104 resultados para Enrico Fermi Atomic Power Plant.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Serviço Social - FCHS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Geografia - FCT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEG

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEG

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The availability of the electrical energy, in sufficient quantities and in competitive prices is a crucial factor to the economic development. The trade-in of the excess electrical energy produced in a system of cogeneration can be seen as an alternative to the creation of an additional source of revenues for ethanol power plants sector, besides contributing to the complementation of the Brazilian electrical headquarter with renewable sources. The objective of this study was to evaluate the economic feasibility of the implementation of a cogeneration electrical central using the excess of sugar cane bagasse and selling the excess of electrical energy with prices of the market. An ethanol power plant located in the state of Sao Paulo was used to this study. It was used the case study methodology, evaluating the potential of the investment under the viewpoint of the Net Present Value (NPV), Payback and Internal Rate of Return (IRR), and complementing the results of the Accounting Results (AC). It was created three alternative scenarios to reflect the level of the risk of every studied situation: the most likely, an optimistic and a pessimistic, each one with its assumptions. The Monte Carlo Simulations was used to insert the elements of risk to each scenario. The results showed that the project is feasible in all NPV scenarios. And the Payback and IRR analysis confirmed these evidences. The valuation with the AR showed that the project is most risky at the pessimistic scenario, but is feasibly in the most likely and the optimistic scenarios. It was concluded that the project is economic viable. However, the economic viability shown in the results is based on the maintenance of the future prices on the levels of the historical prices used in the analysis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this work, experimental results are reported for a small scale cogeneration plant for power and refrigeration purposes. The plant includes a natural gas microturbine and an ammonia/water absorption chiller fired by steam. The system was tested under different turbine loads, steam pressures and chiller outlet temperatures. An evaluation based on the 1st and 2nd Laws of Thermodynamics was also performed. For the ambient temperature around 24°C and microturbine at full load, the plant is able to provide 19 kW of saturated steam at 5.3 bar (161 °C), corresponding to 9.2 kW of refrigeration at -5 °C (COP = 0.44). From a 2nd law point-of-view, it was found that there is an optimal chiller outlet temperature that maximizes the chiller exergetic efficiency. As expected, the microturbine presented the highest irreversibilities, followed by the absorption chiller and the HRSG. In order to reduce the plant exergy destruction, it is recommended a new design for the HRSG and a new insulation for the exhaust pipe. © 2013 Elsevier Ltd. All rights reserved.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The wavelength-integrated absorbance (WIA) and summation of absorbance (∑ lines) of different lines were evaluated to enhance sensitivity and determine B, P and S in medicinal plants by HR-CS FAAS. The lowest LOD for B (0.5mgL-1) and P (13.7mgL-1) was obtained by integration of lines 249.773nm (3pixels) and 247.620nm (5pixels), respectively. The ∑ lines for CS at 257.595nm and 257.958nm furnished LOD=30.5mgL-1, ca. 10% lower than the LOD obtained for the WIA using 257.595nm and 5pixels. Data showed the advantage of WIA over ∑ lines to improve sensitivity for all analytes. Under optimized conditions, calibration curves in the 1.0-100mgL-1 B and 50.0-2000mgL-1 P, S ranges were consistently obtained. Results obtained with the HR-CS FAAS method were in agreement at 98% and 95% confidence level with certified values for B and P, respectively. And results for S were in accordance to non-certified values. Concentrations of B, P, and S in 12 medicinal plants analyzed by the proposed method varied within the 19.4-34.5mgkg-1 B, 719-3910mgkg-1 P and 1469-7653mgkg-1 S ranges. © 2012 Elsevier B.V.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, a thermoeconomic functional analysis method based on the Second Law of Thermodynamics and applied to analyze four cogeneration systems is presented. The objective of the developed technique is to minimize the operating costs of the cogeneration plant, namely exergetic production cost (EPC), assuming fixed rates of electricity production and process steam in exergy base. In this study a comparison is made between the same four configurations of part I. The cogeneration system consisting of a gas turbine with a heat recovery steam generator, without supplementary firing, has the lowest EPC. (C) 2004 Published by Elsevier Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The distribution of natural gas is carried out by means of long ducts and intermediate compression stations to compensate the pressure drops due to friction. The natural gas compressors are usually driven by an electric motor or a gas turbine system, offering possibilities for energy management, one of these consisting in generating energy for use in-plant or to commercialize as independent power producer. It can be done by matching the natural gas demand, at the minimum pressure allowed in the reception point, and the storage capacity of the feed duct with the maximum compressor capacity, for storing the natural gas at the maximum permitted pressure. This allows the gas turbine to drive an electric generator during the time in which the decreasing pressure in duct is above the minimum acceptable by the sink unit. In this paper, a line-pack management analysis is done for an existing compression station considering its actual demand curve for determining the economic feasibility of maintaining the gas turbine system driver generating electricity in a peak and off-peak tariff structure. The potential of cost reduction from the point of view of energy resources (natural gas and electric costs) is also analyzed. (C) 2010 Elsevier Ltd. All rights reserved.