194 resultados para Anchoring heuristic


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents an interior point method for the long-term generation scheduling of large-scale hydrothermal systems. The problem is formulated as a nonlinear programming one due to the nonlinear representation of hydropower production and thermal fuel cost functions. Sparsity exploitation techniques and an heuristic procedure for computing the interior point method search directions have been developed. Numerical tests in case studies with systems of different dimensions and inflow scenarios have been carried out in order to evaluate the proposed method. Three systems were tested, with the largest being the Brazilian hydropower system with 74 hydro plants distributed in several cascades. Results show that the proposed method is an efficient and robust tool for solving the long-term generation scheduling problem.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, a multi-objective approach for observing the performance of distribution systems with embedded generators in the steady state, based on heuristic and power system analysis, is proposed. The proposed hybrid performance index describes the quality of the operating state in each considered distribution network configuration. In order to represent the system state, the loss allocation in the distribution systems, based on the Z-bus loss allocation method and compensation-based power flow algorithm, is determined. Also, an investigation of the impact of the integration of embedded generators on the overall performance of the distribution systems in the steady state, is performed. Results obtained from several case studies are presented and discussed. Copyright (C) 2004 John Wiley Sons, Ltd.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This article presents a well-known interior point method (IPM) used to solve problems of linear programming that appear as sub-problems in the solution of the long-term transmission network expansion planning problem. The linear programming problem appears when the transportation model is used, and when there is the intention to solve the planning problem using a constructive heuristic algorithm (CHA), ora branch-and-bound algorithm. This paper shows the application of the IPM in a CHA. A good performance of the IPM was obtained, and then it can be used as tool inside algorithm, used to solve the planning problem. Illustrative tests are shown, using electrical systems known in the specialized literature. (C) 2005 Elsevier B.V. All rights reserved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper proposes a methodology to achieve integrated planning and projects for secondary distribution circuits. The planning model is formulated as a mixed integer nonlinear programming problem (MINLP). In order to resolve this problem, a tabu search (TS) algorithm is used, with a neighborhood structure developed to explore the physical characteristics of specific geographies included in the planning and expansion of secondary networks, thus obtaining effective solutions as well as low operating costs and investments. The project stage of secondary circuits consists of calculating the mechanical efforts to determine the support structures of the primary and secondary distribution systems and determining the types of structures that should be used in the system according to topological and electrical parameters of the network and, therefore, accurately assessing the costs involved in the construction and/or reform of secondary systems. A constructive heuristic based on information of the electrical and topological conditions between the medium voltage and low voltage systems is used to connect the primary systems and secondary circuits. The results obtained from planning and design simulations of a real secondary system of electric energy distribution are presented.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Neste trabalho é analisada a aplicação de algoritmos heurísticos para o Modelo Híbrido Linear - Hybrid Linear Model (HLM) - no problema de planejamento da expansão de sistemas de transmissão. O HLM é um modelo relaxado que ainda não foi suficientemente explorado. Assim, é realizada uma análise das características do modelo matemático e das técnicas de solução que podem ser usadas para resolver este tipo de modelo. O trabalho analisa em detalhes um algoritmo heurístico construtivo para o HLM e faz uma extensão da modelagem e da técnica de solução para o planejamento multi-estágio da expansão de sistemas de transmissão. Dentro deste contexto, também é realizada uma avaliação da qualidade das soluções encontradas pelo HLM e as possibilidades de aplicação deste modelo em planejamento de sistemas de transmissão. Finalmente, são apresentados testes com sistemas conhecidos na literatura especializada.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

OBJETIVO: avaliar o sistema de forças gerado pela mola T utilizada para fechamento de espaços. MÉTODOS: por meio do método experimental fotoelástico, avaliou-se a mola T utilizada no fechamento de espaços com duas variações de pré-ativação em sua porção apical, sendo uma com 30º e a outra com 45º. As molas foram confeccionadas com fio retangular de titânio-molibdênio (TMA) de secção 0,017 x 0,025, centralizadas no espaço interbraquetes de 27mm e ativadas em 5,0mm, 2,5mm e posição neutra. Para melhor confiabilidade dos resultados, os testes foram repetidos em três modelos fotoelásticos igualmente reproduzidos e confeccionados pelo mesmo operador. Para compreensão dos resultados, as franjas fotoelásticas visualizadas no polariscópio foram fotografadas e analisadas qualitativamente. RESULTADOS: por meio da análise qualitativa da ordem de franjas no modelo fotoelástico, notou-se que, nas extremidades de retração e ancoragem, a mola T com 30º de ativação apical apresentou um acúmulo de energia discretamente maior para o sistema de forças liberado.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Cimetidine, referred as antiandrogenic agent, has caused alterations in the seminiferous tubules, including alterations in the peritubular tissue and death of myoid cells by apoptosis. Regarding the structural and functional importance of the peritubular tissue for the maintenance of Sertoli cells (SC), we purpose to investigate the SC-basement membrane interface, focusing the morphological features of SC and their interaction with the basement membrane in the affected tubules by cimetidine. Ten animals were distributed into two groups, control (CG) and cimetidine (CmG) which received saline solution and 50 mg of cimetidine per kg of body weight, respectively, for 52 days. The testes were fixed, dehydrated and embedded for analyses under light and transmission electron microscopy. Paraffin sections were submitted to the TUNEL method; sections of testes embedded in glycol methacrylate were submitted to PAS method and stained by H&E for morphological and quantitative analyses of Sertoli Cells. In the CmG, the SC nuclei were positive to the TUNEL method and showed typical morphological alterations of cell death by apoptosis (from early to advanced stages). A significant reduction in the number of Sertoli Cells was probably due to death of these cells by apoptosis. A close relationship between SC nuclear alterations (including a high frequency of dislocated nuclei from the basal portion) and damage in the peritubular tissue was observed. The ultrastructural analysis showed a parallelism between the gradual advancement of apoptotic process in SC and detachment of the anchoring sites (hemidesmosomes) of SC plasma membrane from the lamina densa. The presence of portions of lamina densa underlying the detached hemidesmosomes indicates a continuous deposition of lamina densa, resulting in the thickening of the basal lamina. The results indicate a possible disarrangement of the SC cytoskeleton, including the focal adhesion structure. These alterations are related to SC apoptosis and probably result from disturbs induced by cimetidine on the peritubular tissue.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We re-evaluated the larval support for families within majoids using the Wilcoxon signed-rank test with emphasis on Inachoididae. To accomplish our objectives, we added 10 new taxa, two of which are traditionally assigned to the family of special interest, to a previous larval database for majoids, and re-appraised the larval characters used in earlier studies. Phylogenetic analysis was performed with PAUP* using the heuristic search with 50 replicates or the branch-and-bound algorithm when possible. Multi-state transformation series were considered unordered; initially characters were equally weighted followed by successive weighting, and trees were rooted at the Oregoniidae node. Ten different topological constraints were enforced for families to evaluate tree length under the assumption of monophyly for each taxonomic entity. Our results showed that the tree length of most constrained topologies was not considerably greater than that of unconstrained analysis in which most families nested as paraphyletic taxa. This may indicate that the present larval database does not provide strong support for paraphyly of the taxa in question. For Inachoididae, although the Wilcoxon signed-rank test rejected a significant difference between unconstrained and constrained cladograms, we were unable to provide a single synapomorphy for this clade. Except for the conflicting position of Leurocyclus and Stenorhynchus, the two clades correspond to the traditional taxonomic arrangement. Among inachoidids, the clade (Anasimus (Paradasygyius (Collodes + Pyromaia))) is supported, whereas for inachids, the clade (Inachus (Macropodia + Achaeus)) is one of the most supported clades within majids. As often stated, only additional characters will provide a better test for the monophyly of Inachoididae and other families within Majoidea.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper deals with the design of a network-on-chip reconfigurable pseudorandom number generation unit that can map and execute meta-heuristic algorithms in hardware. The unit can be configured to implement one of the following five linear generator algorithms: a multiplicative congruential, a mixed congruential, a standard multiple recursive, a mixed multiple recursive, and a multiply-with-carry. The generation unit can be used both as a pseudorandom and a message passing-based server, which is able to produce pseudorandom numbers on demand, sending them to the network-on-chip blocks that originate the service request. The generator architecture has been mapped to a field programmable gate array, and showed that millions of numbers in 32-, 64-, 96-, or 128-bit formats can be produced in tens of milliseconds. (C) 2011 Elsevier B.V. All rights reserved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Neste trabalho estuda-se um problema de dimensionamento de lotes e distribuição que envolve além de custos de estoques, produção e preparação, custos de transportes para o armazém da empresa. Os custos logísticos estão associados aos contêineres necessários para empacotar os produtos produzidos. A empresa negocia um contrato de longo prazo onde um custo fixo por período é associado ao transporte dos itens, em contrapartida um limite de contêineres é disponibilizado com custo mais baixo que o custo padrão. Caso ocorra um aumento ocasional de demanda, novos contêineres podem ser utilizados, no entanto, seu custo é mais elevado. Um modelo matemático foi proposto na literatura e resolvido utilizando uma heurística Lagrangiana. No presente trabalho a resolução do problema por uma heurística Lagrangiana/surrogate é avaliada. Além disso, é considerada uma extensão do modelo da literatura adicionando restrições de capacidade e permitindo atraso no atendimento a demanda. Testes computacionais mostraram que a heurística Lagrangiana/surrogate é competitiva especialmente quando se têm restrições de capacidade apertada.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

It has been proposed that the multiple-platform method (MP) for desynchronized sleep (DS) deprivation eliminates the stress induced by social isolation and by the restriction of locomotion in the single-platform (SP) method. MP, however, induces a higher increase in plasma corticosterone and ACTH levels than SP. Since deprivation is of heuristic value to identify the functional role of this state of sleep, the objective of the present study was to determine the behavioral differences exhibited by rats during sleep deprivation induced by these two methods. All behavioral patterns exhibited by a group of 7 albino male Wistar rats submitted to 4 days of sleep deprivation by the MP method (15 platforms, spaced 150 mm apart) and by 7 other rats submitted to sleep deprivation by the SP method were recorded in order to elaborate an ethogram. The behavioral patterns were quantitated in 10 replications by naive observers using other groups of 7 rats each submitted to the same deprivation schedule. Each quantification session lasted 35 min and the behavioral patterns presented by each rat over a period of 5 min were counted. The results obtained were: a) rats submitted to the MP method changed platforms at a mean rate of 2.62 ± 1.17 platforms h-1 animal-1; b) the number of episodes of noninteractive waking patterns for the MP animals was significantly higher than that for SP animals (1077 vs 768); c) additional episodes of waking patterns (26.9 ± 18.9 episodes/session) were promoted by social interaction in MP animals; d) the cumulative number of sleep episodes observed in the MP test (311) was significantly lower (chi-square test, 1 d.f., P<0.05) than that observed in the SP test (534); e) rats submitted to the MP test did not show the well-known increase in ambulatory activity observed after the end of the SP test; f) comparison of 6 MP and 6 SP rats showed a significantly shorter latency to the onset of DS in MP rats (7.8 ± 4.3 and 29.0 ± 25.0 min, respectively; Student t-test, P<0.05). We conclude that the social interaction occurring in the MP test generates additional stress since it increases the time of forced wakefulness and reduces the time of rest promoted by synchronized sleep.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)