67 resultados para parallel scheduling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes a tabu search approach to solve the Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem (SITLSP). It is a real-world problem, often found in soft drink companies, where the production process has two integrated levels with decisions concerning raw material storage and soft drink bottling. Lot sizing and scheduling of raw materials in tanks and products in bottling lines must be simultaneously determined. Real data provided by a soft drink company is used to make comparisons with a previous genetic algorithm. Computational results have demonstrated that tabu search outperformed genetic algorithm in all instances. Copyright 2011 ACM.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Software Transactional Memory (STM) systems have poor performance under high contention scenarios. Since many transactions compete for the same data, most of them are aborted, wasting processor runtime. Contention management policies are typically used to avoid that, but they are passive approaches as they wait for an abort to happen so they can take action. More proactive approaches have emerged, trying to predict when a transaction is likely to abort so its execution can be delayed. Such techniques are limited, as they do not replace the doomed transaction by another or, when they do, they rely on the operating system for that, having little or no control on which transaction should run. In this paper we propose LUTS, a Lightweight User-Level Transaction Scheduler, which is based on an execution context record mechanism. Unlike other techniques, LUTS provides the means for selecting another transaction to run in parallel, thus improving system throughput. Moreover, it avoids most of the issues caused by pseudo parallelism, as it only launches as many system-level threads as the number of available processor cores. We discuss LUTS design and present three conflict-avoidance heuristics built around LUTS scheduling capabilities. Experimental results, conducted with STMBench7 and STAMP benchmark suites, show LUTS efficiency when running high contention applications and how conflict-avoidance heuristics can improve STM performance even more. In fact, our transaction scheduling techniques are capable of improving program performance even in overloaded scenarios. © 2011 Springer-Verlag.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we present a mixed integer model that integrates lot sizing and lot scheduling decisions for the production planning of a soft drink company. The main contribution of the paper is to present a model that differ from others in the literature for the constraints related to the scheduling decisions. The proposed strategy is compared to other strategies presented in the literature.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Increased accessibility to high-performance computing resources has created a demand for user support through performance evaluation tools like the iSPD (iconic Simulator for Parallel and Distributed systems), a simulator based on iconic modelling for distributed environments such as computer grids. It was developed to make it easier for general users to create their grid models, including allocation and scheduling algorithms. This paper describes how schedulers are managed by iSPD and how users can easily adopt the scheduling policy that improves the system being simulated. A thorough description of iSPD is given, detailing its scheduler manager. Some comparisons between iSPD and Simgrid simulations, including runs of the simulated environment in a real cluster, are also presented. © 2012 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The medium term hydropower scheduling (MTHS) problem involves an attempt to determine, for each time stage of the planning period, the amount of generation at each hydro plant which will maximize the expected future benefits throughout the planning period, while respecting plant operational constraints. Besides, it is important to emphasize that this decision-making has been done based mainly on inflow earliness knowledge. To perform the forecast of a determinate basin, it is possible to use some intelligent computational approaches. In this paper one considers the Dynamic Programming (DP) with the inflows given by their average values, thus turning the problem into a deterministic one which the solution can be obtained by deterministic DP (DDP). The performance of the DDP technique in the MTHS problem was assessed by simulation using the ensemble prediction models. Features and sensitivities of these models are discussed. © 2012 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper tackles a Nurse Scheduling Problem which consists of generating work schedules for a set of nurses while considering their shift preferences and other requirements. The objective is to maximize the satisfaction of nurses' preferences and minimize the violation of soft constraints. This paper presents a new deterministic heuristic algorithm, called MAPA (multi-assignment problem-based algorithm), which is based on successive resolutions of the assignment problem. The algorithm has two phases: a constructive phase and an improvement phase. The constructive phase builds a full schedule by solving successive assignment problems, one for each day in the planning period. The improvement phase uses a couple of procedures that re-solve assignment problems to produce a better schedule. Given the deterministic nature of this algorithm, the same schedule is obtained each time that the algorithm is applied to the same problem instance. The performance of MAPA is benchmarked against published results for almost 250,000 instances from the NSPLib dataset. In most cases, particularly on large instances of the problem, the results produced by MAPA are better when compared to best-known solutions from the literature. The experiments reported here also show that the MAPA algorithm finds more feasible solutions compared with other algorithms in the literature, which suggest that this proposed approach is effective and robust. © 2013 Springer Science+Business Media New York.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study was conducted to examine the relationship among average annual productivity of the cow (PRODAM), yearling weight (YW), postweaning BW gain (PWG), scrotal circumference (SC), and stayability in the herd for at least 6 yr (STAY) of Nelore and composite beef cattle. Measurements were taken on animals born between 1980 and 2010 on 70 farms located in 7 Brazilian states. Estimates of heritability and genetic and environmental correlations were obtained by Bayesian approach with 5-trait animal models. Genetic trends were estimated by regressing means of estimated breeding values by year of birth. The heritability estimates were between 0.14 and 0.47. Estimates of genetic correlation among female traits (PRODAM and STAY) and growth traits ranged from-0.02 to 0.30. Estimates of genetic correlations ranged from 0.23 to 0.94 among growth traits indicating that selection for these traits could be successful in tropical breeding programs. Genetic correlations among all traits were favorable and simultaneous selection for growth, productivity, and stayability is therefore possible. Genetic correlation between PRODAM and STAY was 0.99 and 0.85 for Nelore and composite cattle, respectively. Therefore, PRODAM and STAY might be influenced by many of the same genes. The inclusion of PRODAM instead of STAY as a selection criterion seems to be more advantageous for tropical breeding programs because the generation interval required to obtain accurate estimates of genetic merit for PRODAM is shorter. Average annual genetic changes were greater in Nelore than in composite cattle. This was not unexpected because the breeding program of composite cattle included a large number of farms, different production environments, and genetic level of the herds and breeds. Thus, the selection process has become more difficult in this population. © 2013 American Society of Animal Science. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In many production processes, a key material is prepared and then transformed into different final products. The lot sizing decisions concern not only the production of final products, but also that of material preparation in order to take account of their sequence-dependent setup costs and times. The amount of research in recent years indicates the relevance of this problem in various industrial settings. In this paper, facility location reformulation and strengthening constraints are newly applied to a previous lot-sizing model in order to improve solution quality and computing time. Three alternative metaheuristics are used to fix the setup variables, resulting in much improved performance over previous research, especially regarding the use of the metaheuristics for larger instances. © 2013 Elsevier Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Ciência da Computação - IBILCE

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)