60 resultados para AHP
em Repositório Institucional UNESP - Universidade Estadual Paulista "Julio de Mesquita Filho"
Resumo:
Digital factory is a concept that offers a collaborative approach to enhance product and production engineering processes through simulation. Products, processes and resources are modeled to be used to develop and test the product conception and manufacturing processes, before their use in the real factory. The purpose of this paper is to present the steps to identify the Critical Success Factors (CSF) priorities in a digital factory project implementation in a Brazilian company and how the Delphi and AHP Methods are aiding to identify these CSF priorities. Copyright © 2008 SAE International.
Resumo:
The paper analyses the application of the AHP method together with the attach A of ISO 9004:2000 in order to evaluate the performance of two industrial organizations, both possessing quality management systems with ISO 9001:2000 certifications, based on the specific requirements of quality, environment, occupational health and management systems. The evaluated organizations were a government-owned company from the science and technology sector that works in the nuclear area, and a private company that works in the automotive and railroad area. The open software Web-Hipre version 1.22 from Helsinki University of Technology, Finland, was used. The results demonstrated that the AHP method together with the attach A of ISO 9004:2000 is adequate to evaluate organizational performances. Both organizations presented similar performance levels.
Resumo:
Municipal Plans of Risk Reducing (PMRR's) were produced in settlements in the municipalities of Itapecerica da Serra (SP) and Suzano (SP), covering areas at risk of landslides and washouts of banks of streams. The development of PMRR's provided the delimitation of areas of risk, the indication of intervention works in order to eliminate and / or reduce risks, and consequently an indication of the areas and priority sectors for implementation of intervention works. The prioritization of areas and sectors that should receive the works of reducing or eliminating risk was performed by an expert involved in risk mapping. Despite the specialist's judgment exercise caution, the decision regarding the priority sites for implementation of alternative interventions is subjective. Since there is no way to eliminate this subjectivity, the use of decision-making techniques is important to evaluate whether the expert's reasoning is consistent. One of the first techniques developed for multiple criteria is the AHP (Analytic Hierarchy Process). This paper describes the results of a research carried out in order to assess whether the use of Analytic Hierarchy Process contributes to the results of the indication of the areas and priority sectors for implementation of interventions can be considered more consistent than in situations where the priority occurs without the use of decision making techniques. Results were compared between the prioritization of interventions for implementation contained in PMRR's of Itapecerica da Serra and Suzano and those obtained from the use of Analytic Hierarchy Process (AHP). It was concluded that such techniques permits an evaluation of the expert's judgment is logically coherent, thus contributing to produce results more technically based.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Customer focus , high competitiveness and striving for excellence in quality of service are some of the main features of the current market . Planned and make decisions with greater certainty is no longer an option a few years . The current managers are seeking ways to eliminate waste and increase financial and productive profitability of your company in order to achieve higher performance at a lower cost . The AHP is one of the main concepts of this goal by providing an analysis on multiple criteria , enhancing decision-making and enhancing the gains , with a technique that is designed to take into account all the key criteria for choosing an alternative , according to the perspective of the designer as both suppliers and customers . Emerging as a new way to minimize errors , and make an informed and consistent decision. The use of this method in construction projects is a recent phenomenon , which has much to be explored , an intense analysis of the processes is required to enable it to consider the concepts and present a consistent and grounded proposal
Resumo:
Among the flow, the flows have the highest destructive potential, may cause disasters with a very high number of victims, as recorded in the events Caraguatatuba (SP) and the Serra das Araras (RJ) in 1967; Valeu do Rio Figueira, in Timbé do Sul (SC) between 1995 and 1996; Vale do Itajaí in Santa Catarina, in 2008, Teresópolis, Petrópolis and Nova Friburgo (RJ), in December 2010 and January 2011. This project aimed to prioritize the main determinants of inducing processes of debris flows by applying the method of decision making AHP (Analytical Hierarch Process). Therefore, the following stages of work were defined: research of the major factors of debris flows, questionnaire design method for application of AHP expert on the subject, analysis of the results obtained from calculating the ratio of consistency and preparation of proposal for hierarchical of conditions for debris flows. From the surveys it was possible to establish a relationship of conditions according to the scale of work, defining three levels: regional (1:250,000 to 1:100,000), Semi-Detail (1:50,000 to 1:25,000) and Detail (1: 10,000 or higher). The factors found were: concentration time, the flood wave, rain, landslide susceptibility (slope), drainage and development in the deposition. The project analyzed the results obtained from the questionnaires, which allowed the ranking of the constraints, contributing to weight constraints in studies of multicriteria mapping of susceptibility to the occurrence of debris flows. The study showed that the most of the analyzed datas were inconsistent because of the different opinion of the judges
Resumo:
Wind power is a type of energy that is still not too explored in Brazil and, because of the lack of experience in projects of this size, there are still some problems during the stages of planning and execution of wind farms projects. One of these problems is related with the parts’ transportation logistics, since these parts are difficult to transport, because of their length, weight or shape. Furthermore, another aggravating factor is the lack of options regarding to the transportation modals that are available to do the route between the manufacture place and the project site. To help in the decision-making process about the ideal transportation configuration, aiming to reduce the dependence of the logistics’ coordinator, it was chosen to use he AHP method to compare some criteria that have influence in the modal’s choice process. The criteria, determined by the members of the company’s logistics’ department, are: transportation costs, transportation time and the risk of causing damages to the cargo. The results shown by this model, using theoretical background, that standardize the processes related to the modal’s choice
Resumo:
Este trabalho apresenta uma investigação sobre o emprego de FMEA (Failure Mode and Effect Analysis) de Processo com a exposição de irregularidades na sua utilização. O método AHP (Analytic Hierarchy Process) e os Conjuntos Fuzzy são aplicados no estudo das práticas atuais de utilização de FMEA. O AHP é aplicado para a priorização das irregularidades quanto à gravidade de sua ocorrência. Os Conjuntos Fuzzy são aplicados para avaliação do desempenho da utilização de FMEA em algumas empresas do ramo automotivo. Como resultado, tem-se a aceitação de oito e a não aceitação de três dos onze formulários de FMEA averiguados.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
This study discuss the use of the geotechnologies to aid the planners on the terrain aptness definition for highways implantation and on the different trace evaluation to the extention of the Governador Carvalho Pinto highway, between Taubaté-SP and Aparecida do Norte-SP. Fratures on the area were mapping using Landsat ETM+, band Pan. In order to elaborate the phisical aptness chart for highway implantation was used the Analitical Hierarchy Process (AHP) operation, in on geographical information system (GIS). Using GIS were realized a ponderate middle with the soils, rocks, relief, slope, fractures and land use/cover maps. Using this physical aptness chart and joinning it with urban and restrict areas (that was inserted by the Boolean operation), were obtained a viability chart for highway implantation. Based on it were proposed three aleatory traces for the Carvalho Pinto highway. This traces were evaluated with the cross tabulation operation. The integration of the restrict areas, land use and phisical aptness in digital media can offer for the planners the cartography of the viability for the highway implantation. The evaliation of these three traces, based on the viability chart, can subsidyse the decision by the planners.
Resumo:
Outsourcing is related to the action which an organization deals with its suppliers through a kind of business contract where a specific activity or service has been hired to be made. The outsourcing of some activities has become a common practice in the industry, nowadays. It reduces costs, significantly, in the production process and, at the same time, adds some values to the business organization. However it is necessary to measure the performance of these activities. Data Envelopment Analysis (DEA) is a non-parametric method useful to measure comparative performance. It has a wide range of applications measuring comparative efficiency. The Analytic Hierarchy Process (AHP) is a multiple criteria decision-making method that uses hierarchic structures to represent a decision problem and then develops priorities for the alternatives based on the decision-maker's judgments. This paper presents an integrated application based on DEA and AHP to evaluate the efficiency of subcontracted companies in a Brazilian aerospace factory. © 2007 Springer-Verlag London Limited.
Resumo:
This paper presents a proposal of a model to measure the efficiency of outsourced companies in the aeronautical industry applying the methods DEA and AHP. It also proposes an evaluation in the relation between the variables of the process and the value obtained for the effiiency. The criteria of Quality, Time and Cost were considered the outputs of the process, and those criteria were quantified by AHP for DEA matrix.The number of technical documents received by those outsorced companies were considered the input of the process. The other purpose is to separate the companies in groups considered able to receive an investment to improve their process. Copyright © 2008 SAE International.