82 resultados para Process power plant
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Agronomia - FEIS
Resumo:
Pós-graduação em Agronomia - FEIS
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Agronomia (Energia na Agricultura) - FCA
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Agronomia - FEIS
Resumo:
Pós-graduação em Aquicultura - FCAV
Resumo:
Pós-graduação em Artes - IA
Resumo:
Pós-graduação em Engenharia Civil - FEIS
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Revolving machines are among the most used equipment in general industry and therefore expenditures on this equipment class are a significant portion of the total amount spent by the company. If there is an unscheduled stop of some of this equipment, industrial plants can lose huge amounts of money caused by interrupted production and parts delay. Others may increase significantly maintenance costs due to consequences elsewhere not affected before. Even plant and people safety can be in danger if there is an operation interruption without a backup system start. This work is focused on a rotating system case study which is monitored by vibration analysis that shows that is possible to determine when is the most appropriate time for equipment intervention without any reliability loss just by using a simple and cheap system which is not much used because professionals are not aware to its utility. Industrial facilities were evaluated by fail detection and historical analysis in some equipment in order to show feasibility of vibration analysis through a before-during-after process. The plant evaluated is part of a chemical multinational located in Guaratinguetá-SP. At this time, that plant had around 650 critical equipment monthly monitored and no unscheduled shutdown was registered in one year period due to equipment monitoring