91 resultados para community battery energy storage system optimization


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Due to the high value of the bill that the Brazilian has been paying, one of the most expensive in the world, is becoming increasingly attractive the option for renewable energy in form of distributed micro and minigeneration. In other words, the renewable energy sources are becoming attractive not only because of environmental concerns, but also due to economic issues. This has become even more relevant and concrete after approval of rules by National Agency of Electric Energy (ANEEL) on 4/17/2012 (Normative Resolution n ° 482/2012 of 04/17/2012) aimed at reducing barriers to installation of small distributed generation, including microgeneration, with up to 100 kW of power, and minigeneration, 100 kW to 1 MW. The Normative Resolution n ° 482/2012 creates the Energy Clearing System, which allows consumers to install small generators in its consumer unit and exchange energy with the local distributor. The rule applies to generators that use renewable sources of energy (hydro, solar, biomass, wind and cogeneration qualified). In this context, this paper presents a technical and economic analysis of installing a residential microgenerating plant composed of photovoltaic cells, solar panels and small wind turbines

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Increasingly the business for large companies tend to sustainable actions. Such actions may have motivated social, environmental and economical too. Thus, the study of small actions or investments aimed at improving a product or a process may impact on financial return and even the exposure of a sustainable paper company, a fact that is increasingly wel l regarded in the market. This study presents proposals raised in the market and in the literature showing the cost of each investment, the payback over time and the benefits of each project to be implemented in a corporative building located in the city of São Paulo. It was analyzed the energy consumption, determining the amount of consumption of each device through measurement of some parameters such as voltage and operating current, and lifting nominal values supplied by the manufacturers. By understanding the conditions of each equipment and the processes involved, were raised possible energy improvements, focusing on the cooling system of the building, the tariff system and the installation of an energy management system

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The energy is considered one of the most important elements in the human´s life providing the survival as well as the well being. Nowadays, the technologies destined to generate power burn fossil fuels which pour gases (carbon dioxide among them) that contribute to the global warming phenomenon. Several research groups and universities have been studying different methods for generating power with low carbon dioxide emissions, including the possibility of burning zero-carbon fuels. In this text, it has been put attention to the Advanced Zero Emission Power Plants (AZEP) which separate the CO2 (from the gases involved in the power generation), compress it, dehydrate it and store it in appropriate reservoirs. The goal of this study was to find a possible solution to produce CO from CO2, activated by solar energy; the reaction between CO and steam generates a syngas comprised of H2 and CO2, which can be separated by chemical and/or physical processes. The text also contains a study concerning the compressed air energy storage power plant (CAES) and come up with its modification to C[CO2]ES. This power plant stores CO2 directing it to a reverse combustion process to produce CO which is headed to a syngas reactor to produce CO2 and H2. Hydrogen is separated and carried to the thermal cycle to generate power with low carbon emissions

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Brazil has about 12 % of a life´s essential resource: the superficial fresh water of the planet. However, today it is possible to observe the bad management of this resource, generating serious consequences on the quality that results in the loss of the use´s availability. In this scenario, the catchment of rainwater for undrinkable use is an alternative that has been broadly studied for the scientific community. When planning a system of rainwater catchment, the sizing of the required volume of the tank that will keep the water has a fundamental importance for the project, seeing that the supersizing of the tank can bring high costs and the undersizing can bring shortage in the water supply. This paper used a methodology based on two concepts: the harvesting efficiencies and the attending efficiencies of the system. This method takes as principle that exist a perfect demand that minimize the repayment time, condition that happened when the efficiencies are equal. Brazilian’s cities with different weathers and different rainfalls where chosen to simulate the attending for different demands for a typical residence. The data where parameterized according to the roof area and the number of residents, that way is possible that a future conference can be easily done and it also ensure results closer to the reality. The results showed that cities with a lower period of drought, even those with high level of rainfall on the raining mouths, have lower potential of water supply. The cities where the rainfall is more constant and also more high, even small roofs areas and small tank´s volumes – about half of the size compare to the cities with less propitious conditions – can generate high levels of water saving. With an eye to promote the environmental sustainability, the investment on projects for the catchment of rainwater is a good alternative

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Due to the high value of the bill that the Brazilian has been paying, one of the most expensive in the world, is becoming increasingly attractive the option for renewable energy in form of distributed micro and minigeneration. In other words, the renewable energy sources are becoming attractive not only because of environmental concerns, but also due to economic issues. This has become even more relevant and concrete after approval of rules by National Agency of Electric Energy (ANEEL) on 4/17/2012 (Normative Resolution n ° 482/2012 of 04/17/2012) aimed at reducing barriers to installation of small distributed generation, including microgeneration, with up to 100 kW of power, and minigeneration, 100 kW to 1 MW. The Normative Resolution n ° 482/2012 creates the Energy Clearing System, which allows consumers to install small generators in its consumer unit and exchange energy with the local distributor. The rule applies to generators that use renewable sources of energy (hydro, solar, biomass, wind and cogeneration qualified). In this context, this paper presents a technical and economic analysis of installing a residential microgenerating plant composed of photovoltaic cells, solar panels and small wind turbines

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper is proposed the usage of an Organic Rankine Cycle (ORC) along with waste heat recovery from an inconstant heat source. This method of waste heat recovery with intermittent heat source is part of a technical viability study. This paper also brings up the usage of thermal energy storage as heat source for the ORC. This paper is based on a heat treatment company study in which a natural gas furnace is explored. Data such as mass flow, temperature and specific waste gas heat from this furnace are used through calculations. Calculations are made also based on furnace cycles. This viability study considers a series of working fluids such as ammonia, benzene, R113 and R134a. Results point out that ORC with out thermal storage and using refrigerant fluid ammonia is the best alternative

Relevância:

100.00% 100.00%

Publicador:

Resumo:

How companies can sell their surplus production capacity of electric power in Brazil? This work was developed from the question presented and focusing on clarification of procedures to enter the Brazilian electricity market by providing basic guidelines based on resolutions by National Agency of Electric Energy, National System Operator procedures and rules of the Assembly of Electric Energy Commercialization. It features subsidy to companies that fit this profile to evaluate the possibility to sell their surplus electricity. The general aim was to analyze the procedures and the necessary steps to make this sale happen. Was developed through a literature review where an overview of the Brazilian electric sector and a case study of a company that has excess capacity of electricity, but doesn’t make its marketing. Resulted in the expected clarification as well as the incentive for companies through the information presented, the entry in this trade since power is still crucial to the country's economic growth and ensure its availability in quantity demanded is a challenge of the utmost importance for satisfactory results are achieved economic development contributing to the progress of our society

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Cogeneration system design deals with several parameters in the synthesis phase, where not only a thermal cycle must be indicated but the general arrangement, type, capacity and number of machines need to be defined. This problem is not trivial because many parameters are considered as goals in the project. An optimization technique that considers costs and revenues, reliability, pollutant emissions and exergetic efficiency as goals to be reached in the synthesis phase of a cogeneration system design process is presented. A discussion of appropriated values and the results for a pulp and paper plant integration to a cogeneration system are shown in order to illustrate the proposed methodology.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Goal Programming (GP) is an important analytical approach devised to solve many realworld problems. The first GP model is known as Weighted Goal Programming (WGP). However, Multi-Choice Aspirations Level (MCAL) problems cannot be solved by current GP techniques. In this paper, we propose a Multi-Choice Mixed Integer Goal Programming model (MCMI-GP) for the aggregate production planning of a Brazilian sugar and ethanol milling company. The MC-MIGP model was based on traditional selection and process methods for the design of lots, representing the production system of sugar, alcohol, molasses and derivatives. The research covers decisions on the agricultural and cutting stages, sugarcane loading and transportation by suppliers and, especially, energy cogeneration decisions; that is, the choice of production process, including storage stages and distribution. The MCMIGP allows decision-makers to set multiple aspiration levels for their problems in which the more/higher, the better and the less/lower, the better in the aspiration levels are addressed. An application of the proposed model for real problems in a Brazilian sugar and ethanol mill was conducted; producing interesting results that are herein reported and commented upon. Also, it was made a comparison between MCMI GP and WGP models using these real cases. © 2013 Elsevier Inc.