valuation to the Spinning Reserve supply in hydroelectric plants. © 2005 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In this paper it is proposed a novel hybrid three-phase rectifier capable to achieve high input power factor (PF), and low total harmonic distortion in the input currents (THDI). The proposed hybrid high power rectifier is composed by a standard three-phase 6-pulses diode rectifier (Graetz bridge) with a parallel connection of single-phase Boost rectifiers in each three-phase rectifier leg. Such topology results in a structure capable of programming the input current waveform and providing conditions for obtaining high input power factor and low harmonic current distortion. In order to validate the proposed hybrid rectifier, this paper describes its principles of operation, with detailed experimental results and discussions on power rating of the required Boost converters as related to the desired total harmonic current distortion. It is demonstrated that only a fraction of the output power is processed through the Boost converters, making the proposed solution economically viable for very high power installations, with fast pay back of the investment. Moreover, retrofitting to existing installations is also feasible since the parallel path can be easily controlled by integration with the existing de-link. A prototype rated at 6 kW has been implemented in laboratory and fully demonstrated its operation, performance and feasibility to high power applications. © 2005 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In the spatial electric load forecasting, the future land use determination is one of the most important tasks, and one of the most difficult, because of the stochastic nature of the city growth. This paper proposes a fast and efficient algorithm to find out the future land use for the vacant land in the utility service area, using ideas from knowledge extraction and evolutionary algorithms. The methodology was implemented into a full simulation software for spatial electric load forecasting, showing a high rate of success when the results are compared to information gathered from specialists. The importance of this methodology lies in the reduced set of data needed to perform the task and the simplicity for implementation, which is a great plus for most of the electric utilities without specialized tools for this planning activity. © 2008 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Given that the total amount of losses in a distribution system is known, with a reliable methodology for the technical loss calculation, the non-technical losses can be obtained by subtraction. A usual method of calculation technical losses in the electric utilities uses two important factors: load factor and the loss factor. The load factor is usually obtained with energy and demand measurements, whereas, to compute the loss factor it is necessary the learning of demand and energy loss, which are not, in general, prone of direct measurements. In this work, a statistical analysis of this relationship using the curves of a sampling of consumers in a specific company is presented. These curves will be summarized in different bands of coefficient k. Then, it will be possible determine where each group of consumer has its major concentration of points. ©2008 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Fraud detection in energy systems by illegal consumers is the most actively pursued study in non-technical losses by electric power companies. Commonly used supervised pattern recognition techniques, such as Artificial Neural Networks and Support Vector Machines have been applied for automatic commercial frauds identification, however they suffer from slow convergence and high computational burden. We introduced here the Optimum-Path Forest classifier for a fast non-technical losses recognition, which has been demonstrated to be superior than neural networks and similar to Support Vector Machines, but much faster. Comparisons among these classifiers are also presented. © 2009 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The objective of this paper is to show a methodology to estimate the longitudinal parameters of transmission lines. The method is based on the modal analysis theory and developed from the currents and voltages measured at the sending and receiving ends of the line. Another proposal is to estimate the line impedance in function of the real-time load apparent power and power factor. The procedure is applied for a non-transposed 440 kV three-phase line. © 2011 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Non-technical losses identification has been paramount in the last decade. Since we have datasets with hundreds of legal and illegal profiles, one may have a method to group data into subprofiles in order to minimize the search for consumers that cause great frauds. In this context, a electric power company may be interested in to go deeper a specific profile of illegal consumer. In this paper, we introduce the Optimum-Path Forest (OPF) clustering technique to this task, and we evaluate the behavior of a dataset provided by a brazilian electric power company with different values of an OPF parameter. © 2011 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This work has as objectives the implementation of a intelligent computational tool to identify the non-technical losses and to select its most relevant features, considering information from the database with industrial consumers profiles of a power company. The solution to this problem is not trivial and not of regional character, the minimization of non-technical loss represents the guarantee of investments in product quality and maintenance of power systems, introduced by a competitive environment after the period of privatization in the national scene. This work presents using the WEKA software to the proposed objective, comparing various classification techniques and optimization through intelligent algorithms, this way, can be possible to automate applications on Smart Grids. © 2012 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The non-technical loss is not a problem with trivial solution or regional character and its minimization represents the guarantee of investments in product quality and maintenance of power systems, introduced by a competitive environment after the period of privatization in the national scene. In this paper, we show how to improve the training phase of a neural network-based classifier using a recently proposed meta-heuristic technique called Charged System Search, which is based on the interactions between electrically charged particles. The experiments were carried out in the context of non-technical loss in power distribution systems in a dataset obtained from a Brazilian electrical power company, and have demonstrated the robustness of the proposed technique against with several others nature-inspired optimization techniques for training neural networks. Thus, it is possible to improve some applications on Smart Grids. © 2013 IEEE.