4 resultados para Construction equipment

em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"


Relevância:

30.00% 30.00%

Publicador:

Resumo:

A nephelometric technique based on a liquid drop is described for the measurement of atmospheric sulfur dioxide. A 40-mul drop of barium chloride and hydrogen peroxide solution is suspended in a flowing-air sampling stream. The sulfur (IV) collected is oxidized to sulfur (VI) and finally precipitated as barium sulfate. Nephelometric detection of drop is achieved by an appropriate arrangement consisting of an optical fiber contacting the drop and a photodiode placed at 90degrees relative to the fiber. The design and characteristics of this drop-based gas sensor system are described. The analytical response, as photocurrent, is proportional to the product of the sampling period and the sulfur dioxide concentration. The detection limit is ca. 1.1 mg m(-3) for a 10-min sampling time. The present technique is fairly rapid and simple, uses a small amount of reagent and is set up with low-cost equipment, making this system economically viable. (C) 2002 Elsevier B.V. B.V. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The greatest challenge of undergraduate engineering courses is to encourage creativity, cooperation with other students, teamwork, and motivation in the first years of their courses. While students have little or no contact with advanced disciplines, it is very difficult to attract their interests and encourage them to develop the skills in their undergraduate courses. This work aims to achieve these objectives through a mini-factory project involving the construction of a production line of ceramic tiles on a laboratory scale, from the ceramic processing using raw materials to the shipping of the final product. Having been given an established monthly demand for ceramic tiles, the students determined the construction requirements of the mini-factory, as they have created the layout, including the processing equipment, the dimensioning of equipment, and its operational structure. This article intends to describe the successful creation of the ceramic tile mini-factory, including the objectives, benefits, and inherent difficulties of the process and the receptivity of the exercise by the students involved.