133 resultados para Limited power supply
Resumo:
Purpose - This paper seeks to address the issue of persistent and widespread drought conditions during 2000 and 2001, which were the apparent cause of the decline of water levels in the reservoirs of Brazilian hydroelectric power plants. Design/methodology/approach - This issue is addressed here through a case study of the hydroclimatology of the Paraíba river basin, in Southeast Brazil, home to four large multi-purpose operational reservoirs. Findings - The data analysis shows that neither changes in the frequency nor magnitude of extreme hydrological events (droughts and floods) nor in annual rainfall amounts can be detected from the existing climate record. The explanation is consistent with the fact that the terrestrial water and energy cycles are tightly, and non-linearly, coupled through evapotranspiration. Research limitations/implications - Therefore small change in the seasonality of rainfall can have a significant impact on the basin's overall hydrologic regime, and thus on the availability of water resources. Originality/value - Often, adaptation and resilience to climate variability are discussed in the context of catastrophic events such as floods and droughts. This study suggests that a different type of impacts, those associated with subtle, yet persistent changes of seasonality in the terrestrial water cycle, cannot be ignored in studies of long-term sustainability of water resources. © Emerald Group Publishing Limited.
Resumo:
Purpose: This paper aims to perform an empirical investigation about the constructs and indicators of the supply chain management practices framework. Design/methodology/approach: The measuring framework proposed is based on a survey that was carried out on 107 Brazilian companies. Statistical techniques were employed to verify, validate, and test the reliability of the constructs and their indicators. To validate this framework principal component analysis and structural equation modeling techniques were used. Findings: In general, previous studies suggest six constructs for measuring the supply chain management practices framework. However, in this study a framework was achieved with four constructs of supply chain management practices, namely, supply chain (SC) integration for production planning and control (PPC) support, information sharing about products and targeting strategies, strategic relationship with customer and supplier, and support customer order. This framework has adequate levels of validity and reliability. Research limitations/implications: The main limitation of this study was that only a small sample of companies in a single sector and country were surveyed, and therefore there needs to be further research considering the special conditions in other countries. Originality/value: This study investigated statistically set indicators to discuss the topic supply chain management practices. The framework obtained has good quality of validity and reliability indicators. Thus, an alternative framework has been added to measure supply chain management practices, which is currently a popular topic in the supply chain mainstream literature. Both defined constructs and the validated indicators can be used in other studies on supply chain management. © Emerald Group Publishing Limited.
Resumo:
This paper proposes a new approach for optimal phasor measurement units placement for fault location on electric power distribution systems using Greedy Randomized Adaptive Search Procedure metaheuristic and Monte Carlo simulation. The optimized placement model herein proposed is a general methodology that can be used to place devices aiming to record the voltage sag magnitudes for any fault location algorithm that uses voltage information measured at a limited set of nodes along the feeder. An overhead, three-phase, three-wire, 13.8 kV, 134-node, real-life feeder model is used to evaluate the algorithm. Tests show that the results of the fault location methodology were improved thanks to the new optimized allocation of the meters pinpointed using this methodology. © 2011 IEEE.
Resumo:
Problems as voltage increase at the end of a feeder, demand supply unbalance in a fault condition, power quality decline, increase of power losses, and reduction of reliability levels may occur if Distributed Generators (DGs) are not properly allocated. For this reason, researchers have been employed several solution techniques to solve the problem of optimal allocation of DGs. This work is focused on the ancillary service of reactive power support provided by DGs. The main objective is to price this service by determining the costs in which a DG incurs when it loses sales opportunity of active power, i.e, by determining the Loss of Opportunity Costs (LOC). The LOC will be determined for different allocation alternatives of DGs as a result of a multi-objective optimization process, aiming the minimization of losses in the lines of the system and costs of active power generation from DGs, and the maximization of the static voltage stability margin of the system. The effectiveness of the proposed methodology in improving the goals outlined was demonstrated using the IEEE 34 bus distribution test feeder with two DGs cosidered to be allocated. © 2011 IEEE.
Resumo:
This study on the factors affecting the adoption of supply chain management (SCM) practices develops four hypotheses based on a literature review, and tests them using survey data of Brazilian electro-electronic firms. The results reveal the big picture of the SCM practices in the sector and suggest that contextual factors such as size, position and bargaining power affect the adoption of SCM practices, which are also more customer oriented. Sector characteristics are very important in analysing SCM practices. Contrary to the findings of literature, the relationship between competitive priorities and SCM practices was not supported statistically. © 2011.
Resumo:
This paper proposes a set of performance factors for load characterization and revenue metering. They are based on the Conservative Power Theory, and each of them relates to a specific load non-ideality (unbalance, reactivity, distortion). The performance factors are capable to characterize the load under different operating conditions, considering also the effect of non-negligible line impedances and supply voltage deterioration. © 2012 IEEE.
Resumo:
The capacitated redistricting problem (CRP) has the objective to redefine, under a given criterion, an initial set of districts of an urban area represented by a geographic network. Each node in the network has different types of demands and each district has a limited capacity. Real-world applications consider more than one criteria in the design of the districts, leading to a multicriteria CRP (MCRP). Examples are found in political districting, sales design, street sweeping, garbage collection and mail delivery. This work addresses the MCRP applied to power meter reading and two criteria are considered: compactness and homogeneity of districts. The proposed solution framework is based on a greedy randomized adaptive search procedure and multicriteria scalarization techniques to approximate the Pareto frontier. The computational experiments show the effectiveness of the method for a set of randomly generated networks and for a real-world network extracted from the city of São Paulo. © 2013 Elsevier Ltd.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
The resistive-type superconducting fault current limiters (RSFCL) prototypes using YBCO-coated conductors have shown current limitation for medium voltage class applications for acting time up to 80 ms. By connecting an air-core reactor in parallel with the RSFCL, thus making an hybrid current limiter, one can extend the acting time for up to 1 s. In this work, we report the performance of a hybrid current limiter subjected to an AC peak fault current of 2 kA during 1 s for which within the first 80 ms the SFCL limits the current concurrently with the air-core reactor, and for the remaining 920 ms, only the air-core reactor limits the current. In order to evaluate the actual conditions for subsequent reconnection of RSFCL to the power grid, the hybrid fault current limiter was tested varying the time interval for recovery from 900 ms and 1.2 s, followed again by the concurrent operation of the hybrid limiter during 1 s (SFCL during 80 ms). From this evaluation test, the recovery time can be measured and compared using the voltage peak generated in superconducting module from the first and second fault test. The recovery time was also determined through the pulsed current method (PCM) on short-length sample test. The results showed that the fault current was limited from 1.9 kA down to 514 A after 1 cycle of 60 Hz frequency, with recovery time lower than 1.2 s for two subsequent fault current tests.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Linear resonant harvesters have been the most common type of generators used to scavenge energy from mechanical vibrations. When subject to harmonic excitation, good performance is achieved once the device is tuned so that its natural frequency coincides with the excitation frequency. In such a situation, the average power harvested in a cycle is proportional to the cube of the excitation frequency and inversely proportional to the suspension damping, which is sought to be very low. However, a very low damping involves a relatively long transient in the system response, where the classical formulation adopted for steady-state regimes do not hold. This paper presents an investigation into the design of a linear resonant harvester to scavenge energy from time-limited harmonic excitations involving a transient response, which could be more likely in some practical situations. An application is presented considering train-induced vibrations.
Resumo:
Tendinous lesions are very common in athlete horses. The process of tendon healing is slow and the quality of the new tissue is often inferior to the original, leading in many cases to recurrence of the lesion. One of the main reasons for the limited healing capacity of tendons is its poor vascularization. At present, cell therapy is used in equine practice for the treatment of several disorders including tendinitis, desmitis and joint disease. However, there is little information regarding the mechanisms of action of these cells during tissue repair. It is known that Mesenchymal Stem Cells (MSCs) release several growth factors at the site of implantation, some of which promote angiogenesis. Comparison of blood flow using power Doppler ultrasonography was performed after the induction superficial digital flexor tendon tendinitis and implantation of adipose tissue-derived MSCs in order to analyze the effect of cell therapy on tendon neovascularization. For quantification of blood vessel histopathological examinations were conducted. Increased blood flow and number of vessels was observed in treated tendons up to 30 days after cell implantation, suggesting promotion of angiogenesis by the cell therapy.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)