165 resultados para Sistema de gestão da segurança alimentar


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Medicina Veterinária - FMVZ

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Agronomia (Horticultura) - FCA

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia de Produção - FEB

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The implantation of environmental management systens (SGA) in companies is the first step to the company conquers the environmental certification and consequently the benefits of a sustainable production of products, services and activities can bring. However, in the way as they are proposals in bibliographies the implantation of the SGAs, does not identify the definition of the operational stages of implementation of the same ones, generating doubts on the real environmental and administrative performance that they can come to generate for the organization. In this direction, the present research brings a proposal of operational systematics for implantation of SGA in companies, detailing each stage of implantation, considering its particularitities. For in such a way, a revision of norm NBR ISO 14001:2004 was made, looking for to identify to the interpretation imperfections gifts in the normative system. Moreover, other methods of SGA implantation had been searched gifts in the bibliography, searching proposals that detailed the operational aspects of the implantation of the system. In the same way, the accomplishment of a period of training supervised in the first semester of 2007 made possible the practical experience of the functioning of a system of environmental management, beyond the contact with professionals of the area and the acquisition of documents that had helped in the development of the research. The result was the attainment of a detailed procedure more, defining the operational systematic of SGA implantation, beyond the generation of a flowchart, describing as to develop each stage. This detailing certainly will facilitate the implantation of a SGA in companies interested in improving its environmental performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A avaliação de impacto ambiental tem sido muitas vezes, vista apenas como um procedimento burocrático para a obtenção da licença ambiental, desconsiderando os estudos realizados, após a aquisição da licença e contratando outros serviços para orientar a adoção de um sistema de gestão objetivando boas práticas ambientais. Porém sabe-se que a estrutura geral das metodologias de avaliação de impacto ambiental apresenta muitos pontos semelhantes se comparada à identificação dos aspectos e impactos ambientais de um sistema de gestão ambiental, o que indica uma interface entre os dois instrumentos apesar da execução integrada ainda não ser um procedimento comum na gestão ambiental de empreendimentos. Nesse sentido, o presente trabalho objetivou analisar as possibilidades do emprego de um sistema de gestão ambiental preconizado pela ISQ 14001 para o gerenciamento de programas ambientais decorrentes de processos de avaliação de impacto ambiental e de licenciamento ambiental de usinas hidrelétricas, através do foco específico naqueles progrmas relacionados diretamente com o monitoramento e o controle da qualidade e da qualidade da água do reservatório, que é um fator essencial para a função de produção de um empreendimento hidrelétrico. Para esta análise, utilizou-se o caso da usina hidrelétrica de Santo Antônio, identificando 9 programas ambientais decorrentes de processos de avaliação de impacto ambiental com grandes possibilidades de serem utilizados na estruturação de sistemas de gestão ambiental de usinas hidrelétricas e cuja adequada execução, corrobora com a integração entre os respectivos instrumentos além de corresponder à necessidade de compatibilização dos instrumentos de política ambiental na busca de um desenvolvimento com adequada proteção ambiental e de uma atuação mais consciente das organizações

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study addresses the application of the Environmental Management System in chicken production on a farm owned by the Nardo brothers, located in the city of Guapiaçu/SP (Brazil). The objectives were to analyze the process of solid waste generation, destination and forms of treatment in this activity; propose measures to reduce the use of potable water for non-potable ends; determine other measures identified through a questionnaire drafted by Embrapa (Brazilian Agriculture Research Cooperative) and administered to employees who have direct involvement in the productive process; pay visits to chicken production enterprises; and employ the guidelines proposed by the National Fowl-Breeding Sanitation Program that guide the application of the Environmental Management System. Adequate management of waste was put into effect through the construction of a compost shed capable of meeting current production demands, in which all procedures were accompanied – from civil construction to the commercialization process of the organic fertilizer generated. The rain-gathering system for the roofs of the pens proposed to reduce the consumption of potable ground water destined for washing the floors of the pens was completely dimensioned and budgeted, allowing the motivated owners to place the project into effect in a timely fashion. Other simpler but no less important proposals were also made in order to bring the production up to the required quality standards.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Taking as starting the environmental, social and economic impact of construction and demolition waste in Brazilian cities were created legal mechanisms for management and administration, seeking to minimize the impacts to the maximum, since the irregular deposition can be characterized as environmental crime. CONAMA Resolution No. 307 of 2002 establishing the mandatory implementation of an Integrated Management System Construction Waste and Demolition, guiding the classification and designation of the waste generating agents, collection agents and transporters, and the areas of culling and disposal of waste. The technical partnership between the Ministry of Cities, the Environment Ministry and the Caixa Econômica Federal, coordinated by Pinto & Gonzales (2005) Management in the work and management of construction waste, proposed a guidance manual to guide the implementation of a System Integrated Management of Construction Waste in Municipalities. The municipality of Guanambi in the state of Bahia, in full economic rise, lacks a waste management of construction and demolition, since there has areas for the disposal of waste being proposed in this paper the diagnosis of waste generation in the municipality as part of the methodology proposed by the work of Pinto & Gonzales (2005).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The use of environmental management systems - EMS has shown to be a key tool for addressing the environmental aspects and impacts of an organization. The vast majority of EMS based on the requirements of ISO 14001:2004, as it is a globally recognized standard and adopt its recommendations is considered to be a guarantee of fulfilling the basic requirements of an EMS. Despite all the benefits that the system provides, we still find many problems in the implementation of EMS, especially in small and medium enterprises or SME. Most of the difficulties of implementation is related to intrinsic factors that companies of this size have, and issues related to the models and methods used to implement an EMS. Thus, this work aimed to assess whether the guidelines of ISO 14005:2012 meet the needs of SMEs for the effective implementation of an environmental management system. For it has been identified in the relation between SMEs and EMS the majof intrinsic problems of SMEs to implement (PII), such as lack of financial and human resources, and lack of commitment from top management to the SGA. Also was also pointed the main implementation issues related to ISO 14001 (ABNT, 2004) or the models or methods (PIM), highlighting the lack of environmental performance criteria, and the need for a path or sequence of steps for implementation. The study of ISO 14005 (ABNT, 2012) showed that the standard guidelines and implementation examples proposed, include solutions for all problems related to EMS implementation SMEs

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Always seeking the maximum profit under the reduced production time and lower number of failures, companies are increasingly evolving and going after continuous improvement in order to remain competitive in the market. Thus, increasingly there is investment in the management system Lean manufacturing. Lean system is very important, because through it, the maximum value is added in the final product. Being measured by the efficiency and reducing failures to zero. In the studied company, Lean manufacturing system came into effect through the kanban system for purchasing, control and distribution of bulk material used in the assembly of the final product, which are earth-moving machines. It is very important to check the great change made in the company with the implementation of kanban. All inventory management becomes visual, elements are arranged in an organized manner, with addresses in structures, calculated in special boxes and finally, assemblers have the guarantee of an item supply, with the distribution cars located on their assembly area. This study participates effectively assuring the supply. Avoiding any failure on the lack of material, non-compliance of delivery times to the customer and maintenance of over-stock or obsolete inventory, in which case both cause financial loss to the company

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper addresses the difficulties and best practices of a quality system of an automotive parts company. In it will be discussed the features and benefits of the proper use of a system of management and quality assurance. It emphasizes the proper use of tools and methodologies that aim improving the quality of processes and products. It also has some guidance information given by the standards of quality which helps the implementation of the quality system and the standards are important because it attests to the quality of companies. So, this work has as objective to guide the creation and management of the quality system in auto parts companies, which seek an increase in the quality of products and processes, it also helps to certify companies in the current quality standard for the sector, ISO TS 16949, and thus increases the competitiveness of companies in this market. As result, this paper resumes good practices, difficulties and key steps for creating and managing a quality system

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Pesquisa e Desenvolvimento (Biotecnologia Médica) - FMB

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The management of solid waste has been a great challenge to public managers both because of its high operational costs and increasing waste generation. Besides environmental and public health harm, it involves high costs to be mitigated. It is necessary to seek solutions that focus on, amongst other matters, economic efficiency for a healthy environment. This could be reached with sustainable development, which has proven itself as an alternative model of development to the actual one in place. In order to ensure that sustentability is the goal of an activity, it is necessary to establish goals and to evaluate a system in order to track opportunities and correct possible mistakes, that is, it is necessary to elaborate a Waste Management Plan. However, in order to establish goals, it is also necessary a good description of the management of solid waste, thus diagnosis is a core aspect in the building of an specific law, as it will allow for the knowledge of the actual status of solid waste collection in Osasco town, showing what progress has been made in recent years, identifying current problems and generating the foundations to build future perspectives in the area. The present work has seeked to elaborate a diagnosis on waste management in Osasco municipality, presenting places for consultation and analysing how it meets the current legislation in place, enabling it to serve as a model for the elaboration of other diagnosis in other Brazilian municipalities

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We interviewed 21 farmers in order to access which sanitary practices adopted in the production systems of beef cattle on farms located in São Paulo, Mato Grosso, Mato Grosso do Sul and Rondonia. The survey was conducted through a qualitative approach to the collection of data obtained through questionnaire and personal interview with the landowners. We questioned the attitudes and sanitation procedures in these current production systems such as veterinary assistance, preventive health practices and disease surveillance, knowledge of health hazards for the safe production of food, animal feed, vaccine and immunizations, registration system, measures with newborns, products used in the environment and animals, grace period, employee training, destination of the dead animals, among others. Along with the data found that only 30% of properties had veterinary care, 67% said they meet the expiration dates of the products, although it was not mentioned on the products if there were any. In only 48% of properties were veterinarians who prescribed drugs to animals. Only two of the owners confirmed buying and using expired products in animals and only 48% have received some training on the property. In this setting, it is evident that farmers should be better prepared for insertion of its products in a highly demanding and competitive market. In this context, add value to the product depends mainly on the condition of sanitation of the herds.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Direito - FCHS