3 resultados para Concrete walls
em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"
Resumo:
This work presents a fast, easy, standardized and planned method to build family homes in order to collaborate with the decline of housing deficit and, at the same time, meet families who wish to invest in building their own houses, once that our country is experiencing an economical prosperity . This method has been widely used nowadays because it is being deployed in large-scale and in a standardized pattern, reducing decreasing significantly the construction time. The concrete wall, shaped in loco depends on unique processes. For this reason, a well trained staff is required so the constructive process can be executed in a fast pace, showing better results than other construction methods. This project will address all the materials used to build the molded concrete walls in loco, their sequence assembly, application, types, characteristics and performances. At the end, a way used by building companies of locating the concrete will also be given. Although there is no specific Brazilian norm for this type of construction, a study on this topic will soon be released. Therefore, the studies for the execution of this project were based on Brazilian standards prevailing at the time, construction magazines and books that are based on building methods considered more common
Resumo:
Are being released in the construction market in Brazil ventures called Super 6. These businesses sell the promise of delivery of the apartment in six months after the launch of the venture. To meet this deadline are being deployed the constructive method of concrete walls using aluminum shapes. This system basically consists of pouring slabs and walls once, i.e. building up the wall shapes and slab joints. On the walls are used cloth, with reinforcements in vain and corners of walls and on these screens are tied the electrical boxes and conduits. For each tower is used the so-called system of half way, i.e. the system so it is sufficient to mount the Middle deck. Using a concrete which can be deformed in the next day you can lift one deck every two days with ready electric and hydraulicsystem, without having to tow the wall doing only minor fixes in the imperfections after concrete. With this system won an incredible speed in the construction of the structure reducing in almost one-third the length of the work. This work aims to compare in terms of cost-benefit of masonry structural systems and this new concrete wall system called Super 6. For this comparison will be used as parameter values used for the achievement of the Enterprise Portal of Roses of constructor Tenda which is one of the first to use concrete wall system. This project basically consists of seven towers of six floors each and will be budgeted the cost of this project if it were held in structural masonry. From these data it will be possible to make a comparison about the actual beneficial to adopt this system
Resumo:
The present study is in reference to precast concrete (panels) walls as the main structural system. The diversification of the structural systems is a reality due to specific characteristics', as a result there is a lack of study and analysis. Some systems are already established in their applications, for instance: conventional reinforced concrete, structural masonry, metal structures, and wood structure. Apart from this precast concrete elements has had a growth in building sites in Brazil, therefore professionals should be more aware. Affordable house funding initiatives to address the housing shortage has been recurrent throughout the country, additionally precast concrete walls has been an alternative that meets the three basic concepts of engineering, which are: the technique, economy, and security. The objective of this study is to gather concepts from the literature and TOMO (2012) about precast concrete walls and make a didactic synthesis of how they are viewed. The modeling structure method of the system was performed following the concept of assigning bars, using the computer program of calculations SAP2000. Initially will be presented a theoretical part, furthermore a case study to illustrate the sizing of the walls using EXCEL tables programmed with calculation routine. The results will be presented in calculated efforts by the program for further analysis. Finally, will be highlighted important items of modeling and interpretation of the results