10 resultados para Distribution companies

em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"


Relevância:

70.00% 70.00%

Publicador:

Resumo:

In an evermore competitive environment, power distribution companies need to continuously monitor and improve the reliability indices of their systems. The network reconfiguration (NR) of a distribution system is a technique that well adapts to this new deregulated environment for it allows improvement of system reliability indices without the onus involved in procuring new equipment. This paper presents a reliability-based NR methodology that uses metaheuristic techniques to search for the optimal network configuration. Three metaheuristics, i.e. Tabu Search, Evolution Strategy, and Differential Evolution, are tested using a Brazilian distribution network and the results are discussed. © 2009 IEEE.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In this study, a novel approach for the optimal location and contract pricing of distributed generation (DG) is presented. Such an approach is designed for a market environment in which the distribution company (DisCo) can buy energy either from the wholesale energy market or from the DG units within its network. The location and contract pricing of DG is determined by the interaction between the DisCo and the owner of the distributed generators. The DisCo intends to minimise the payments incurred in meeting the expected demand, whereas the owner of the DG intends to maximise the profits obtained from the energy sold to the DisCo. This two-agent relationship is modelled in a bilevel scheme. The upper-level optimisation is for determining the allocation and contract prices of the DG units, whereas the lower-level optimisation is for modelling the reaction of the DisCo. The bilevel programming problem is turned into an equivalent single-level mixed-integer linear optimisation problem using duality properties, which is then solved using commercially available software. Results show the robustness and efficiency of the proposed model compared with other existing models. As regards to contract pricing, the proposed approach allowed to find better solutions than those reported in previous works. © The Institution of Engineering and Technology 2013.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A bilevel programming approach for the optimal contract pricing of distributed generation (DG) in distribution networks is presented. The outer optimization problem corresponds to the owner of the DG who must decide the contract price that would maximize his profits. The inner optimization problem corresponds to the distribution company (DisCo), which procures the minimization of the payments incurred in attending the expected demand while satisfying network constraints. The meet the expected demand the DisCo can purchase energy either form the transmission network through the substations or form the DG units within its network. The inner optimization problem is substituted by its Karush- Kuhn-Tucker optimality conditions, turning the bilevel programming problem into an equivalent single-level nonlinear programming problem which is solved using commercially available software. © 2010 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper presents a methodology and a specialist tool for failure probability analysis of induction type watt-hour meters, considering the main variables related to their measurement degradation processes. The database of the metering park of a distribution company, named Elektro Electricity and Services Co., was used for determining the most relevant variables and to feed the data in the software. The modeling developed to calculate the watt-hour meters probability of failure was implemented in a tool through a user friendly platform, written in Delphi language. Among the main features of this tool are: analysis of probability of failure by risk range; geographical localization of the meters in the metering park, and automatic sampling of induction type watt-hour meters, based on a risk classification expert system, in order to obtain information to aid the management of these meters. The main goals of the specialist tool are following and managing the measurement degradation, maintenance and replacement processes for induction watt-hour meters. © 2011 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In an ever more competitive environment, power distribution companies must satisfy two conflicting objectives: minimizing investment costs and the satisfaction of reliability targets. The network reconfiguration of a distribution system is a technique that well adapts to this new deregulated environment for it allows improvement of reliability indices only opening and closing switches, without the onus involved in acquiring new equipment. Due to combinatorial explosion problem characteristic, in the solution are employed metaheuristics methods, which converge to optimal or quasi-optimal solutions, but with a high computational effort. As the main objective of this work is to find the best configuration(s) of the distribution system with the best levels of reliability, the objective function used in the metaheuristics is to minimize the LOLC - Loss Of Load Cost, which is associated with both, number and duration of electric power interruptions. Several metaheuristics techniques are tested, and the tabu search has proven to be most appropriate to solve the proposed problem. To characterize computationally the problem of the switches reconfiguring was developed a vector model (with integers) of the representation of the switches, where each normally open switch is associated with a group of normally closed switches. In this model simplifications have been introduced to reduce computational time and restrictions were made to exclude solutions that do not supply energy to any load point of the system. To check violation of the voltage and loading criteria a study of power flow for the ten best solutions is performed. Also for the ten best solutions a reliability evaluation using Monte Carlo sequential simulation is performed, where it is possible to obtain the probability distributions of the indices and thus calculate the risk of paying penalty due to not meeting the goals. Finally, the methodology is applied in a real Brazilian distribution network, and the results are discussed.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In the last decades it has been observed a substantial developing of the electrical energy demand in the societies all over the World. In consequence the electrical energy distribution companies are increasing the quantity of electrical energy through the electrical energy conductor cables, which had grown the sag in the towers of energy transmission. Furthermore, the construction of more transmission towers brings a lot of troubles due environmental protection laws. In this way, looking forward to increase the quantity of electrical energy transmitted through electrical cables conductors, reduce the need of constructing new transmission towers and the sag in them, we suggest in this work the replace of the traditional core of the conductors cables commonly used, made of steel, by a core made by a composite material, which one is made by carbon fibers pultruded with polymeric resins as matrix. In a order to evaluate if the resins more commonly used in structural composites can be applied as matrix to make possible to use the composite material as a core, we made carbon fibers systems pultruded with epoxy, phenolic and polyester resins as matrix and a mechanic and physic-chemistry characterization was done on the systems by Tensile and Poisson tests, differential sprobe calorimetry (DSC), thermogravimetric analysis (TGA) and Fourier transformed infrared spectroscopy (FTIR), following their correspondents standards

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this study was to develop a methodology for evaluating neighborhood impacts using a Geographic Information System (GIS) and to apply the procedures to the companies of the High-Technology Industrial Cluster of São Carlos. To this end, an evaluation was made of the neighborhood impacts on the physical environment, urban components, quality of life, and urban infrastructure using impact matrices, and the impacts were assigned scores according to type, order, magnitude and duration. Fifty one companies were examined based on data provided by the companies themselves and on field surveys. The impacts are represented spatially in proportional symbols maps, based on the spatial distribution of the companies in the urban area of the city of São Carlos and the areas of influence of each company. The application of the proposed methodology served to validate it and indicated that the neighborhood impacts caused by the companies of this study are related to each company's type of activity, its size, and its occupation of the area. © 2008 Journal of Urban and Environmental Engineering (JUEE). All rights reserved.