15 resultados para Cuenca hidrológica

em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The object of this work was to make a morphometric characterization of the Bobo river watershed in the Nariño department in Colombia. A map was created from topographical maps (1:25.000 scale) using the drainage network and the limit of each 2nd order microbasin as database. Dimensional, drainage network and relief morphometric parameters were evaluated for a later hy-drological study. The drainage area was 224.97 km2, having a 71.31 km perimeter. The Bobo river watershed is considered to be 6th order and has 176 2nd order drainage channels, 34 3rd order drainage channels, 9 4th order drainage channels and 3 5th order drainage channels. Average drainage density is 3.71km/km2, reflecting its high density, having strong, dissected geological formation. The area has a typical Andean land-use pattern, having native wooded vegetation, traditional transitory potato and vegetable growing predominating.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Agronomia (Energia na Agricultura) - FCA

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Seeking the integrated management of water resources and financial compensation especially as a management tool, according to the Law No. 9433 of 1997 and No. 9985 of 2000. This research's main objective is measuring the flow contribution of Núcleo Santa Virginia, the State Park of Serra do Mar, starting from the hydrological regionalization method, developed by the Department of Water and Power. According to the Law 9985 of 2000 Conservation Units have the right to receive in the form of an investment a portion of the amount paid by Power Plants, being passed directly to the Conservation Units, differently from the 9433 Act. By dividing the area of Núcleo Santa Virgínia, in Sub-basins, it was possible to find the minimum flow during seven consecutive days, with a return period of ten years, Q7,10, and steady water flow in 95% of the time, Q95 for the Center and from these data to calculate the monetary value of law under Articles 47 and 48 from Law 9985 of 2000

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of the research was to define the classes of use capacity of 2403.25 ha in the basin of the Corriente del Lobo - Itatinga (SP), (22°03'56" to 22°59'12" of latitude S and 48°38'47" to 48°41'25" of longitude W Gr.). The soil use capacity was obtained by using the SIG IDRISI 32 crossing the documents of steepness and soils and the document of judgment of classes of soil use capacity and of the utilitarian rising of the physical milieu. The classes and subclasses areas of use capacity presented the following values: IIIa - 68.60 ha (2.85%), IIIe,s - 1919.15 ha (79.86%); IIIe - 210.60 ha (8.76%); IVe - 3.38ha (0.14%); IVe,s - 157.42 ha (6.55%) and VIe,s - 44.10 ha (1.84%). The lands of the basin were distributed in three classes (III, IV and VI) and six subclasses but the biggest extension (79.9%) belonged to the subclass IIIe,s. The modules of the IDRISI allowed to discriminate, mapping and to quantify quickly the soil use capacity of the areas of classes and subclasses in the basin.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this work was to evaluate the sediment production in the initial part of the Pardo River Basin - Botucatu/SP from 1994 to 1999, using the mathematical hydrological model SWAT. It was used topographic maps and satellite data manipulated in GIS using the software SPRING 5.1.6. The simulation of sediment production was generated with the aid of an interface between the hydrological model SWAT 2009 with ArcView ®, version 9.3. The maps of Soil, Land Use and Digital Elevation Model (DEM) were generated in the GIS-SPRING 5.1.6 and exported to ArcSWAT 2009. The tabular data related to the parameters of soil and meteorological parameters were entered directly to the SWAT. The model allowed to estimate the sediment production. A sediment average production rate of 33.866 ton ha-1 over the six years of study was computed in the point of discharge of the basin.