39 resultados para Administração do tempo
em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"
Resumo:
Recent searches suggest that social skills and time management as control variables of stress. In order to analyze possible relations between these variables and stress, it was done a descriptive study with a sample of convenience. Eighty three freshmen students, both of gender, of Biology, Civil Engineering and Psychology answered the Stress Inventory (ISSL), Social Skills Inventory (IHS) and a Time Management Inventory adaptation (ADT). It is emphasized that methodology of adaptation, the pro rata system, was not based on high standards of psychometry, which can lead to change of configuration of the instrument and the data it provides. The most of participants were unde rthe media in Social Skills and 72,29% manage badly the time. The stress rate was 48,19%. It was found connection between bad time management and stress and the lack of social skills was associated to bad time management. There wasn't statistic connection between stress and social skills lack. Students in Civil Engineering had the smaller stress rate, as well as the bigger lack of a Social Skills category.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
In the current decade, inter modal transport is widely discussed. In Brazil road transport is used in excess whereas there could be more focus and investment towards water transport. Water transport presents many benefits like being low cost and low maintenance. Sea and river ports today aren't capable of supporting Brazil's transport needs. Therefore, with this obstacle, this paper consists of an attempt of modeling and simulation of the process of unloading grain cargo from trucks, through simulation with ProModel software, to verify the necessity of installing more tumblers at the cargo unloading station in Porto Murtinho, MS
Resumo:
L'un des facteurs nécessaires pour qu’une entreprise reste compétitive sur le marché est la création ou l'amélioration d'un produit afin qu’il réponde aux besoins et aux attentes des clients, ainsi, le Processus de Développement de Produits (PDP) est essentiel. Pour la réussite du PDP, il est souhaitable de suivre un système standard de gestion de projet. L'objectif de cette étude est d'analyser la gestion de projets dans le processus de développement de produits dans l'industrie automobile afin d'identifier les possibilités d’amélioration. Par conséquent, nous avons procédé à une revue de littérature sur le sujet, analysé les lignes directrices et les pratiques du processus de développement de produit dans l’entreprise. Comme résultat, il a été obtenu que le système de développement de produits créé par l’entreprise requiert la clarification des outils utiles à la gestion de projet. Un problème de communication et de gestion des coûts a également été constaté dans le domaine du développement du moteur lourd
Resumo:
The cosmetic industry has presenting growth in Brazil and one way to support this demand is improving production and reducing waste. Wastes can be related to setup time, which is spent to support demand of product´s mix and volume. One of the methodologies used to reduce setup time is SMED (Single Minute Exchange of Die). This paper aims to describe and analyze the setup process in a production line in a cosmetic industrial branch, before and after the application of SMED methodology, highlighting good practices and difficulties in order to help other companies develop fast setup. The research method used was the case study. From the analysis of the implementation of the methodology on the company which is object from the case study was possible to summarize good practices, such as: the use of pillar E&T to store information about the training on the SMED methodology; creation of a multifunctional teamwork and involving different areas; creation of a “From-To” matrix. Difficulties were identified, such as: high and constant turnover of people who work on the shop floor; lack of discipline in filling the forms and by doing the setup activities that were standardized; lack of financial resources; lack of people´s availability in orer to conduct necessary meetings and trainings. Recommendations for other companies have also been proposed, such as: training of the team involved, before starting the project and a refresher training; standardization of training, forms and documentation of all steps of the project; create a multifunctional team; training after an employee, who is responsible for the setup, leaves the company
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Educação - FFC
Resumo:
OBJETIVOS: Este estudo teve por objetivo avaliar a eficácia da efedrina na prevenção dos efeitos hemodinâmicos induzidos pela associação do propofol e do remifentanil, assim como os efeitos sobre o tempo de latência do cisatracúrio. MÉTODOS: Sessenta pacientes com idade entre 18 e 52 anos, estado físico ASA I ou II, foram divididos em três grupos, aleatoriamente: G I - propofol 1%; G II - propofol 1% + efedrina 0,5 mg.ml-1 e G III - propofol 1% + efedrina 1,0 mg.ml-1 (velocidade de infusão igual a 180 ml.h-1), até a perda da consciência. Administrou-se remifentanil (0,5 mg.kg-1.min-1) e cisatracúrio na dose de 0,15 mg.kg-1. Foram registrados os dados demográficos, os sinais vitais (PAS, PAM, PAD, FC e SpO2) e o tempo de latência do cisatracúrio. RESULTADOS: Os grupos foram homogêneos com relação aos dados demográficos. Houve diminuição estatisticamente significativa dos valores de PAS, PAM, PAD e FC, um e três minutos após a administração do propofol, porém sem significado clínico importante e sem diferença entre os grupos. As medianas para os tempos de latência do cisatracúrio foram: 178 s (G2 e G3) e 183 s (G1), mas sem diferença significante entre os grupos. CONCLUSÃO: Não houve diminuição clinicamente importante dos parâmetros hemodinâmicos avaliados nos grupos que receberam ou não a efedrina e o tempo de latência do cisatracúrio foi o mesmo para os diferentes grupos.
Resumo:
O texto analisa a ordenação do tempo nas escolas primárias paulistas no final do século XIX e início do século XX, período em que se institui e se consolida a arquitetura temporal escolar. Compreende, pois, as primeiras prescrições detalhadas sobre o tempo constantes na reforma republicana da instrução pública de 1892, as regulamentações instituídas no decorrer da Primeira República, até o momento de criação do Código de Educação de São Paulo em 1933, quando se inaugura uma nova fase da instrução pública no estado. O texto busca mostrar como o tempo constitui uma ordem que se experimenta e se aprende na escola. Para a realização deste estudo foram utilizadas fontes documentais, especialmente a legislação e textos oficiais da administração do ensino. As análises incidem sobre dois aspectos: a formulação política do tempo escolar e a organização pedagógica e disciplinar do tempo na escola. em relação ao primeiro aspecto, mostra como a ordenação do tempo pautou-se pela aspiração de uniformização e controle. Nesse sentido, as autoridades do ensino público procuraram regulamentar a obrigatoriedade do ensino, a freqüência, a duração do curso primário e a jornada escolar. em relação à organização pedagógica e disciplinar do tempo, põe em destaque a ordenação minuciosa do emprego do tempo compreendendo a racionalização curricular - a seleção e distribuição do conhecimento por séries, aulas, lições, e a definição dos horários.
Resumo:
Pós-graduação em Biologia Geral e Aplicada - IBB
Resumo:
Pós-graduação em Pesquisa e Desenvolvimento (Biotecnologia Médica) - FMB
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)