138 resultados para Transmission systems
Resumo:
With the growth of the demand on electric energy in the last decades, the urban distribution and transmission systems have experienced a bigger necessity to improve on the substations, the automation procedures and techniques on the operation maneuvers of such systems, in a sense that better attends the quality levels, availability, continuity and operational reliability. In this way, the objective of the present paper is to perform a study of protection and control on an electrical industrial system involving the procedures of digitizing and maneuvers automatism utilizing operational techniques and other pertinent information used in a typical high-voltage Industrial Electrical System. Analysis were made on short-circuits to specify the main components of the 138 [kV] substation, in addition, there were used digital MiCOM relays to make the protection of the present elements. With that, a program was developed to allow the user to monitor the condition of circuit-breakers through a supervision screen being able to simulate some kinds of faults, as well as observing the characteristics of each device. This way, the importance of having a fast and reliable system that ensures the equipment’s protection and the industrial process continuity due to faults on the electrical system is noticeable. It’s important to highlight that all this digitizing was mainly favored by the development of digital technology on the last years, mainly on microelectronics, also with the appearance of supervision gadgets allowing the development of complex systems in supervision and electric energy control
Singular value analyses of voltage stability on power system considering wind generation variability
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
This paper presents a mixed-integer convex-optimization-based approach for optimum investment reactive power sources in transmission systems. Unlike some convex-optimization techniques for the reactive power planning solution, in the proposed approach the taps settings of under-load tap-changing of transformers are modeled as a mixed-integer linear set equations. Are also considered the continuous and discrete variables for the existing and new capacitive and reactive power sources. The problem is solved for three significant demand scenarios (low demand, average demand and peak demand). Numerical results are presented for the CIGRE-32 electric power system.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
The data of four networks that can be used in carrying out comparative studies with methods for transmission network expansion planning are given. These networks are of various types and different levels of complexity. The main mathematical formulations used in transmission expansion studies-transportation models, hybrid models, DC power flow models, and disjunctive models are also summarised and compared. The main algorithm families are reviewed-both analytical, combinatorial and heuristic approaches. Optimal solutions are not yet known for some of the four networks when more accurate models (e.g. The DC model) are used to represent the power flow equations-the state of the art with regard to this is also summarised. This should serve as a challenge to authors searching for new, more efficient methods.
Resumo:
Modal analysis is widely approached in the classic theory of power systems modelling. This technique is also applied to model multiconductor transmission lines and their self and mutual electrical parameters. However, this methodology has some particularities and inaccuracies for specific applications, which are not clearly described in the technical literature. This study provides a brief review on modal decoupling applied in transmission line digital models and thereafter a novel and simplified computational routine is proposed to overcome the possible errors embedded by the modal decoupling in the simulation/ modelling computational algorithm. © The Institution of Engineering and Technology 2013.
Resumo:
Little attention has been paid to the possibility of transmission of Salmonella in intensive pig production systems through alternate methods, such as airborne or direct nose-to-nose contact. This experimental study tested the hypothesis of nose-to-nose transmission of Salmonella enterica serovars Typhimurium (Trial I) and Agona (Trial II) in weaned pigs using stainless steel/ glass isolation cabinets. In each trial, cabinet 1 (control pigs) and cabinet 2 (sentinel pigs) were connected directly to the fan unit. Cabinet 3 (seeded pigs) was not directly linked to the fan, but was arranged to receive a constant unidirectional airflow from cabinet 2 (sentinel pigs) through a 10 cm diameter hole, which also allowed nose-to-nose contact between pigs housed in these two cabinets. Air was taken out of the system through ducts connecting cabinets 1 and 3 to the exhauster. Therefore, direct contact among seeded and sentinel pigs was allowed but possible aerial transference of contaminated particles between those cabinets was prevented. The system was opened 21 days post-inoculation and tissue samples were collected for bacteriological analysis. The recovery of nalidixic acid-resistant Salmonella Typhimurium from sentinel pigs corroborates the hypothesis of nose-to-nose transmission of that pathogen in pigs. However, serovar-related differences might exist regarding the nose-to-nose transmissibility of Salmonella in pigs, since Salmonella Agona was not detected in sentinel pigs (Trial II). Published by Elsevier B.V.
Resumo:
Economic dispatch (ED) problems have recently been solved by artificial neural network approaches. Systems based on artificial neural networks have high computational rates due to the use of a massive number of simple processing elements and the high degree of connectivity between these elements. The ability of neural networks to realize some complex non-linear function makes them attractive for system optimization. All ED models solved by neural approaches described in the literature fail to represent the transmission system. Therefore, such procedures may calculate dispatch policies, which do not take into account important active power constraints. Another drawback pointed out in the literature is that some of the neural approaches fail to converge efficiently toward feasible equilibrium points. A modified Hopfield approach designed to solve ED problems with transmission system representation is presented in this paper. The transmission system is represented through linear load flow equations and constraints on active power flows. The internal parameters of such modified Hopfield networks are computed using the valid-subspace technique. These parameters guarantee the network convergence to feasible equilibrium points, which represent the solution for the ED problem. Simulation results and a sensitivity analysis involving IEEE 14-bus test system are presented to illustrate efficiency of the proposed approach. (C) 2004 Elsevier Ltd. All rights reserved.
Resumo:
The paper proposes a framework for the analysis and representation of external systems for online optimisation studies. The basis for this framework is the equivalent OPF (EOPF), an optimisation model obtained by partitioning of the OPF model. The EOPF is mathematically redefined in the paper to accommodate the concept of a buffer zone. The resulting model is more useful for online optimisation, since external information obtained through intercontrol-centre exchange contracts can be used to improve internal control calculation. Numerical results obtained with original studies involving the boundary-matching procedure have provided a conceptual basis for the definition of a buffer zone for optimisation studies with the EOPF. In the proposed framework, the accuracy of the external representation in optimisation studies is evaluated by comparing the controls obtained by an EOPF procedure with those obtained by the reference-optimisation procedure defined in this paper. The framework is then used to evaluate the accuracy of equivalent optimisation studies involving the IEEE 118-bus test system and the Brazilian South Southeast 810-bus system. The results show that the incorporation of a buffer zone improves the external system representation for all optimisation studies performed.
Resumo:
This work presents a methodology to analyze transient stability (first oscillation) of electric energy systems, using a neural network based on ART architecture (adaptive resonance theory), named fuzzy ART-ARTMAP neural network for real time applications. The security margin is used as a stability analysis criterion, considering three-phase short circuit faults with a transmission line outage. The neural network operation consists of two fundamental phases: the training and the analysis. The training phase needs a great quantity of processing for the realization, while the analysis phase is effectuated almost without computation effort. This is, therefore the principal purpose to use neural networks for solving complex problems that need fast solutions, as the applications in real time. The ART neural networks have as primordial characteristics the plasticity and the stability, which are essential qualities to the training execution and to an efficient analysis. The fuzzy ART-ARTMAP neural network is proposed seeking a superior performance, in terms of precision and speed, when compared to conventional ARTMAP, and much more when compared to the neural networks that use the training by backpropagation algorithm, which is a benchmark in neural network area. (c) 2005 Elsevier B.V. All rights reserved.
Resumo:
This article presents a well-known interior point method (IPM) used to solve problems of linear programming that appear as sub-problems in the solution of the long-term transmission network expansion planning problem. The linear programming problem appears when the transportation model is used, and when there is the intention to solve the planning problem using a constructive heuristic algorithm (CHA), ora branch-and-bound algorithm. This paper shows the application of the IPM in a CHA. A good performance of the IPM was obtained, and then it can be used as tool inside algorithm, used to solve the planning problem. Illustrative tests are shown, using electrical systems known in the specialized literature. (C) 2005 Elsevier B.V. All rights reserved.
Resumo:
This work presents an approach for geometric solution of an optimal power flow (OPF) problem for a two bus system (a slack and a PV busses). Additionally, the geometric relationship between the losses minimization and the increase of the reactive margin and, therefore, the maximum loading point, is shown. The algebraic equations for the calculation of the Lagrange multipliers and for the minimum losses value are obtained. These equations are used to validate the results obtained using an OPF program. (C) 2002 Elsevier B.V. B.V. All rights reserved.