207 resultados para Variable Sampling Interval Control Charts


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper deals with the joint economic design of x̄ and R charts when the occurrence times of assignable causes follow Weibull distributions with increasing failure rates. The variable quality characteristic is assumed to be normally distributed and the process is subject to two independent assignable causes (such as tool wear-out, overheating, or vibration). One cause changes the process mean and the other changes the process variance. However, the occurrence of one kind of assignable cause does not preclude the occurrence of the other. A cost model is developed and a non-uniform sampling interval scheme is adopted. A two-step search procedure is employed to determine the optimum design parameters. Finally, a sensitivity analysis of the model is conducted, and the cost savings associated with the use of non-uniform sampling intervals instead of constant sampling intervals are evaluated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this article, we consider the synthetic control chart with two-stage sampling (SyTS chart) to control the process mean and variance. During the first stage, one item of the sample is inspected; if its value X, is close to the target value of the process mean, then the sampling is interrupted. Otherwise, the sampling goes on to the second stage, where the remaining items are inspected and the statistic T = Sigma [x(i) - mu(0) + xi sigma(0)](2) is computed taking into account all items of the sample. The design parameter is function of X-1. When the statistic T is larger than a specified value, the sample is classified as nonconforming. According to the synthetic procedure, the signal is based on Conforming Run Length (CRL). The CRL is the number of samples taken from the process since the previous nonconforming sample until the occurrence of the next nonconforming sample. If the CRL is sufficiently small, then a signal is generated. A comparative study shows that the SyTS chart and the joint X and S charts with double sampling are very similar in performance. However, from the practical viewpoint, the SyTS chart is more convenient to administer than the joint charts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this article, we evaluate the performance of the T2 chart based on the principal components (PC chart) and the simultaneous univariate control charts based on the original variables (SU X̄ charts) or based on the principal components (SUPC charts). The main reason to consider the PC chart lies on the dimensionality reduction. However, depending on the disturbance and on the way the original variables are related, the chart is very slow in signaling, except when all variables are negatively correlated and the principal component is wisely selected. Comparing the SU X̄, the SUPC and the T 2 charts we conclude that the SU X̄ charts (SUPC charts) have a better overall performance when the variables are positively (negatively) correlated. We also develop the expression to obtain the power of two S 2 charts designed for monitoring the covariance matrix. These joint S2 charts are, in the majority of the cases, more efficient than the generalized variance |S| chart.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The VSS X- chart is known to perform better than the traditional X- control chart in detecting small to moderate mean shifts in the process. Many researchers have used this chart in order to detect a process mean shift under the assumption of known parameters. However, in practice, the process parameters are rarely known and are usually estimated from an in-control Phase I data set. In this paper, we evaluate the (run length) performances of the VSS X- control chart when the process parameters are estimated and we compare them in the case where the process parameters are assumed known. We draw the conclusion that these performances are quite different when the shift and the number of samples used during the phase I are small. ©2010 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEG

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O presente estudo avaliou a digestibilidade aparente da proteína e da energia de ingredientes (farelo de soja, farinha de peixe, farelo de trigo e milho) por juvenis de apaiari (Astronotus ocellatus) usando dois diferentes intervalos de coleta (30 min. e 12h). Os 160 juvenis de apaiari utilizados (22,37 ± 3,06 g de peso corporal) foram divididos em quatro tanques rede plásticos e cilíndricos, cada um colocado em um tanque de alimentação de 1.000 L. O experimento foi inteiramente casualizado em esquema fatorial 2 x 4 (2 intervalos de coleta de fezes e 4 ingredientes foram) com quatro repetições. Os testes estatísticos não detectaram efeito da interação entre o intervalo de coleta e tipo de ingrediente nos coeficientes de digestibilidade. O intervalo de coleta não afetou a digestibilidade da proteína e da energia. As características físicas das fezes dos juvenis de apaiari aparentemente as tornam menos sensíveis à perda de nutrientes por lixiviação, permitindo intervalos de coleta maiores. A digestibilidade da proteína dos ingredientes avaliados foi semelhante, mostrando que a digestibilidade aparente de ingredientes animais e vegetais por juvenis de apaiari é eficiente. Os coeficientes de digestibilidade da energia foram maiores para a farinha de peixe e o farelo de soja comparado a farelo de trigo e milho. Ingredientes ricos em carboidratos (farelo de trigo e milho) apresentaram os piores coeficientes de digestibilidade da energia e, portanto, não são usados eficientemente pelos juvenis de apaiari.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this article we consider a control chart based on the sample variances of two quality characteristics. The points plotted on the chart correspond to the maximum value of these two statistics. The main reason to consider the proposed chart instead of the generalized variance |S| chart is its better diagnostic feature, that is, with the new chart it is easier to relate an out-of-control signal to the variables whose parameters have moved away from their in-control values. We study the control chart efficiency considering different shifts in the covariance matrix. In this way, we obtain the average run length (ARL) that measures the effectiveness of a control chart in detecting process shifts. The proposed chart always detects process disturbances faster than the generalized variance |S| chart. The same is observed when the size of the samples is variable, except in a few cases in which the size of the samples switches between small size and very large size.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents necessary and sufficient conditions to turn a linear time-invariant system with p outputs, m inputs, p greater-than-or-equal-to m and using only inputs and outputs measurements into a Strictly Positive Real (SPR).Two results are presented. In the first, the system compensation is made by two static compensators, one of which forward feeds the outputs and the second back feeds the outputs of the nominal system.The second result presents conditions for the Walcott and Zak variable structure observer-controller synthesis. In this problem, if the nominal system is given by {A,B,C}, then the compensated system is given by {A+GC,B,FC} where F and G are the constant compensation matrices. These results are useful in the control system with uncertainties.