39 resultados para power grid
Resumo:
In dealing with computer networks, these allow the flow of information through the resources of various equipment's. This work describes the implementation through the encapsulation of Protocol DNP3, usually employed in Smart Grid communication, in a simulator of discrete events. The NS-2 is a simulator in open source of network events, that facilitate the development of communication networks scenarios considering the protocols involved, in wireless or wired technologies. The objective of this work is to develop the DNP3 protocol encapsulation over a TCP/IP in the in the discrete event Simulator NS-2, allowing an analysis of behavior of a middle or large network sized in Smart Grid applications. © 2013 IEEE.
Resumo:
This paper presents simulation results of the DNP3 communication protocol over a TCP/IP network, for Smart Grid applications. The simulation was performed using the NS-2 network simulator. This study aimed to use the simulation to verify the performance of the DNP3 protocol in a heterogeneous LAN. Analyzing the results it was possible to verify that the DNP3 over a heterogeneous traffic network, with communication channel capacity between 60 and 85 percent, it works well with low packet loss and low delay, however, with traffic values upper 85 percent, the DNP3 usage becomes unfeasible because the information lost, re-transmissions and latency are significantly increased. © 2013 IEEE.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Faced with an imminent restructuring of the electric power system, over the past few years many countries have invested in a new paradigm known as Smart Grid. This paradigm targets optimization and automation of electric power network, using advanced information and communication technologies. Among the main communication protocols for Smart Grids we have the DNP3 protocol, which provides secure data transmission with moderate rates. The IEEE 802.15.4 is another communication protocol also widely used in Smart Grid, especially in the so-called Home Area Network (HAN). Thus, many applications of Smart Grid depends on the interaction of these two protocols. This paper proposes modeling, in the traditional network simulator NS-2, the integration of DNP3 protocol and the IEEE 802.15.4 wireless standard for low cost simulations of Smart Grid applications.
Resumo:
The technologies are advancing at a pace so expressive that allow the increase of the power quality from generation until the distribution to end customers. This improvement has been made possible through the automation of the energy that follows to a better quality of the energy provided, a lower energy supply disruptions and a very short recovery time. The trend of today and the near future is the distributed energy generation. To keep the automated control of the chain, the presence of Smart Grids is needed and that will be the most efficient and economical way to manage the entire system. Within this theme, is going to be necessary analyze the electric cars that promise to promote a more sustainable transport because it doesn’t uses fossil fuels, and more healthy because it does not emit pollutants into the atmosphere. The popularization of this type of vehicle is estimated to happen in a few decades and the case study analyzing its influence on the demand of the electrical system is something that will be very important in the near future. This paper presents a study of the influence of the inclusion of charges refering to electric cars
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
In a smart grid environment, attention should be paid not only to the power supplied to satisfy loads and system losses but also to the services necessary to provide security and stability to the system: the so-called ancillary services. As they are well known the benefits that distributed generation can bring to electrical systems and to the environment, in this work the possibility that active power reserve for frequency control could be provided by distributed generators (DGs) in an efficient and economical way is explored. The proposed methodology was tested using the IEEE 34-bus distribution test system. The results show improvements in the capacity of the system for this ancillary service and decrease in system losses and payments of the distribution system operator to the DGs.